Bills of quantities

BoQs and offers, priced with resource analysis

BuildColab is construction project management software, built in Bulgaria, in which the bill of quantities (BoQ, Bulgarian КСС) is built, priced and versioned in one place. You import the BoQ from Excel or enter it by hand, price every position with a resource analysis (materials, labour, machinery and services, plus additional costs and profit) and export the offer to Excel.

Data stored on Google Cloud in the European Union

What is a bill of quantities in BuildColab?

A bill of quantities (BoQ, in Bulgarian КСС) is the priced list of work for a project: a tree of categories (subsections) that hold positions (work items), each with a description, unit of measure, quantity, unit price and value. In BuildColab an offer and a BoQ are the same document: the offer is the commercial proposal, the BoQ is the table of positions and prices behind it.

The same structure sits behind an investor’s budget draft, a contractor’s offer, an offer request to subcontractors and a signed contract, and they all open in the same BoQ editor. The unit price of each position comes from its resource analysis or is typed in directly, while values, category totals and the total value are calculated automatically.

What does working with BoQs in BuildColab include?

Everything between the client’s Excel file and the priced offer.

  • BoQ import from Excel

    The client’s file (.xlsx or .xls) is loaded with automatic recognition of the columns and the category tree. Errors and unit price conflicts are fixed before saving.

  • Resource analysis for every position

    The unit price is built from materials, labour, machinery and services with consumption rates, delivery costs and factors, plus additional costs per resource type and profit.

  • Task templates and price history

    Priced analyses are kept in the template’s history across all of the company’s projects. An earlier analysis is applied in one click, and BORO suggests the matching template.

  • Profit and additional costs

    Set the percentages on one position or at once on a category or the whole BoQ. Unit prices and totals recalculate immediately; there is no Recalculate button.

  • Versions and comparison

    Finish base locks the quantities as received. Compare the BoQ with an earlier version line by line, or several drafts and offers side by side.

  • Excel export

    The standard layout or the current prices written into the original imported file, with one unit price or a material / labour split, and with a company letterhead.

How do you price a BoQ in BuildColab?

  1. BoQ document

    Create a new offer on the Offers page or, as an investor, a new budget draft on the Drafts page.

  2. Quantities

    Import the client’s Excel file or build the categories and positions by hand. Finish base locks the received quantities as version 1.

  3. Resource analyses

    Tick a position and build its analysis, or apply an analysis from the template’s history. Identical positions in one BoQ share one analysis and one price.

  4. Profit, version and export

    Set additional costs and profit, check the totals, save a version and export the offer to Excel.

What do КС, КСС, СМР and resource analysis mean?

In Bulgarian practice a КС (количествена сметка) lists only the works and quantities, usually as received from the client, while a КСС (количествено-стойностна сметка) is the same table of construction and installation works (СМР) with prices, a priced bill of quantities. Each line is a position with a description, unit of measure, quantity, unit price and value; positions are grouped in categories (subsections), and the value is quantity × unit price.

A resource analysis (ресурсен анализ) explains how the unit price of one position is built: which materials, labour, machinery and services one unit of the work consumes, at what prices, plus additional costs per resource type and profit. A position can also be priced with a direct price; then it has no breakdown and 0% profit.

  • Materials: price per unit, with delivery and storage costs (ДСР %) and an additional factor
  • Labour: in man-hours at an hourly rate
  • Machinery: in machine-days at a daily rate
  • Services: free text, at a price per unit of service
  • Additional costs: a separate percentage for each resource type
  • Profit: a percentage of the analysis’s total costs

Why is it better than a BoQ in Excel?

Topic BoQ in Excel BoQ in BuildColab
Unit price Formulas and separate analysis sheets A resource analysis on every position, recalculated automatically
Identical work Can end up with different prices Identical positions share one analysis and one price
Prices from past jobs Searching through old files Template price history across all company projects
Quantity changes Compared by hand Locked versions and a line-by-line comparison
Profit on the whole BoQ Editing formulas sheet by sheet One percentage for the selected positions or the whole BoQ
Subcontractor requests A separate file by e-mail An offer request from selected positions and a comparison of the offers received

Frequently asked questions

Can I import a BoQ from Excel?

Yes. The import accepts .xlsx (recommended) and .xls, recognizes the columns and the category tree, and lets you fix errors and unit price conflicts before saving. CSV and PDF are not accepted.

Can I import a BoQ together with its resource analyses?

Yes, with Import with analyses: an XLSX file with each position’s analysis below it in the sections МАТЕРИАЛИ:, МЕХАНИЗАЦИЯ:, ТРУД: and ДОП. РАЗХОДИ:, usually an export from estimating software. Missing task templates, materials, labour and machines are created in the company library.

Does every position need a resource analysis?

No. You can type the unit price directly into the Unit price cell. The position then has no breakdown and 0% profit, and its earlier analysis is removed from the current version.

Can I reuse prices from earlier projects?

Yes. When positions are linked to a task template, every priced analysis is kept in the template’s price history across the company’s projects. Open the history, preview an earlier analysis and apply it in one click.

Does the BoQ total include VAT?

No. A BoQ does not add VAT: totals are sums of quantity × unit price as entered.

How do I send a BoQ without prices to a subcontractor?

Send the selected positions as an offer request, or export from the offer request view: the file is generated with an empty Unit price column for the subcontractor to fill in.

Can the AI assistant BORO work on my BoQ?

Yes. BORO can read the BoQ, create categories and positions, edit resource analyses, apply analyses from history, set profit and import files. In the BORO panel, every change BORO proposes waits for your approval by default.

See the whole path of a project: BuildColab for construction companies

See a BoQ of your own priced

In the demo we walk the whole path: from the client’s Excel file to a priced offer with resource analyses.

Book a demo