Credits (BORO, file processing)

On this page
  1. How the credit wallet works
  2. Where you see your credits
  3. What costs credits
  4. How to buy credits
  5. When credits run out
  6. Monthly limits in BORO settings
  7. Common questions
  8. Related
WhereCredit chip under the message field of the BORO panel and in the File manager action bar; Admin (Админ) → Organization (Организация) → BORO credits (BORO кредити) card: /companies/{company}/admin/organization
Who canEvery member of the company sees the balance and the transactions. Only users whose role has Members (Членове) Edit access can buy credit packs or storage add-ons. All plans; the monthly allowance depends on the plan.
RelatedBORO settings, models and credits, 3D/BIM models and processing credits, Recording, transcript and AI insights, Subscription, plans and billing

How the credit wallet works

  • One wallet per company. All members draw from the same balance. When you switch to another company, you see that company's wallet.
  • Included credits. Each plan includes a number of credits per month: 10 on Free, 100 on Starter, 400 on Professional, 1,200 on Business (at the time of writing; Enterprise is fair use). At the start of every monthly window the included credits are set to the plan's allowance. Unused included credits do not carry over. On a paid plan the month starts on the same day as your billing period; on Free it follows the calendar month. When you change plan, the included credits are set to the new plan's allowance straight away.
  • Purchased credits. Credit packs you buy are added on top and stay valid for 365 days from purchase.
  • Spending order. BuildColab uses the included credits first, then the purchased pack that expires soonest. Expired packs no longer count.
  • Balance. The balance is included plus purchased credits. Credits can be fractional: the balance shows one decimal, and very small amounts show up to four decimals so a cheap action never appears as zero.

Where you see your credits

The credit chip in the BORO panel

In the BORO panel the credit chip sits under the message field, next to the model chip (Auto). It shows a lightning icon and the balance, for example "412.6 credits". The chip turns orange when the balance falls below 50 credits and red when it reaches 0. Click the chip to open the Credits (Кредити) sheet.

The Credits sheet in the BORO panel

The Credits (Кредити) sheet that opens from the credit chip in the BORO panel shows the balance, a Top up credits (Зареди кредити) button, the split "Included: {included} · Purchased: {topup}", and the list Credit movements (Движение на кредитите) with the last 50 movements grouped by day. Each row shows what the credits were used for, the time, the AI model where relevant, and the amount (minus for spending, plus for refills). A row that came from a BORO conversation has an arrow; click it to reopen that conversation at the reply that cost the credits. "No credit movements yet." means the company has none. Close the sheet with Esc or by clicking outside it.

The BORO panel with the credit chip under the message field and the open Credits sheet
Figure: The credit chip and the Credits sheet in the BORO panel.
  1. The credit chip under the message field shows the balance; click it to open the Credits sheet.
  2. Top up credits opens the credit-pack dialog.
  3. The split between included and purchased credits.
  4. Credit movements lists recent spending and refills, grouped by day.

The credit chip in the File manager

The File manager action bar has its own credit chip, because 3D/CAD processing is paid in credits. Hover it to see the balance; click it to open the Credit transactions (Движение на кредитите) panel with the same balance, Top up credits, the included/purchased split and the last 50 movements. Rows from background tasks carry the badge Background task (Фонова задача). When the balance is low or empty, this panel also shows "BORO cannot reply without credits. Top up or upgrade your plan." with Top up credits and Upgrade plan (Надстрой плана).

State of the File manager chipLookTooltip (EN / BG)
Normal (50 credits or more)Amber lightning icon"Balance: {balance} credits" / „Баланс: {balance} кредита"
Low (below 50)Orange warning triangle"Your credits are running low" / „Кредитите ви са на привършване"
Empty (0 or less)Red warning triangle"Credits exhausted" / „Кредитите са изчерпани"
Transaction label (EN)BulgarianWhat it is
BORO conversationBORO разговорA BORO reply in chat.
BORO background taskBORO фонова задачаWork BORO did in a background task.
BORO task summaryBORO обобщение на задачаBORO's follow-up summary after a background task finished.
3D/CAD processingОбработка на 3D/CADProcessing a 3D/CAD model for browser viewing.
Monthly allowanceМесечно зарежданеThe included credits of the month.
Purchased creditsЗакупени кредитиA credit pack you bought.

Charges for calls from connected AI tools and for meeting transcription and analysis currently appear in the list under technical names (mcp_call, meeting_transcription, meeting_analysis).

The BORO credits card

On Admin → Organization, the BORO credits (BORO кредити) card shows the Balance (Баланс) with Top up credits, a bar "{remaining} / {total} included" for this month's included credits (plus purchased credits still left), and the six most recent credit transactions. Every member can see it.

The BORO credits card on the Organization screen
Figure: The BORO credits card on the Organization screen.
  1. The Balance of the company wallet.
  2. Top up credits opens the credit-pack dialog.
  3. The bar shows the included credits left this month.

What costs credits

ActionHow it is chargedNotes
BORO reply in chatPer reply, by the amount of text the AI model reads and writesEach reply shows "−{credits} credits" (an estimate; the exact charge is in the transactions), and a toast "BORO used {n} credits". Long conversations, large attachments and strong models cost more.
BORO background task and its summarySame way as a replyShown as "Background task · −{n} credits".
Call from a connected AI tool (MCP)A small flat amount per call (by default 0.01 credits)Applies to Claude, ChatGPT and other tools connected to BuildColab.
Meeting transcriptionBy recording length: by default 0.06 credits per minute (3.6 credits per hour)Recording and uploading are free; the charge is made once when the recording is processed.
Meeting analysis (summary, decisions, suggested tasks)Like a BORO reply
3D/CAD model processingPer model; simple formats cost less than complex ones (Revit, Navisworks, IFC)The exact price and the balance after processing are shown before you confirm. Charged only if processing succeeds. A file identical to one already processed in the company is processed free.

Internal helper work, such as searching, ranking results or remembering facts, is not charged. The exact rates can be adjusted by BuildColab; the transactions list always shows what was actually charged.

How to buy credits

  1. Click Top up credits (Зареди кредити) in the Credits sheet of the BORO panel, in the File manager credit panel, on the BORO credits card, or in the out-of-credits message. The dialog Purchase credits (Закупуване на кредити) opens: "Credits are added to your balance immediately."
  2. Click Buy (Купи) next to the pack you want.
  3. The toast "{credits} credits added" (Добавени са {credits} кредита) confirms it, and the balance updates at once.
The Purchase credits dialog with three credit packs
Figure: The Purchase credits dialog.
  1. Each row shows the pack size and its price.
  2. Buy adds the pack to the company balance.
PackPricePrice per creditValid for
100 credits€10€0.10365 days
500 credits€45€0.09365 days
2,000 credits€160€0.08365 days

When credits run out

  • BORO: BORO can start a reply as long as the balance is above zero; a reply may take the balance slightly below what it costs. At zero, BORO refuses the message and shows the banner Credits exhausted (Кредитите са изчерпани): "BORO cannot reply without credits. Top up or upgrade your plan." with Top up credits and Upgrade plan.
  • Meetings: processing a recording needs enough credits up front. Without them the meeting stops with "There are not enough credits to process the recording." (Няма достатъчно кредити за обработката на записа.) and can be retried after you top up.
  • 3D/CAD processing: the processing dialog shows "Not enough credits — {missing} more needed." with Buy credits (Купи кредити). With automatic processing on, a model that cannot be paid for stays unprocessed.
  • Everything else in BuildColab keeps working; only these AI and processing actions stop.

If Upgrade plan in the BORO panel does not open the plans, go to Admin → Subscription and use Manage plan. A larger plan includes more credits every month; see Subscription, plans and billing.

Monthly limits in BORO settings

Apart from the balance, a company can set its own limits on BORO use in BORO Settings → Governance (Управление): a Monthly credit limit (Месечен лимит кредити; default No limit) and Requests per minute (per user). The same page shows usage today and this month. These limits work independently of the balance: BORO can stop because of a limit even when credits are left. See BORO settings, models and credits.

Common questions

Do unused monthly credits carry over to the next month?

No. Included credits are reset to the plan's allowance at the start of each monthly window. Purchased credits are different: they stay for 365 days and are used only after the included credits.

Why did a BORO reply cost more than usual?

The cost depends on how much the AI model reads and writes: long conversations, big attachments, data BORO looked up with tools and stronger models all add to it. Start a new conversation for a new topic. The exact charge of each reply is in Credit movements in the BORO panel, or in Credit transactions in the File manager.

BORO says "Credits exhausted". What can I do?

Click Top up credits and buy a pack; it is added immediately. Buying needs Members at Edit; without it, ask someone who has it (for example the company owner). Or move to a plan with a larger monthly allowance on Admin → Subscription.

Who pays for 3D/CAD processing of files a partner uploaded to our project?

Processing is charged to the company that owns the project's files, so only someone working for that company can start it.

Is recording a meeting charged?

No. Recording and uploading are free. Credits are charged when the recording is transcribed (by length) and analyzed.

Can I see who used the credits?

The transactions list shows what each charge was for, when it happened and which model was used, and BORO rows link to the conversation. A detailed log of BORO and connected-tool actions is in BORO Settings → Governance → Action log.

Can I limit how many credits BORO uses?

Yes. Set a Monthly credit limit in BORO Settings → Governance.

Why do I get "You need «Members» (Edit)" when I click Top up credits?

Only users whose role has Members Edit access can buy credit packs or storage add-ons. Ask your administrator to buy the pack or to give your role Members at Edit on Admin → Roles. You can still use the company's credits.

Do credit packs expire?

Yes, 365 days after purchase. Because included credits are used first, the soonest-expiring pack is used next.