What BORO can do
On this page
- How to read this page
- Getting around and getting answers
- Projects and project team
- Bill of quantities (BoQ)
- GC markup (Надбавка)
- Resource analysis, templates and the company library
- Bulk changes in one step
- Procurement: contracting schedule, offer requests and offers
- Contracts and change orders
- Payment applications
- Budget and finance
- Contract finance
- Construction schedule
- File manager
- Task boards
- Meetings
- Company administration, partners and billing
- Property sales
- Actions that are binding or cannot be undone
- What BORO cannot do
- BORO and connected AI tools (MCP)
- Common questions
- Related
| Where | Top bar → BORO → type your request in Message BORO… (Съобщение до BORO…). Works on any company or project screen. |
|---|---|
| Who can | Every member of the selected company. Each action checks the same permission as the matching screen, for example Outgoing bid requests at Edit to send an offer request, Schedule at Edit to change the schedule, File manager at View to read files. Your plan limits BORO the same way it limits you. BORO reads and edits a bill of quantities only when you hold that document's permission in the project, and the same goes for its answers about money: the cost structure needs Financial dashboard (Финансово табло), Execution (Изпълнение) and Budget preparation (Изготвяне на бюджет); contracts and change orders need Execution and Contract changes (Промени по договор); payment applications need Reports (Отчети), plus Execution for the cost side; offer requests and offers need Outgoing bid requests, Received bid requests (Получени запитвания) and Offers (Оферти); the schedule's money (its reports, pricing report and exports) needs the permission of the BoQ the schedule is priced from (see Permission reference). |
| Related | Chatting and attachments, Approvals and background tasks, Permission reference, Connecting Claude, ChatGPT and others (MCP) |
How to read this page
- Read actions (looking things up, summarizing, comparing, exporting a file) run immediately.
- Approval actions change data. BORO shows a card Requires approval (Изисква одобрение) with what it will do, and waits for Approve (Одобри) or Decline (Откажи). Your company can change this per tool in BORO Settings → Tools. See Approvals and background tasks.
- Binding actions are legally binding, notify another company or cannot be undone. Read their approval card carefully.
- BORO always acts as you: with your permissions, in the company selected in the sidebar. A tool your company set to Blocked is not available to BORO.
- You can write in Bulgarian or English. The examples below are only a start; describe what you need in your own words.
Getting around and getting answers
| BORO can | Example request | Type |
|---|---|---|
| Answer how-to questions from this User Guide, with a link to the page | "How do I send a contract proposal?" | Read |
| Open a screen for you (it asks first unless you asked to go there) | "Open the offer requests of the Hotel Varna project" | Read |
| Tell what is on your screen and work with it | "Summarize this page" | Read |
| Show your work calendar: tasks due and meetings in a period (up to 62 days) | "What do I have this week?", "Which tasks are due by Friday?" | Read |
| List your notifications and mark them read | "What's new in my notifications? Mark them all as read." | Read; marking read: approval |
| Search the web for prices, suppliers, norms and product data, with sources; read a page you paste | "What is the current price of C25/30 concrete in Varna?", "Read this link and list the technical data" | Read |
| Analyze data with Python and produce files (Excel, Word, PowerPoint, PDF), where code analysis is available for your company | "Build an Excel with the monthly payment totals per contractor" | Read; files are saved to the folder BORO in the file manager |
| Remember facts for later conversations | "Remember that our standard profit on labor is 15%" | Approval |
| Run long work as a background task | "In the background, price every position in the Electrical category from history" | Read (the changes inside still need approval) |
Projects and project team
| BORO can | Example request | Type |
|---|---|---|
| List projects, open one, count projects by phase | "Which of our projects are in execution?" | Read |
| Create a project | "Create a project 'Residential building Lozenets' for client Alpha Invest in Sofia" | Approval |
| Edit a project's name, descriptions, location, client and start and end dates (only the company that created the project). Dates exist only through BORO. | "Set the project end date to 30.06.2027" | Approval |
| Archive or restore a project for your company | "Archive the project Office Plovdiv" | Approval |
| List every company on the project with its role. The project screens show only your own company's people. | "Which companies work on this project?" | Read |
| List the project team; add colleagues to one project or to several projects at once (each person gets the permissions of their role and one notification per project; if you may not add people to one of the projects, nothing is added); remove a member; change a member's project permissions | "Add Maria Petrova and Ivan Georgiev to this project", "Add Ivan Georgiev to all our active projects", "Give Ivan Edit on payment applications in this project" | Read; changes: approval |
| Share the project with an organization (client, designer, supervision, subcontractor, …): find a registered company, share with it, with one your company already works with, or with a new self-managed organization, or invite one by e-mail; choose its Organization roles, its people's permissions and how many of its people may join; change or remove a shared organization; resend or cancel an e-mail invitation; Add people of a self-managed organization by e-mail. Needs Projects at Edit in the project, Project sharing outside the organization at Edit in your company role, and a paid plan or an active trial. The organization is notified | "Share this project with Проект ООД as Designer, up to 3 people", "Which organizations is this project shared with?" | Read; changes: binding (the organization is notified) |
| On projects other companies shared with yours (Shared with us): list them; Add colleagues to one (each takes one of its places; the owner company is notified) or take one off; set a colleague's Permissions there within what the owner company allows; End participation. A colleague who works on the project can only take themselves off (Leave the project) | "Which projects are shared with us?", "Add Ivan and Maria to the Lozenets project of Строител АД" | Read; adding, removing and ending: binding (the owner company is notified); permissions: approval |
| Read the work calendar; set working weekdays; add or remove holidays | "Add the Bulgarian public holidays for 2027 to this project's work calendar" | Read; changes: approval |
Bill of quantities (BoQ)
| BORO can | Example request | Type |
|---|---|---|
| List the BoQs of a project and their documents; show the structure; search positions; get totals by category | "Show the categories of the budget BoQ with their totals", "Find all positions with 'hydro insulation'" | Read |
| Check a BoQ: missing or zero prices, odd quantities, duplicates; list positions where the same work is priced differently | "Check this BoQ for positions without a price and duplicated positions" | Read |
| Create an empty offer or budget BoQ | "Create a new offer BoQ 'Finishing works' in this project" | Approval |
| Create categories and positions (up to 100 positions in one action), edit, move, copy | "Add a category 'Roof' with these positions: …", "Move positions 3.4 to 3.9 into category 4" | Approval |
| Delete positions (up to 100 at once; recoverable from version history) or a whole category with everything in it | "Delete the empty category 'Other'" | Approval |
| Duplicate or rename a BoQ | "Duplicate this BoQ as 'Budget v3'" | Approval |
| Delete a whole BoQ with all versions | "Delete the draft offer 'Test'" | Binding: permanent, no trash |
| Create and assign labels (up to 500 positions at once) | "Label all electrical positions 'Phase 2'" | Approval |
| List versions and compare two versions | "What changed between version 2 and 3 of this BoQ?" | Read |
| Finish (lock) the current version | "Finish the current version of this offer" | Binding: the version is frozen |
| Accept a budget, fully or only some positions (the rest goes to a change-order draft) | "Accept this budget except the landscaping category" | Binding: the budget becomes the execution baseline |
| Import a BoQ from Excel: start an import draft from an attached file or a file manager file, fix the header and columns, fix single rows, then write it to the BoQ | "Import the attached КСС into this BoQ, without the summary sheet" | Approval (each step) |
| Import a BoQ with its resource analyses (preview what is reused and created in the library, then apply) | "Preview importing this file with analyses" | Preview: read; apply: approval |
| Import prices from a file into an existing BoQ (preview, then apply; can also remove positions missing from the file if you ask) | "Update the prices of this BoQ from the attached Excel" | Preview: read; apply: approval |
| Export a BoQ to Excel, in the BuildColab layout or back into the original imported workbook | "Export this BoQ to Excel", "Write the current prices into the original Excel" | Read (the file is also kept in the project's BoQ documents) |
OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.
Figure: Asking BORO about the BoQ on screen.
- The BoQ open on screen; with the eye button on, BORO knows which budget "this budget" means.
- Your question.
- The tool rows: BORO reads the budget structure and its positions (each row opens the details of the call).
- The answer as a table by category: here one position without a price.
GC markup (Надбавка)
BORO and connected AI tools work with the general contractor's markup. The markup is a term of a contract with the GC: the reads work wherever you can read the document; the changes work only where you are the client (the investor) on a GC contract draft or change order, and each waits for your approval. See Profit, additional costs and totals.
| BORO can | Example request | Type |
|---|---|---|
Read a document's GC markup: name, default %, the % on categories and positions, the amounts per %, total markup and total with markup; what the document is (contract draft, signed contract, change order, tender, offer, budget) and whether you may change it; on the budget, the markup contracted on its lines (get_boq_markup) | "What markup does the GC contract carry, and what is the total with markup?" | Read |
Read who changed which markup % and when (get_boq_markup_history) | "Who changed the markup of category 3 and when?" | Read |
Show a change order's effect on the markup: before / change / after per %, and the list of changes (get_boq_markup_diff) | "How does this change order change the markup?" | Read |
Suggest the markup scope: which positions are subcontracted (in scope) and which are own forces (get_boq_markup_scope_suggestions) | "Which positions should be out of the markup?" | Read |
Read a payment application's markup per %: this period, previously approved, to date, contracted, remaining, and whether the cap applies or was reached (get_payment_application_markup) | "How much markup does payment application 4 bill, and is it capped?" | Read |
| Also: contracts show the General contractor (with a management markup) switch and the contract's markup; a change order's delta says whether it changes the markup; the cost summary and cost structure carry the markup totals | "Is the contract with Строител ЕООД a general-contractor contract?" | Read |
Set or remove the markup of a GC contract draft or change order (name, default %) (set_boq_markup) | "Set a 5% markup 'Главно ръководство ГИ' on this contract draft" | Approval |
Set the % on categories, positions or every position with a label (0% = out of scope; on a change order optionally from a payment application number on), or clear the explicit % below a category (set_boq_markup_rates) | "Leave category 'Own forces' out of the markup", "From payment application 5 on, 7% on the facade" | Approval |
Copy the contract's markup into a change order that has none (copy_boq_markup_from_contract) | "Copy the contract's markup into this change order" | Approval |
| Create or update an offer request or a contract draft with the General contractor switch (a request carries no %; it is set on the contract draft), or contract a self-managed general contractor with its markup % | "Create a request to general contractors for these categories" | Approval |
Resource analysis, templates and the company library
| BORO can | Example request | Type |
|---|---|---|
| Read a position's resource analysis (materials, labor, machinery, services) | "Show the analysis of position 2.3" | Read |
| Add, change and remove resources in one analysis (up to 50 changes in one approval; for many analyses at once see Bulk changes in one step below). Materials, labor and machinery come from your company's own nomenclature only. | "Add 0.12 t of rebar B500 at 1,250 EUR/t to this analysis" | Approval |
| Correct the analysis of a line in an accepted budget or a signed contract: the unit price stays as agreed and the profit % is recalculated; BORO can first show the new cost and profit without saving. List the lines sold at a Loss | "We missed the scaffolding in position 4.2 of the contract — correct its analysis", "Which lines do we sell at a loss?" | Read; correction: approval |
| Set the completion status of analyses (up to 30 at once), additional costs, profit for one analysis or a whole BoQ, or a direct unit price | "Set 12% profit on this BoQ", "Set the unit price of 1.5 to 18.40" | Approval |
| Copy an analysis from one position to another | "Copy the analysis of 3.1 to 3.2 and 3.3" | Approval |
| Suggest, assign and unassign task templates; read a template's price history | "Which template fits position 4.2, and what did we price it at before?" | Read; assign: approval |
| Price from history: apply historical analyses to up to 15 positions in one approval (asks whether to use, merge or skip their notes) | "Price the Masonry category from our history" | Approval |
| Create, edit and delete templates; find duplicate templates and merge them | "Find duplicate templates for plastering and merge them" | Read; changes: approval |
| Search the library; create, edit and delete materials, labor and machines (up to 50 deletions at once); read a material's price history; find units | "Add the material 'Gypsum board 12.5 mm' in m2" | Read; changes: approval |
Bulk changes in one step
BORO and connected AI tools (Claude, ChatGPT and others over MCP) can change many items of a bill of quantities (BoQ) in a single action. In the BORO panel the whole batch shows one approval card; a connected AI tool with write access makes the whole batch in one call.
| Bulk change | Example request | Up to, per action |
|---|---|---|
| Add, change or remove resources in many resource analyses at once, for example every analysis of a category | "Add 2% waste to the concrete in every analysis of the Foundations category" | 300 analyses, 50 changes per analysis, 2,000 changes in all |
| Change one resource's rate across a whole BoQ or a set of analyses: set a new price, or change it by a percentage. A service line that holds a subcontractor's offered price is never changed this way; BORO reports it as skipped. | "Labour +100%", "Machines −10%", "This concrete at 210 EUR everywhere" | A whole BoQ, or the analyses you name |
| Set the Additional costs (Допълнителни разходи) percentages, for example Delivery and Storage Costs (Доставно Складови Разходи), or the Profit (Печалба) for many analyses, or for every analysis of a BoQ | "Set 8% delivery and storage costs and 10% profit on every analysis of this BoQ" | 1,000 analyses, or a whole BoQ |
| Edit the description, quantity, unit or note of many positions | "Change the unit of positions 3.1 to 3.40 to m2" | 200 positions |
| Set direct unit prices for many positions | "Set these unit prices: 1.1 to 18.40, 1.2 to 22.00, …" | 500 positions |
| Search your company's nomenclatures for many materials, labour types or machines at once | "Find all the materials of this analysis in our library" | 50 searches |
| Create many new materials, labour types or machines in the company library at once | "Add these 12 materials to our library" | 50 items |
After each change BORO reports the new prices straight away: each changed analysis' unit price, the totals of the affected positions and the new total of the BoQ. You do not need to ask it to check again.
Procurement: contracting schedule, offer requests and offers
| BORO can | Example request | Type |
|---|---|---|
| Contracting schedule: list and preview packages, show positions not yet in any package, calculate dates | "Which BoQ positions are not covered by a package?" | Read |
| Create, generate from a category, edit, link, unlink, archive and delete packages; place a package on the construction schedule | "Create a package for the Electrical category" | Approval |
| Change the contracting plan settings: plan-level lead times, the warning window (0–60 working days), the client deadline, the BoQ the plan uses. These have no field on screen. | "Set the client deadline of the contracting plan to 30 June", "Set the warning window to 15 working days" | Approval |
| Change the company's default lead times | "Set the default contracting lead time for Facade to 20 working days" | Approval |
| Export the contracting plan; start an offer request from a package | "Create an offer request from the Roofing package" | Export: read; request: approval |
| List, read and compare offer requests and offers; show the award grid | "Compare the offers for the electrical request in a table, with the best value" | Read |
| Create and edit an offer request, attach files, list partners who can receive it | "Prepare an offer request for the Waterproofing category with the drawings in folder 'Roof'" | Approval |
| Send an offer request to partners | "Send it to Hydro Ltd and Izolacii OOD" | Binding: each partner gets one e-mail, on the first send to it; cannot be unsent |
| Preview and send a revision; withdraw the request or one bidder; close the request | "Withdraw the request from Beta Build" | Binding: bidders are notified |
Award a request whole or by line items, change awards, take an award back. Replacing the award plan (award_offer_request, replace mode) and taking an award back (unaward_offer) notify the company that loses awarded lines. | "Award lines 1–12 to Alfa and the rest to Beta" | Binding: winners, and bidders that lose awarded lines, are notified |
| Transfer a bidder's prices into your BoQ, choosing which of the bidder's positions to use when several match one of yours. The screen cannot choose in that case. | "Use Alfa's prices in our budget; for 2.4 take their second line" | Approval |
| Cut the awarded lines of one offer into a separate offer, so a contract can cover only those lines. Needed for a contract for part of an offer. | "Prepare a partial offer for Alfa with only the lines they won" | Approval |
| Ask a bidder to revise its offer; on your side, start and submit a requested revision | "Ask Beta to revise their price for item 5" | Binding: e-mails the bidder |
| Incoming requests: list and read them and their files, accept or decline | "What offer requests did we receive this week?" | Read; accept/decline: approval (decline is final) |
| Price an offer and submit it | "Submit our offer for the 'Office Sofia' request" | Binding: locks the version and notifies the requester |
| Self-managed subcontractors: add one to a request, create an offer on its behalf, record its offer or that it declined, delete a draft offer | "Record the offer of Petrov Bros (self-managed) from the attached PDF" | Approval (nobody is e-mailed) |
Contracts and change orders
| BORO can | Example request | Type |
|---|---|---|
| List contracts, show one with its terms, show its history (the main contract, every change order and every proposal name both companies and the contract's total value at that point) | "What are the payment terms of the Alfa contract?", "What was the contract worth before the change order?" | Read |
Create a draft contract; fill or change its terms (only on contracts your company started). create_contract_draft on a partly awarded offer drafts the contract on a new partial offer holding only that offer's awarded lines | "Draft a contract with Alfa for their partial offer" | Approval |
| Send a contract proposal to another company; answer a proposal you received | "Send the contract proposal to Alfa with deadline 15 May" | Binding: notifies the other company |
| Sign a contract directly (a self-contract, or with a self-managed subcontractor) | "Sign the contract with Petrov Bros" | Binding: legally binding, cannot be undone |
| Prepare and create a subcontract from BoQ positions; link and unlink contract lines; list unlinked lines | "Which lines of this contract are not linked to our budget?" | Read; changes: approval |
| Create a change-order draft; show what changes | "Start a change order for the Alfa contract" | Approval |
| Finalize a change order (all or some lines) for a self-contract or a self-managed subcontractor | "Finalize the change order with only the added positions" | Binding: the change order becomes part of the signed contract |
| Create and list contract update requests | "Ask Alfa for a contract update for the extra works" | Binding: notifies the other company |
| Check whether a signed contract's BoQ has changed outside a change order since it was signed (such a change blocks merging a change order or a report with new positions) | "Has the Alfa contract's BoQ drifted from what was signed?" | Read |
In a subcontractor company, BORO can answer a contract proposal and open a change order on a signed contract. Both still need your approval in the chat, as in the app.
Payment applications
The pay-app tools treat another company's draft as not found. As the paying party, BORO sees a report only once the subcontractor has submitted it.
| BORO can | Example request | Type |
|---|---|---|
| List and open payment applications; show the reports summary, for both directions: the reports you bill your clients (Budget, with the split by resource type) and the reports your contractors bill you (Cost, certified value only); check a report against the contract | "Check this payment application: anything over 100% or unusual?" | Read |
| Create a draft; fill quantities and remarks; fill it from a document (a protocol, Excel, PDF or photo) | "Fill this draft from the attached measurement protocol" | Approval |
| Create a report for selected folders (when folders have a responsible, this needs Reports (full access); otherwise you get a report for your own folders), or a New report from progress reports (the quantities are the sum of the chosen accepted progress reports; BORO warns when one is already in an approved report) | "New report for March from the accepted progress reports" | Approval |
| Show and set the folder Responsible on your company's main BoQ: the signed contract you carry out as the contractor, or, as the investor, the investment budget (needs Reports (full access) to change; the person is e-mailed). Once a folder has a responsible, people without full access file reports and progress reports only for their own folders | "Make Maria responsible for the folder Rough works" | Read; changes: approval |
| Progress reports (internal to the contractor, no money): list and open them; create one, fill quantities and remarks, change its responsible; submit it; accept or return it with a reason (needs Reports (full access)); make a New draft of a returned one; delete a draft | "Create a progress report on the Alfa contract with 35 m3 of excavation", "Accept the submitted progress reports of this week" | Read; changes: approval; accepting is binding (final: the report can no longer be returned or edited, and its quantities count in the schedule and can be used for reports) |
| Add positions outside the contract; carry quantities up; attach and detach files; set the assignee | "Add an extra position 'Additional excavation' 35 m3" | Approval |
| Submit, counter, reject or withdraw a report; revise one | "Submit the draft for March" | Binding: the other company is notified |
| Approve a report | "Approve payment application No. 4 of Alfa" | Binding: locks the figures and e-mails the other company |
| Delete a draft report | "Delete my empty draft" | Binding: permanent |
| Record, finalize or void a report for a self-managed subcontractor | "Record the April report of Petrov Bros from the attached Excel" | Approval; finalize is binding |
| Export a report or the reports summary to Excel | "Export the summary of all reports in 2026 by contract" | Read (download link) |
Budget and finance
| BORO can | Example request | Type |
|---|---|---|
| Show the cost structure of a project and the payment applications behind its costs (needs Financial dashboard, Execution, Budget preparation and Reports at View in the project) | "Summarize costs by discipline", "How much have we certified against the budget?" | Read |
Contract finance
BORO works your company's Contract finance (Финанси по договори) register with your permissions: Contract finance to read and work in it, Confirm certificates (contract finance) for the steps marked below. It never sees the other party's register. See Contract finance: certificates, invoices and payments.
| BORO can | Example request | Type |
|---|---|---|
Show a contract's finance card (upcoming, due, overdue, the advance — also for the main contract and each change order —, warranty deductions; after an inclusion with history, certified and paid before the inclusion include the history), the contracts with their finance status, the contract ledger (with step 0 of the payment path, the advance: unpaid, awaiting invoice, partly paid or paid; and with the advance of the main contract and each change order's own advance, when a change order signed with terms of its own has one), a contract's financial terms (also the terms in force for the main contract and each signed change order: a change order keeps its own advance, warranty deductions and payment days for what it adds to the contract; a change order without its own terms uses the main contract's), the finance settings and the per-contract figures of a project. The finance card, the contracts list and the overview return the figures for the main contract and each change order signed with its own terms, and can be limited to the main contract or one change order (in the tool, contractVersionNumber: 'main' or the number the contract gave that change order when it was signed) | "What is overdue on the Alfa subcontract?", "Which contracts are not included in finance yet?" | Read |
BORO reports a draft contract's expected advance and says whether it is final (get_contract_financial_terms): on a main-contract draft it is the amount signing would fix now; a change order's advance is known only once it is signed. | "What advance will the contract with Alfa have?" | Read |
List and open certificates of acceptance and payment, invoices, payments, warranty deductions, submitted invoices and the certificates provided to you; the four reports (invoice aging, confirmed not invoiced, advances, warranty deductions), each with the figures for the main contract and each change order and a filter for the main contract or one change order (contractVersionNumber, as above); export a certificate or a report as PDF or xlsx. BORO describes a credit note that corrects an invoice as "corrects invoice …", never as unallocated, and gives certificate line units in your language | "Which certificates are waiting for confirmation?", "Export the invoice aging as Excel" | Read (download link) |
Show a contract's warranty deductions per release stage, for the main contract and each change order with terms of its own (get_retention_stages); list the warranty deductions of the main contract or one change order (list_retention_parts with contractVersionNumber); propose releasing one stage of the main contract or of one change order at once (release_retention_stage, after your approval; needs Confirm certificates (contract finance)) | "What is held on change order No. 2?", "Release stage 1 of change order No. 2: the handover was on 3 November" | Read; release after your approval |
| Register an invoice from a PDF: send BORO the invoice PDF in the chat (or point it at a file on the payment application or in the File Manager); BORO reads the number, dates, issuer and amounts, finds the contract and the certificate and proposes the registration with every figure on the card. It never registers from a PDF on its own | "Register the attached invoice against the March certificate" | Approval: check every figure against the PDF |
Edit, allocate and cancel invoices; reverse an allocation; apply unapplied credit; register, edit, allocate and cancel payments with the suggested allocation; reverse a payment allocation; confirm an advance payment; register an advance received or paid, with or without its advance invoice, or add the invoice to an advance payment registered without one (register_advance_payment) | "Register the payment of 48 000 € from today and allocate it to invoice 1045", "Register the advance received on the Alfa contract, paid today" | Approval; cancelling an invoice or a payment is final. Cancelling a contract-finance invoice registered from a subcontractor's submission notifies that subcontractor. |
Import a bank statement CSV from the File Manager: preview the proposed payments and allocations, the rows to review and the rows already imported (preview_bank_statement_allocations), list earlier imports (list_bank_statement_imports), and apply the proposal with the rows you chose (apply_bank_statement_allocations). Importing the same statement again creates nothing | "Import the October bank statement from the Finance folder" | Preview and list: read; import: approval |
| Prepare the inclusion of a contract (date of inclusion, opening balances or, with history, the pay applications certified before it, the past invoices with their payments, the advances paid without an invoice and the explanation of a reconciliation difference, covered payment applications, and for each change order signed without financial terms its own terms from the signed change order or the main contract's); set the financial terms of a draft contract or of a change-order draft | "Prepare the inclusion of the Beta contract from 1 November" | Approval |
| Give you the activation history template, read a past payment application, invoice list or statement (PDF, Word or Excel; not a scanned PDF) and propose the activation history from it — or, once the contract is active in finance, a history amendment ("complete the history"; a new one needs its reason). You approve the proposal on an approval card; it fills only the draft, notifies nobody and spends no credits | "Read the attached statement and fill the history of the Beta contract's inclusion" | Approval |
| Read a contract's history amendments and propose preparing, approving or discarding one (complete an active register's history with what the inclusion missed). Approving an amendment is binding and cannot be undone | "Add payment application 3, certified before the inclusion, to the Beta contract's history" | Approval |
| Mark a difference on a certificate, hand it over to accounting, provide it to the subcontractor (the subcontractor is notified). Provide payment certificate attaches the PDF to every payment application the certificate covers | "Provide the March certificate to Volt Electrical" | Approval; providing notifies the subcontractor |
| Void a self-managed subcontractor's report whose certificate also covers other reports: void external payment application replaces that certificate with a new version without the voided report (a certificate of the voided report alone is cancelled). The certificate must not be invoiced yet | "Void report No. 4 of Petrov Bros" | Approval; a handed-over or provided certificate also needs the confirmation that no invoice was issued and a reason |
| Submit your invoice against a certificate a payer provided, or one invoice against several certificates of one contract (BORO lists the certificates and asks for your approval; the paying company is notified), resubmit or withdraw it; accept or return an invoice a subcontractor submitted, and explain why an acceptance is refused (a certificate invoiced with a separate invoice for the main contract and each change order, or an invoice too small for all its certificates). For a certificate invoiced with a separate invoice for the main contract and each change order, BORO submits the invoice for the one you name; accepting, returning, withdrawing and resubmitting can name it too, as a check | "Submit invoice 2026-118 against the certificate on report No. 5", "Submit invoice 2026-120 against BC-1 and BC-3" | Binding: the other company is notified; accepting registers the invoice |
Say where a payment application stands in your company's finance register: not in finance, covered by the opening balances, certificate pending or created, finance paused, or certificate creation failed with the reason (get_payment_application_finance_status); and, for an invoice you submitted, whether the payer has paid it (unpaid, partly paid or paid, with the date of the latest payment, never the amounts) | "Why is there no certificate for report No. 7?", "Has GC Ltd paid invoice 2026-118?" | Read |
| Confirm certificates, one or several at once (BORO shows every certificate's amounts first); replace a certificate (BORO recomputes every section — the main contract and each change order — for all the payment applications the certificate covers; a hand-set advance or warranty deduction is possible only on a certificate with one section); approve an inclusion; pause or resume finance; accept an invoice difference; release a warranty deduction; record a correction, a contract-ledger adjustment or an advance settlement certificate (on the main contract's advance or a change order's own); change the finance settings. Needs Confirm certificates (contract finance) | "Confirm all certificates of project Mladost that are waiting" | Binding: confirmed figures are the basis for the invoice; a release is final |
| Preview the certificate a report would produce and, when it goes into a draft, which draft it joins and the certificate that draft would make; approve a report and confirm (and provide) its certificate in one step, or approve it and say which certificate it goes into (a new one, an open draft, or later); confirm (and provide) the certificate of an approved report | "What certificate will report No. 7 produce?", "Approve report No. 7 and confirm its certificate", "Approve report No. 8 and add it to the open draft" | Approval; binding: providing notifies the subcontractor. Needs Confirm certificates (contract finance) |
List the approved reports without a certificate (Approved, without a certificate), the draft certificates across all contracts, of one project or of one contract, with where each one stands (Draft → For reconciliation), and one draft; preview a certificate grouped from several reports, or a merge of certificates or drafts (which certificate keeps its number, which are cancelled, and the merged figures), before it is made (list_payment_applications_awaiting_certificate, list_payment_certificate_drafts, get_payment_certificate_draft, preview_grouped_payment_certificate, preview_payment_certificate_merge) | "Which approved reports have no certificate yet?", "Which draft certificates are open on the Alfa project?", "What would one certificate for reports No. 3 and 4 look like?" | Read |
Include a report in a certificate (new, an open draft, or later); create one certificate or a Draft from several reports of one contract; add a report to a draft or remove it; submit or discard a draft; merge certificates still For reconciliation into one (include_payment_application_in_certificate, create_grouped_payment_certificate, add_to_payment_certificate_draft, remove_from_payment_certificate_draft, submit_payment_certificate_draft, discard_payment_certificate_draft, merge_payment_certificates) | "Make one certificate from reports No. 3 and 4", "Merge BC-2026-000123 and BC-2026-000124" | Approval; binding. Needs Confirm certificates (contract finance) |
Show a certificate's due dates for the main contract and each change order for given invoice dates (get_payment_certificate_due_dates); propose setting Due dates with change orders on a certificate For reconciliation or on a draft (set_payment_certificate_due_date_mode); propose changing one invoice part's due date with a reason (set_invoice_part_due_date). Invoice allocations can name the part of the certificate they invoice: the main contract or a change order | "Make BC-2026-000123 due on the earliest date", "Move the due date of invoice 1045 to 30 November — agreed with the subcontractor" | Approval; notifies nobody. Setting the mode needs Confirm certificates (contract finance) |
finalize_change_order, create_contract_proposal and respond_to_contract_proposal refuse a change order that lowers a position below the quantity already reported and paid. BORO tells you which positions are affected, the lowest allowed quantity and the payment applications concerned, and nothing is changed. Lowering below a reported but unpaid quantity is allowed: the next payment application then carries a negative line (a contract correction). | "Finalize the change order that lowers the concrete to 50 m³" | Binding: finalizing or accepting a change order signs it into the contract |
| Tell you separately when a payment in a history amendment would need a held warranty deduction: it settles the invoice's current part only, and the held deduction is released and paid in the register. A historical invoice is reported as historical, not as unallocated | "Add the March payment to invoice 0042 in the history" | Read |
Construction schedule
BORO's schedule and working-calendar tools follow the per-project Schedule permission: on a project where your Schedule is No access (or View, for changes), BORO tells you it lacks the project permission.
| BORO can | Example request | Type |
|---|---|---|
| Read the schedule, its structure, tasks, dependencies and BoQ coverage; analyze delays and the critical path | "Are we behind schedule?", "Analyze the critical path" | Read |
| Create a schedule for a BoQ (empty, as a copy of the BoQ structure, or carried over); add categories (up to 100), groups (up to 30), milestones (up to 50) and dependencies (up to 50) in one action | "Create a schedule for the budget with phases Rough works, Finishes, Handover" | Approval |
| Change task dates, categories, groups and dependencies; reorder; change how a position is distributed; delete items | "Move the facade tasks two weeks later" | Approval |
| Match an imported MS Project schedule to the BoQ: run the matching in the background, show the proposals by confidence, apply the sure ones or chosen pairs, export a match report, link or unlink single positions. There is no matching screen. | "Match the budget BoQ to the imported schedule", "Apply all high-confidence matches" | Run and draft: read; apply: approval |
| Read task progress from a chosen Progress source: Schedule progress, Approved pay apps, Progress reports or Latest pay app + progress reports. The last three work only for a schedule on your company's main BoQ with a signed contract, and the two with progress reports only for the contractor | "How far is the facade according to the approved pay apps?" | Read |
| Report progress (a percentage with an optional note; adds an entry, never overwrites) | "Report 60% on the slab formwork with note 'axis A–C done'" | Approval |
| Show the progress history of a task: every entry with date, who reported it and the note. Only through BORO. | "When did the slab formwork reach 50% and who reported it?" | Read |
| List versions with author, date and BoQ version; compare two versions (added and removed tasks, changed dates, changed dependencies), also for a subcontractor's slice. Only through BORO. | "What slipped since the last locked version?" | Read |
| Delete rows from the structure (categories, group tasks, BoQ links, milestones, each with what is inside it), or the whole structure at once, all or nothing | "Delete the whole schedule structure, I want to start over" | Approval; cannot be undone in the draft |
| Give a schedule copied from the BoQ its own structure, so its categories and group tasks can be changed (its categories then stop following the BoQ) | "I want to regroup the copied schedule by building" | Approval; cannot be undone |
| Lock the current version (on a master schedule this also publishes a copy to subcontractors); reopen as a new draft | "Lock the schedule" | Binding: the version is frozen |
| Bring back an older schedule into the current BoQ version (replaces the current schedule) | "I started an empty schedule by mistake; bring back the one from BoQ version 2" | Binding: replaces the current content |
| Read the time-phased report (cash flow, resources) and the pricing report for any period | "How much work is planned for March?", "Which materials do we need next month?" | Read |
| Export the schedule as an MS Project file or an Excel table (download link) | "Export the schedule for MS Project" | Read |
OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.
Figure: Comparing two schedule versions through BORO.
- Your question.
- BORO uses the built-in skill for the construction schedule and loads the schedule tools; the rows show the calls it made.
- The tasks whose dates moved, with the old and new start and end (version 1 → version 2).
File manager
| BORO can | Example request | Type |
|---|---|---|
| Search files by name, description or content; list folders; show file details, versions and a link | "Find the latest fire safety report in the project files" | Read |
| Read files: PDF, Word, Excel, PowerPoint, text, images, drawings; quantities and a preview from processed 3D/CAD models | "Summarize the attached contract and list the penalties", "How many doors are in the Revit model?" | Read |
| Create files: Word, Excel, Markdown (with diagrams), text, CSV, and interactive pages (artifacts); edit a file as a new version; restore an older version | "Create an artifact with a chart of the monthly payment applications", "Write the meeting minutes as a Word file in folder 'Minutes'" | Approval |
| Upload files (also from a link, also large files in parts); create folders; copy, move, rename; add descriptions | "Copy the folder 'Drawings' into the Hotel Varna project" | Approval |
| Delete to the trash; list the trash; restore | "Restore the file I deleted yesterday" | Approval |
| Share and unshare files and folders with people, partner companies and roles of your company — a role reaches everyone who holds it, now and later (the owner, an editor or the company owner); comment, reply, edit, resolve and delete comments | "Share the folder 'Offers' with Ivan for comments", "Share the folder 'Drawings' with all site managers" | Approval |
| Quote and start 3D/CAD processing (shows credits and time first) | "How much would it cost to process all IFC files in 'Models'?" | Quote: read; processing: approval and credits |
BORO's create folder and rename follow the same folder-name rules as the File Manager: 2–50 characters; letters, digits, spaces and _ - . · ( ) ,; no leading or trailing dot or space, no "..", no / or \. A file name BORO renames cannot contain / \ < > : " | ? *. When a name breaks a rule, BORO creates or renames nothing and tells you why.
Task boards
| BORO can | Example request | Type |
|---|---|---|
| List boards, open one, search tasks, open a task | "Which of my tasks are overdue?" | Read |
| Create and edit boards, labels and board members | "Create a board 'Site Lozenets' and share it with the site team" | Approval |
| Create tasks; change status, assignee, due date, priority; complete; comment; manage subtasks; move to another board | "Create a task for Ivan: order the scaffolding by Friday" | Approval |
| Archive and restore tasks (up to 25 at once). Tasks are never deleted; archiving is how a task is removed. | "Remove the duplicated task 'Order tiles'" | Approval |
Meetings
| BORO can | Example request | Type |
|---|---|---|
| List meetings and recurring meetings; read the transcript, meeting report, decisions and suggested task changes | "What did we decide at the last coordination meeting?" | Read |
List who can attend a meeting: for a company meeting the company's employees, for a project meeting (get_meeting_attendee_candidates with a project) everyone who can attend a project meeting, from every participating company, with their company | "Who from the subcontractors can I invite to the site meeting?" | Read |
| Create, edit and delete meetings and recurring meetings; manage attendees; match speakers. Changing a meeting or a recurring meeting (details, attendees, speakers, suggestions, commit, archiving) works only for the company that created it. An attendee from another company can re-run the analysis (billed to their own company) and remove themselves from the attendees. Deleting a meeting works only for its organizer, and deleting a recurring meeting only for its creator. Attendees with an account must be on the project for a project meeting (anyone else is added by name). | "Create a weekly site meeting every Tuesday at 9:00 for this project" | Approval |
| Edit suggested task changes and create the accepted ones as tasks on a board (new assignees are e-mailed) | "Create the accepted tasks from today's meeting" | Approval |
| Run the AI analysis of a meeting again | "Extract the tasks again after I fixed the speakers" | Approval; uses credits |
Company administration, partners and billing
| BORO can | Example request | Type |
|---|---|---|
| Show the company summary, members, roles and the license summary | "How many free seats do we have?" | Read |
| Create a role; change a role's permissions (by default the changed permissions are also applied on the projects of everyone who holds the role, keeping their other per-project adjustments); change a member's role (by default their permissions on all their projects are also reset to the new role; not your own role, not the owner's, and never making someone owner). Say so if the projects should stay as they are. | "Create a role 'Site engineer' with View on everything and Edit on the schedule" | Approval |
| List partners; add a partner; edit a partner; create a self-managed (external) subcontractor | "Add Hydro Ltd as a partner" | Read; changes: approval |
| Show the plan, invoices and the credit balance (plan and invoices need Members at View). The billing overview names the plan, what it includes (seats, credits, storage) and the start and end of the current period. | "How many credits do we have left?", "Show our last invoices", "Which plan are we on and when does it end?" | Read |
| Create a skill from work you repeat (created switched off for review) | "Save this pricing procedure as a skill" | Approval; needs BORO Skills (author) |
| Edit one of your company's skills (its name, description, instructions or other settings), switch it on or off, or delete it (deleting cannot be undone) | "Switch on the skill Pricing check", "Delete the skill Old offer checks" | Approval; needs BORO Skills (author) |
BORO, and AI tools connected through MCP when your company has MCP write access, can edit, switch on or off, and delete your company's own skills. In BORO each change first shows an approval card; deleting a skill is permanent. Built-in skills cannot be changed. Like creating a skill, this needs the company permission BORO Skills (author) (BORO умения (автор)) at Edit, the same as on BORO Settings → Skills (Умения). Members without it still see every skill, and BORO still uses the switched-on skills for them, but they cannot change any. See Skills.
Property sales
BORO has a tool for every action a company user can take in the Property sales (Продажби на имоти) module, from the first inquiry to the signed deal and the buyers' payments. It works only on projects where BuildColab has activated the module, with your own company permissions: Property sales, Property sales: management (Продажби на имоти: управление), Property sales: setup (Продажби на имоти: настройка), Property sales: legal (Продажби на имоти: правни), Payments register (Регистър на плащанията), Construction events (Строителни събития) and Property sales: export (Продажби на имоти: експорт), with your discount limit and your approval authorities. BORO sees the same clients, deals and figures you see on screen, and no more. See Property sales and Permission reference.
- Every change waits for your approval. Each Property sales change shows the card Requires approval (Изисква одобрение) and happens only when you click Approve (Одобри). Your company cannot switch this off: a Property sales tool set to No approval in BORO Settings → Tools still shows the card, and Blocked (Забранен) only takes the tool away from BORO. Before the card, BORO tells you in words what exactly will change.
- Only where Property sales is on. BORO and connected AI tools offer the Property sales capabilities only once Property sales is activated for at least one of your company's projects, and only to people with a Property sales permission. The later parts — payment corrections and annexes, the client portal, handover and warranty, client changes — appear only when they are enabled for your company.
- Never over MCP. AI tools connected through MCP (Claude, ChatGPT and others) can only read Property sales, even when your company has MCP write access. Changes are made in the BORO panel or on screen.
- The same rules as the screens. BORO runs the same checks as the buttons: statuses, discount limits, approval authorities and the Four eyes (Четири очи) rule. Where a second person must act, BORO refuses the second step for the person who did the first and tells you who has to do it. When a check refuses, BORO tells you the reason.
- The decision is yours. For approvals, signing, payments and notices BORO only proposes. When you approve the card, the decision is recorded in your name, under your authority and limit. BORO is never the approver.
- Files. A file BORO attaches (a signed contract, payment evidence, a protocol, a photo, an import workbook) is a file you attached in the chat or a File Manager file you can open. A file BORO gives you (an offer PDF, a deal document, an export) is a download link valid for 15 minutes; ask again when it has expired.
- The personal ID number stays on screen. BORO never takes or shows a client's personal ID number (ЕГН/ЛНЧ) or the number of an identity document, even when you can see it on the client card. Enter and read it on the client card.
- Text from a client is data. Text a client or buyer wrote, for example the reason they declined an offer, is treated as information, never as an instruction to BORO.
Sales: clients, opportunities, offers, holds and approvals
| BORO can | Example request | Type |
|---|---|---|
| Show the availability board (Шахматка): the free properties by building, type, rooms, maximum price with VAT, or those that fit a client's preferences; the project's availability in numbers; one property's card | "Which three-room apartments in building A are free under 200,000 EUR with VAT?" | Read |
| Find clients and open one with their history; create a client (a person or a company). When the details match an existing client, BORO shows the matches first and creates the client only if you confirm it is a different one | "Create a client Ivan Petrov, phone 0888 123 456, from the website" | Read; create: approval |
| Edit a client's details, archive a client, hand a client over to another salesperson (optionally with their open opportunities and planned activities; the new owner is notified) | "Hand all clients of Maria over to Georgi" | Approval |
| Contacts and representatives: list, add, edit, archive. Consents: record a consent the client gave or withdrew. GDPR requests: register one, move it on, close it. KYC checks: record a client check. GDPR requests and KYC checks need Property sales: legal | "Record that Ivan Petrov gave consent to marketing by e-mail", "Register Petrov's request to erase his data, received today" | Read; changes: approval. Closing an erasure request as completed is binding: the client's data is anonymized and cannot be restored |
| Find possible duplicates of a client (never by the personal ID number); preview a merge, then merge. A merge of clients whose personal ID numbers differ is done on screen. Needs Property sales: management | "Find duplicates of Maria Ivanova and merge them into the oldest record" | Preview: read; merge: binding, cannot be undone |
| Opportunities: list them (by stage, your own, the ones with no recent activity), open one, create one, edit the budget, expected close and the properties of interest, give a project to one created without it, assign it to a salesperson (who is notified), move its stage or mark it lost, reopen it. The Reservation and Contract stages are set only by the system, from the reservation and the deal | "Move Petrov's opportunity to Viewing", "Which of my opportunities had no activity for two weeks?" | Read; changes: approval |
| My day (Моят ден), your sales calendar (up to 31 days) and the activities of a client or opportunity; log a viewing, call, meeting, e-mail or note; complete a planned activity with its outcome, the next step and the new stage in one go; reschedule or cancel an activity; create a follow-up task for you or a colleague; delete a note you wrote (permanently) | "What do I have today?", "The viewing with Petrov went well: plan a call for Friday and move the opportunity to Negotiation" | Read; changes: approval |
| Offers: list and open them, read one version with its lines and discounts, get the PDF of a sent version; create a draft offer priced from the published price list (the mandatory parking space or storage of a property is added); start a new version; edit the draft (properties, discounts, payment terms, validity); submit a discount above your limit for approval; send the offer by e-mail or mark it handed over in person; send the e-mail again; record the client's answer (accepted or declined) or withdraw the offer | "Make Petrov an offer for A-12 with its parking space and a 3% discount", "Send the offer to his e-mail" | Read; drafts: approval; sending: binding (the version is frozen and the client is e-mailed); the client's answer: final for that version |
| Holds and reservations: list and open them; place a temporary hold (the request must include every mandatory linked property); ask to extend a hold; release a hold (your own at once, someone else's as an approval request); create a paid reservation from a hold, directly or from an accepted offer; record the reservation document; activate the reservation once the deposit payment is confirmed (and the document and KYC check are in place when the policy asks for them); decide an expired reservation (extend, go to a deal or release) | "Hold A-12 and P-05 for Petrov until Friday", "Reserve the properties of Petrov's accepted offer with a 5,000 EUR deposit" | Approval; releasing an active reservation or an expired one is final and needs a sales manager with the authority who is not its owner |
| Approvals (Одобрения): list the requests you made and those you may decide, open one; ask for an approval (early release of a hold, blocking or unblocking a property, an exception such as a deal without a reservation; the approvers are notified); withdraw your own request; decide a request you may decide. BORO proposes the decision and you make it, under your own authority and limit; a request you made yourself is refused. The requester is notified | "What approvals are waiting for me?", "Approve the 4% discount on Petrov's offer" | Read; asking: approval; deciding: binding (the discount, extension, block or contract approval takes effect at once) |
Deals and contracts
| BORO can | Example request | Type |
|---|---|---|
| List and open deals with their next step; list the deals without a lawyer and take one as its lawyer (Property sales: legal); create a draft deal from an active reservation (or, with an approved exception, without one); edit a draft, its parties and its team; submit it for contract approval (the approvers are notified; the KYC policy may require completed checks first); cancel a draft deal (its properties stay with the reservation); mark a signed deal completed | "Create the deal from Petrov's reservation with Alfa Residence as the seller", "Send deal 2026-014 for contract approval" | Read; changes: approval; cancelling and completing: final |
| Contracts: show a deal's contracts and the Terms register (Регистър на условията); register a contract document or a new version of an unsigned one; write terms into the register and verify it (the checks run against the prices and the payment plan). Needs Property sales: legal and the lawyer's place on the deal team | "Add the payment terms of the preliminary contract to the terms register and verify it" | Read; changes: approval |
| Sign: register the signed copy of a contract with its signing date, from a file you attached or a File Manager file. A signed preliminary contract or notarial deed makes the deal active, turns the reservation into the deal's claim on the properties and starts the installments due on signing | "Register the attached signed preliminary contract, signed on 3 November" | Binding: cannot be undone; afterwards the contract changes only by an annex |
| Deal documents: attach and detach them, get a download link; show the KYC status of the deal's parties (statuses only); record the transfer of ownership (preparing, or transferred with the signed notarial deed) | "Attach the power of attorney from the chat to deal 2026-014" | Read; changes: approval; a transfer never goes back |
Payment plans, due dates and construction events
| BORO can | Example request | Type |
|---|---|---|
| Read a deal's payment plan and the installments across deals (due this week, overdue, your own deals); create or replace the draft plan; activate it. Needs Property sales: legal or Payments register | "Which installments are overdue in Vitosha Residence?", "Make a plan for deal 2026-014: 10% on signing, 40% on Act form 14, 50% on the use permit" | Read; draft: approval; activating: binding (the installments get their due dates; overdue ones carry the contract penalty) |
| Set the due date of an installment (a date the contract does not allow, for example an earlier one, only with a reason); postpone an installment or mark it disputed (directly with the authority, otherwise as an approval request) | "Set the due date of installment 2 of deal 2026-014 to 15 December" | Binding: from the next day the installment is overdue and the penalty accrues |
| Credit the reservation deposit to the deal's installments, once per deal (Payments register) | "Credit Petrov's reservation to the first installment" | Approval |
| Construction events (for example Act form 14 (Акт обр. 14), Protocol form 16 or the use permit): list and open them, get a link to their document; register one as a draft, attach its scanned document, submit it (the confirmers are notified); confirm or reject it; correct a confirmed one (a new draft); revoke one. Show which installments an event started and decide each (set its due date or dismiss it). Needs Construction events; deciding the effect on installments needs Payments register, Property sales: legal or Property sales: management | "Register Act form 14 for building A from the attached scan", "Which installments did the use permit start?" | Read; changes: approval; confirming, revoking and setting due dates are binding. Four eyes: with the rule on (the default), the person who submitted an event cannot confirm it |
Buyer payments, legal entities and bank accounts
| BORO can | Example request | Type |
|---|---|---|
| Show the payments register, one payment, the receivables and overdue amounts, the reports (expected inflows, overdue, sales by salesperson, prices) and the reconciliation; get a link to a payment's evidence | "How much do our buyers owe us, and what is overdue?" | Read |
| Record a received payment (it stays unconfirmed; a possible duplicate is shown first); correct an unconfirmed payment; attach its evidence from the chat or the File Manager. Needs Payments register at Edit | "Record 20,000 EUR received today from Ivan Petrov on the escrow account, with the attached statement" | Approval |
| Confirm a payment: the money is really on the account. Needs the Payment confirmation (Потвърждаване на плащане) authority. With the Four eyes rule on (the default), the person who recorded the payment can never confirm it: another person does, on screen or through their own BORO | "Confirm the payments Maria recorded yesterday" | Binding |
| Allocate a confirmed payment to installments or a reservation (BORO first lists what it can pay); reverse one allocation; reverse an unconfirmed payment recorded by mistake | "Allocate Petrov's payment to installments 1 and 2" | Approval; a reversal is final |
| Record a refund from a confirmed payment: it becomes an unconfirmed outgoing payment that a second person executes by confirming it. BuildColab sends nothing to the bank | "Refund 2,000 EUR of Petrov's deposit to his IBAN" | Approval |
| Legal entities and bank accounts: show them; create, edit and archive them; make one the default (Default legal entity / Юридическо лице по подразбиране, or the default account of a currency). Needs Payments register at Edit | "Add the escrow account BG… at UniCredit to Alfa Residence" | Read; changes: approval |
Properties, price lists, imports, settings and exports
| BORO can | Example request | Type |
|---|---|---|
| Buildings, entrances and floors: show them, add, edit, archive an empty one. Properties: add one, edit its data, record a new area version and make it current (live deals and sent offers with it get an "area changed" review item; prices are not recalculated), set its mandatory or optional parking space and storage, attach and detach documents, set its technical readiness; block or unblock it (directly with the authority, otherwise ask for it as an approval request). Needs Property sales: setup (blocking: Property sales: management) | "Add apartment A-15 on floor 4 of building A, 78.4 m2", "Link parking space P-07 to A-15 as mandatory" | Read; changes: approval |
| Merge 2–20 properties of a building into one, or split one into 2–20. Refused while a property has a hold, reservation, deal or block | "Merge A-21 and A-22 into A-21/22" | Binding: cannot be undone |
| Price lists: show them; create a draft, edit it, set property prices; change many prices at once (BORO first shows each price before and after, then applies exactly that); submit the list for publishing; withdraw a draft or submitted list (final). Publishing needs a second person: another person with Property sales: management and the authority approves it | "Raise the prices of building B by 3% in the draft price list" | Preview: read; changes: approval |
| Imports: give the empty template and explain its columns; upload a filled workbook (inventory, or a migration of sales made before BuildColab, which also needs Payments register); list rows and errors, correct rows, validate; add documents to a migration; commit the batch (a migration needs your confirmation that the historical payments were really received); show the reconciliation and its Excel file and sign it off; cancel a batch. Personal ID number columns cannot be changed through BORO | "Import the attached inventory workbook into Vitosha Residence and show me the errors" | Read; changes: approval; committing and signing off are final |
| Settings: show them; change the general settings (holds, numbering, four eyes, PDF texts), the discount limits per role, the approval authorities, the working calendar of a year, a sales policy (a new version is active at once) and the logo on the sales PDFs (BORO can render a sample PDF first). Turning a four-eyes rule off needs a reason. Changes apply to the whole company at once | "Raise the discount limit of sales agents to 3%", "Add 24 December as a holiday in the 2027 sales calendar" | Read; changes: approval |
| Export a report as Excel or PDF; request the Full export (Пълен експорт) and give its link when it is ready; show the history of changes ("who changed what"). Every export is recorded in the history. The clients export and the full export contain the clients' personal data. Needs Property sales: export (the full export also Property sales: management) | "Export the receivables of Vitosha Residence as Excel", "Who changed the price of A-12 last week?" | Export: read (link valid for 15 minutes); full export request: approval |
Property sales: annexes, terminations, notices and payment corrections
BORO also works the later stages of a signed deal and the corrections of the payments register, with the same approval card and the same four-eyes rules. See Annexes, unit swaps and termination.
| BORO can | Example request | Type |
|---|---|---|
| Annexes: list a deal's annexes and terminations; prepare an annex (properties added, given up or repriced, with the new draft payment plan; the approvers are notified); register the signed copy of an approved annex; cancel an unsigned annex. Needs Property sales: legal | "Prepare an annex to deal 2026-014 that swaps A-12 for A-14" | Approval; signing an annex is binding: the properties, prices and plan change and the money already paid moves to the new plan |
| Terminations: request one (what the seller keeps and what is refunded; the approvers are notified); settle it once the refund is paid; authorize the release of the properties; cancel it; open or close a dispute on a deal | "Request the termination of deal 2026-009; we keep the 5,000 EUR deposit" | Approval; the release is binding and needs a sales manager with the authority who did not request the termination |
| Due dates by the contract: show what the due-date engine would set for each installment and why, then apply it; show the informative penalty on an overdue installment | "Calculate the due dates of deal 2026-014 by the contract" | Preview: read; applying: binding (overdue the next day, with the penalty) |
| Payment notices: list them, draft one for an installment, send it, record its delivery proof (for example the return receipt), cancel a draft or failed one, get the PDF of a sent one. Needs Payments register | "Send Petrov a notice for installment 3 by registered mail" | Sending: binding, a legal act toward the buyer that cannot be cancelled; it can start the installment's due date |
| Payment corrections and refunds: a confirmed payment changes only through a correction (reverse the payment, reverse or re-point an allocation, refund, amend the payer details). BORO requests it, a second person decides it (never the requester), then it is applied; or it is cancelled. Refunds and the reservation credit also go through a correction | "Request a correction: move 3,000 EUR of Petrov's payment from installment 2 to 3" | Request: approval; deciding and applying: binding |
| Review a payment from a third party (never the person who recorded it); show possible duplicate payments; enter and list the bank statement balances used by the reconciliation | "Approve the payment from Petrov's wife for his deal", "Enter the October closing balance of the escrow account" | Read; changes: approval; the review is binding |
Property sales: the buyer portal (staff side)
BORO does the staff's work on the buyer portal. Many of these actions e-mail the buyers; BORO says so before it proposes them. See The buyer portal.
| BORO can | Example request | Type |
|---|---|---|
| Show and change the portal settings: the support e-mail and phone the buyers see and the payment-reminder days of the company; per project, the portal on or off and whether buyers are invited automatically when their contract is signed | "Turn the buyer portal on for Vitosha Residence" | Read; changes: approval |
| Access: show who has access to a deal and who can get it; give access (the person is e-mailed an invitation); change rights or suspend; revoke access (final; the person is e-mailed); approve a grant waiting for review; send the invitation again; Invite all (Покани всички) after a preview of the list (each buyer is e-mailed); unlock a locked account; sign a buyer out on every device | "Give Petrov and his wife access to the portal for deal 2026-014" | Read; changes: approval; e-mails go to the buyers |
| Publish a deal document (contract, notarial deed, annex, handover protocol) to the portal (everyone with access is e-mailed); list what is published; unpublish one item, or everything of the project at once | "Publish the signed preliminary contract to Petrov's portal" | Approval |
| Construction-progress posts: draft, edit, add or remove photos, delete a draft, publish to the whole project or one building (each buyer is e-mailed), unpublish | "Draft a progress post about the roof of building A with these photos" | Approval |
| Contact-change requests of buyers: list them and decide one. Approve only after you called the buyer on the phone on file; the buyer is e-mailed the decision. Needs Property sales: legal | "Which contact-change requests are waiting?" | Read; deciding: binding |
| Also: send an offer through the portal; the signing of a contract can invite the buyers to the portal; confirming or allocating a payment can e-mail the buyers that the payment was received | "Send the offer to Petrov's portal" | Binding (the buyers are e-mailed) |
Property sales: handover, snags and warranty claims
These need Property sales: handover and warranty (Продажби на имоти: предаване и гаранции). See Handover and warranty claims.
| BORO can | Example request | Type |
|---|---|---|
| Show the handovers of a project and of one deal; propose a handover appointment, move it or cancel it (the buyers with portal access are e-mailed) | "Propose a handover of A-12 to Petrov on 10 March at 10:00" | Read; changes: approval |
| Record the handover protocol (the properties become handed over; there is no undo) and attach the signed protocol | "Record the handover of A-12 today with keys and meter readings" | Binding: cannot be undone |
| Snags: add, edit, add photos, move them on (start, fixed, verified, reopen, void); create a task for a snag on a task board. A fixed snag is verified by someone other than who marked it fixed | "Add a snag: scratched door in the bathroom of A-12, due in 14 days" | Approval |
| Warranty claims: list and open them with the buyer's photos; accept or reject one (a rejection is final and the buyer reads the reason); assign it; start or resolve it (the buyers are e-mailed); write to the buyer in the claim; add an internal note only colleagues see | "Accept claim 12 and assign it to Hydro Ltd by 30 April" | Read; changes: approval |
Property sales: client changes
See Client changes.
| BORO can | Example request | Type |
|---|---|---|
| List and open client changes with the buyer's files; record a change a buyer asked for outside the portal; record the technical assessment (not admissible rejects the change for good, and the buyer reads the reason) | "Record Petrov's request to move the kitchen wall in A-12" | Read; changes: approval |
| Price a change: suggest cost lines from your task templates, draft and edit the price, submit it; issue it to the buyers (another sales manager than the one who submitted it; the buyers are e-mailed to approve it) | "Price the kitchen wall change at 1,800 EUR without VAT" | Approval; issuing is binding |
| Record the approval of a buyer without portal access; create the draft annex with the new payment plan; hand the change over for execution after the annex is signed; start, accept, close or cancel it | "Create the annex for client change 4 of deal 2026-014" | Approval |
Actions that are binding or cannot be undone
What BORO cannot do
- Act outside your permissions, your plan or the selected company, or see other companies' internal data.
- Invite people to the company or accept invitations, transfer company ownership, change your own role or the owner's role.
- Change the company profile, the subscription plan or seats, buy credits or pay invoices. It can only show the plan, invoices and balance.
- Change your profile, password or notification settings.
- Delete a project (it can archive it), a contract, a partner, or a work task (it archives tasks instead).
- Undo a signed contract, an approved payment application or a locked version.
- Work on its own without being asked. BORO acts only in a conversation or a background task you started; it does not watch your projects.
- Do anything in an external service unless that service is connected in BORO Settings → External connections.
- Take or show a client's personal ID number (ЕГН/ЛНЧ) or the number of an identity document, not even for a duplicate search or a client check. Enter it on the client card; a merge of clients whose personal ID numbers differ is done on screen.
- Activate Property sales for a project or create the suggested sales roles. BuildColab staff do that when they activate the module.
- Change Property sales through an AI tool connected over MCP. Connected tools only read the module.
- Act for a buyer in the buyer portal: decide an offer or a client-change price, give or withdraw consents, change the buyer's contact details, answer a handover appointment, submit a warranty claim or its photos, or close the buyer's access. Only the buyer does these, signed in to the portal.
BORO and connected AI tools (MCP)
Claude, ChatGPT and other AI tools connected to BuildColab through MCP use the same tools as BORO, with the same permissions. Without write access they can only read. With write access, which BuildColab staff enable per company, they can make the changes listed above without approval cards: BuildColab tells the AI tool to make a change as soon as you ask for it, without asking you to confirm it first, and the change happens as soon as the tool calls it. There are two exceptions: deleting and legally binding actions. Before it calls one of these tools, the AI tool is told to ask for your confirmation. Background tasks and opening screens for you are BORO-only.
- Deleting: every delete tool, including deletes you can recover from, such as BoQ positions or files moved to the trash:
delete_boq,delete_boq_category,delete_boq_import_draft,delete_boq_tasks,delete_contracting_package,delete_external_offer_list,delete_file_comment,delete_files,delete_meeting,delete_meeting_series,delete_nomenclature_items,delete_payment_application,delete_progress_report,delete_schedule_dependencies,delete_schedule_items,delete_skillanddelete_task_template. - Legally binding actions: signing a contract (
sign_contract), accepting a contract proposal (respond_to_contract_proposal), finalizing a change order (finalize_change_order), contracting a self-managed subcontractor from the BoQ (create_boq_subcontract), approving a payment application (approve_payment_application) and finalizing an external payment application (finalize_external_payment_application). - Legally binding actions in contract finance: setting a contract's financial terms (
set_contract_financial_terms), certifying a payment application (certify_payment_application), confirming payment certificates (confirm_payment_certificate,confirm_payment_certificates), accepting an invoice difference (accept_invoice_difference) and approving a contract's inclusion (approve_contract_finance_activation).
Every other action runs without asking, including some that remove or cancel something: removing a member from a project, withdrawing an offer request or a payment application, voiding an external payment application, archiving a contracting package. The AI tool is still told to say when an action notifies or e-mails another company, cannot be undone or spends credits. Your AI tool can still ask you before any change, depending on its own settings.
Skills over MCP. External AI tools connected through MCP (for example Claude) can see BuildColab's skills: the built-in skills available on your plan and your company's switched-on (enabled) skills. Before doing a kind of work a skill covers, the tool loads that skill and follows its steps, the same way BORO does. Switched-off skills are not offered. This works with read-only access too; listing and loading skills changes nothing. With write access, and with BORO Skills (author) at Edit, the tool can also create, edit, switch on or off and delete your company's skills, without an approval card; before deleting a skill (delete_skill) it is told to ask you first. Switching a skill on means BORO follows it for everyone in the company. See Skills.
Limit for connected AI tools. Each user has a budget of calls per minute: the Requests per minute (per user) (Съобщения в минута (на потребител)) value in BORO Settings → Governance, 30 by default. The whole company together may use up to three times that value; when the company total is reached, each user still gets a fair share of it. A bulk change counts as 1 call plus 1 for every 50 items in it. Over the limit the tool is told how many seconds to wait before it tries again. A single bulk change too large for your whole per-minute budget is refused, and the tool is told to split it into smaller ones. See Connecting Claude, ChatGPT and others (MCP).
Property sales over MCP. Connected AI tools can read the Property sales module with your permissions, but they cannot change anything in it, even when your company has MCP write access: every Property sales change needs your approval on a card in the BORO panel. They never see a personal ID number either.
Long answers over MCP. When the answer of a BuildColab tool is too long, the external AI tool gets the first part and a reference, and reads the rest in parts with the tool fetch_tool_output. The parts are kept for 24 hours. Over MCP only the account that made the request can read them. This works with read-only access too; reading parts changes nothing.
When the bill of quantities is busy. If another change to the same bill of quantities (BoQ) is being saved, a change from BORO or from a connected AI tool is refused as busy, and the tool is told to wait about 5 seconds and repeat. It is told to repeat the same request only when that is safe: always for setting prices and for editing positions, and for creating positions only when the whole call ran as one step. Otherwise it is told to read the BoQ again and repeat only what is missing, so nothing is added twice. This applies in BORO too.
When a tool is switched off for your company. If an external AI tool asks for a BuildColab tool that is not available to it, the tool is told that it is disabled and why: MCP write access is not enabled for your company; your company's tool policy (BORO Settings → Tools (Инструменти)) blocks it; the policy requires an approval, which connected AI tools cannot give (use BORO instead); or your role lacks the permission. A tool name that does not exist still gets "Unknown tool".
The tool list over MCP. External AI tools (Claude, ChatGPT) see BuildColab's tools in a short list and look up a tool's full description with the tool describe_tools when they need it. A connection therefore starts faster and leaves the assistant more room to work. Every tool is still available. In the short list, a tool that deletes or is legally binding is marked as one the AI tool must confirm with you first; other write tools run without asking. If an AI tool calls a tool with wrong argument names, it gets the tool's parameters back and calls it again; the wrong call changes nothing.
Parameter types over MCP. Connected AI tools receive the parameter types of every BuildColab tool, so amounts, quantities, yes/no options and lists are passed directly. After BuildColab adds new tools, reconnect the BuildColab connector in your AI client to see them.
Reading a whole bill of quantities over MCP. An AI tool can read a whole bill of quantities (BoQ) in a few steps with the tool get_boq_positions, up to 1,250 positions at a time. If the BoQ changes while the tool is reading it, the tool starts again from the beginning.
Common questions
Can I send BORO an invoice PDF to register?
Yes. Attach the PDF in the chat and ask BORO to register it. BORO reads the invoice, matches the contract and the certificate of acceptance and payment, and proposes the registration on an approval card with every figure. Compare them with the PDF before you approve; the PDF is kept in your company's files with the invoice. You need Contract finance at Edit.
Can BORO send an offer request or sign a contract for me?
Yes, if you have the permission. BORO shows an approval card first; the request is sent or the contract signed only when you click Approve. Signing directly is possible only for a self-contract or with a self-managed subcontractor; with another company on BuildColab, BORO sends a contract proposal instead.
How do I set the project start and end dates? There is no field.
Ask BORO, for example "Set the start date of this project to 01.03.2027 and the end date to 30.06.2028". Only the company that created the project can change its details.
How do I compare two schedule versions?
Ask BORO, for example "Compare schedule versions 3 and 4" or "What slipped since the last locked version?". BORO lists added and removed tasks, changed dates and durations, and changed dependencies.
How do I see the progress history of a schedule task?
Ask BORO, for example "Show the progress history of the task 'Slab formwork level 2'". It lists each entry with date, percentage, who reported it and the note.
Why does BORO say it has no permission?
BORO uses your permissions. If you cannot do the action on screen, BORO cannot do it either. Ask your administrator for the permission. See Permission reference.
Can BORO delete things?
Some: BoQ positions and categories, a whole BoQ, files (to the trash), meetings, templates, library items, contracting packages, schedule items and draft payment applications, each after approval. It cannot delete projects, contracts, partners or work tasks.
BORO did something wrong. How do I undo it?
Undo it the way you would undo your own change: edit the item back, restore a file from the trash or an older version, or ask BORO to reverse it ("put the previous price back"). Binding actions cannot be undone.
Can BORO work on many positions at once?
Yes, within limits per approval: for example up to 100 new positions, 15 positions priced from history, 500 positions labelled, 200 positions edited, 500 direct unit prices, 300 analyses changed together, and one resource's rate across a whole BoQ. For larger jobs BORO splits the work or runs a background task. See Bulk changes in one step.
Can BORO raise the price of one resource in every analysis, for example labour +10%?
Yes. Ask, for example, "Labour +10% across this BoQ" or "This concrete at 210 EUR in every analysis". BORO changes that resource in all the analyses in one approval and reports the new unit prices and the new BoQ total. A service line that holds a subcontractor's offered price keeps that price. Accepted budgets and signed contracts are not changed.
My AI tool says "Rate limit reached". What does it mean?
The tool made more calls in the last minute than your Requests per minute (per user) allows, or the whole company reached its shared ceiling. The message says how many seconds to wait; good AI tools wait and try again. Asking for one bulk change instead of many single changes uses far fewer calls. Your company administrator can raise the value in BORO Settings → Governance.
Can BORO confirm a payment I recorded?
No, not while the Four eyes (Четири очи) rule for payments is on, which is the default. The person who recorded a buyer's payment can never confirm it, on screen or through BORO: BORO refuses and tells you that a colleague with the Payment confirmation (Потвърждаване на плащане) authority has to confirm it. That colleague can do it on screen or ask their own BORO. The same rule applies to construction events: the person who submitted an event cannot confirm it.
Can BORO enter a client's ЕГН?
No. BORO never takes or shows a client's personal ID number (ЕГН/ЛНЧ) or the number of an identity document, also not in a duplicate search, a merge or a KYC check. Enter the number on the client card in Property sales (Продажби на имоти). BORO can still create the client, record consents, GDPR requests and KYC checks, and everything else on the card.
Can BORO approve a discount or a hold extension for me?
BORO can propose your decision on a request you may decide, and the decision is recorded in your name when you approve the card, under your own approval authority and limit. It cannot decide a request you made yourself (four eyes), and it never decides anything on its own. When you lack the authority for that kind of request or its limit, BORO tells you why it was refused, and the request waits for someone who has it.
We set the tools to No approval. Why does BORO still ask before a sales change?
Property sales changes always show the approval card Requires approval (Изисква одобрение). The setting No approval in BORO Settings → Tools does not apply to them, because they bind clients, money and contracts. Your company can only block a sales tool completely (Blocked).
Can Claude or ChatGPT change our property sales?
No. AI tools connected through MCP can read Property sales with your permissions, but every change is made in the BORO panel, with your approval, or on screen. This holds even when your company has MCP write access.
Can BORO send an offer to a client?
Yes. BORO prepares the draft, shows you what it will send and to whom, and sends it when you approve the card. Sending freezes the offer version and e-mails the client the PDF. An offer with a discount above your limit must be approved first; BORO can submit it for that approval.
Can BORO send a payment notice to a buyer?
Yes, with Payments register at Edit. BORO drafts the notice for the installment, and sends it when you approve the card. Sending is a legal act toward the buyer: the notice cannot be cancelled afterwards, and an installment whose term runs from the notice gets its due date from it.
My AI tool says a tool is "disabled for your company". Why?
The tool exists but is not available to the connected AI tool, and the message gives the reason. "MCP write access not enabled": your company has read-only access, and BuildColab staff enable write access per company. "Company tool policy": your company set the tool to Blocked (Забранен) in BORO Settings → Tools. "Needs approval": the tool is set to With approval (С одобрение); connected AI tools cannot show an approval card, so do that work in BORO. "Missing permission": your role lacks the permission the matching screen needs. See Permission reference. A message "Unknown tool" means the name does not exist.
Can my AI tool read a whole bill of quantities?
Yes. Over MCP an AI tool reads a whole BoQ in a few steps with get_boq_positions, up to 1,250 positions at a time. If the BoQ changes while it is reading, it starts again from the beginning. This works with read-only access.
Why does my AI tool look up a tool before using it?
External AI tools (Claude, ChatGPT) see BuildColab's tools in a short list and fetch a tool's full description with describe_tools when they need it. Every tool is still available. If a call uses wrong argument names, the tool gets the parameters back and calls again; the wrong call changes nothing.
My AI tool says the answer is cut off. How does it read the rest?
When a BuildColab tool's answer is too long, the AI tool gets the first part and a reference, and reads the rest in parts with fetch_tool_output. The parts are kept for 24 hours, and over MCP only the account that made the request can read them.
BORO or my AI tool says the bill of quantities is busy. What should I do?
Another change to the same BoQ was being saved at that moment, so yours was refused. The assistant is told to wait about 5 seconds and repeat; you do not need to do anything. It repeats the same request only when that is safe (setting prices, editing positions, and creating positions when the whole call ran as one step). Otherwise it reads the BoQ again and adds only what is missing.