File manager

Construction documents: one current version for everyone

BuildColab is construction project management software, built in Bulgaria, with a built-in file manager for the project’s documents. Drawings, contracts, minutes and photos live in a folder tree with version history; Word, Excel and PDF files open and are edited in the browser, DWG, RVT and IFC are viewed with no software installed, and access is granted file by file.

Data stored on Google Cloud in the European Union

What is the file manager in BuildColab?

The file manager is where the construction team keeps the project’s documents. Instead of email attachments and shared drives, every drawing, contract and specification sits in one folder tree, with one current version and a full history. When the designer uploads a revised drawing, the file carries the “Revised” label for seven days and the people with access are notified.

There are two file spaces that work the same way: project files (drawings, permits, contracts, minutes, site photos and models) and company files for shared documents such as templates, certificates and standard contracts. The file manager is connected to the rest of BuildColab: you attach documents from it to requests for quotation, and the original Excel files of BOQ imports and every BOQ export are kept in the separate “BOQ documents” tab.

What does the file manager in BuildColab include?

Everything between uploading a file and the latest version the whole team is looking at.

  • Project and company folders

    A folder tree with a description for every file and folder. Upload single files or a whole folder from your computer with its structure kept, and move several items at once.

  • Versions of every file

    The new version becomes current while the old ones stay untouched, numbered, with author and date. Restoring an old version does not delete the newer ones.

  • Word, Excel and PDF in the browser

    Edit DOCX and XLSX, annotate PDFs and fill in forms without downloading the file. Every save is a new version, and the previous content stays in the history.

  • DWG, RVT and IFC with no software installed

    Processed 3D and CAD models open in the browser with measuring and section tools. Pins with comments are placed on the model itself.

  • Sharing and permissions

    Access is set per file and folder: read, comment or edit. Share with colleagues, with a role or with a whole partner company; new files inherit the folder’s access.

  • Comments, search and trash

    Comments on text, a cell or a pin, with @mentions of colleagues. Search across all folders at once, and a trash from which deleted items can be restored for 30 days.

How do you work with documents in BuildColab?

  1. Folder structure

    Create the top-level folders (for example “01 · Drawings”, “02 · Contracts”, “03 · Minutes”) or upload a whole folder from your computer with its structure kept.

  2. Share with the right people

    Share the main folders with the team and the partner companies on the project. Everything you put inside later becomes visible to them automatically, at the same access level.

  3. View, edit and comment

    Open documents and models in the browser, edit and save. Questions are discussed in comments on the file itself and marked as resolved once they are settled.

  4. A new version, not a new file

    When a document changes, upload a new version of the same file. The history stays in one place and everyone opens the latest version by default.

Which construction documents are kept in the file manager?

Everything about one site: the design with its drawings by discipline (architecture, structures, electrical, plumbing, HVAC), permits, contracts and amendments, minutes, certificates, bids, correspondence, site photos and video, BIM models. Company files hold the shared documents: templates, policies, certificates, standard contracts and price lists.

The file manager works with the formats this documentation already comes in. Word, Excel, PDF, Markdown, text and CSV files open in an editor in the browser, images in a quick preview, and 3D and CAD models in a viewer after processing. Any other file is stored, shared and downloaded as usual, with the same versions and permissions.

  • Drawings and models: DWG, DXF, DWF, RVT, RFA, IFC, NWD, NWC and more
  • Documents: Word (DOCX), Excel (XLSX, XLS), PDF, Markdown, text and CSV
  • Site photos and video, uploaded from the mobile app too
  • A “BOQ documents” tab with the BOQ imports and exports
  • A “Headers” tab with the company letterheads for BOQ export
  • Download several files at once as a ZIP archive

Why is it better than email and a shared drive?

Topic Email and a shared drive File manager in BuildColab
Current version Files with “final” and “v2” in the name One file with numbered versions and a “current” marker
Revised drawing Emailed to everyone A “Revised” label and a notification to people with access
Subcontractor access The whole folder or nothing Access per file and folder, at three levels
Comments on a drawing In emails and on printouts On the file itself: text, a cell or a point on the model
DWG and RVT AutoCAD or Revit is needed Open in the browser after processing
Deleted file You look for someone with a copy A 30-day trash, with versions and comments

Frequently asked questions

Do I need AutoCAD or Revit to open the drawings?

No. After processing, RVT, RFA, DWG, DXF, DWF, IFC, NWD, NWC, FBX, OBJ, STL, STEP and other formats open in the browser, with measuring, sections and pins with comments. Processing a model is paid for with credits, only on success, and never starts without your consent.

How do I replace a drawing with a revised one without losing the history?

Open the file’s “Version history” and upload the new version; it must have the same extension as the original. The new version becomes current, the old ones stay in the history, the file keeps its name, sharing and comments, and the people with access are notified.

Who can see the project’s files?

Visibility is personal. You see a file or folder when you created or uploaded it, when it is shared with you (directly, through a folder or through your role) or when you are the company owner. Being on the project does not by itself show its files, so two people on one project may see different content.

Can I share a folder with a subcontractor?

Yes. Share a file or folder with individual people on the project team with read, comment or edit access, or with a whole partner company on the project from the “Organizations” tab. Its employees on the project team then get read access.

What happens when two people edit the same document?

BuildColab does not lock the document. If a colleague saves a newer version while you are editing, the editor tells you and you choose: load their version or save yours as the latest. Either way, both versions stay in the history.

Can I get a deleted file back?

Yes, for 30 days after deletion. The file is restored from the “Trash” tab with all its versions, comments and sharing, and a deleted folder comes back with everything in it. Only the owner of the item or the company owner can delete permanently.

How large a file can I upload?

A single uploaded file can be up to 200 MB. Files up to 25 MB are edited in the browser; larger ones are downloaded, edited on your computer and uploaded as a new version. Executable files and scripts are not accepted.

Can the AI assistant BORO work with the files?

Yes. BORO searches, reads and summarizes files, creates documents and folders, moves and shares them, with your permissions, and by default every change waits for your approval. Drag a file from the file manager into the chat with BORO to ask about its content.

See the whole path of a project: BuildColab for construction companies

See one project’s documents in BuildColab

In the demo we will show the whole path: from folders and sharing to drawing versions and comments on a model.

Book a demo