Viewing and editing documents
On this page
- Which files open where
- Quick preview
- PDF files on a phone
- The editor page
- How to edit and save a document
- When two people edit the same document
- When the editor opens read-only
- Limits and messages in the editor
- Text, Markdown and CSV files
- Company letterheads (Letterheads tab)
- Project BoQ documents (BoQ documents tab)
- Common questions
- Related
| Where | Click a file in the file manager. The editor opens at /companies/{company}/files/file/{file}/edit or /projects/{project}/files/file/{file}/edit. Letterheads: company Files → tab Letterheads (Шапки). BoQ documents: project File manager → tab BoQ documents (КСС документи). |
|---|---|
| Who can | Anyone who can see the file can open it. Saving changes needs Edit (Редакция) access to the file. Managing letterheads needs File manager Edit at company level. On the Free plan the File Manager is read-only: you can browse, open, preview and download files, including files attached to offer requests you receive. Uploading, creating folders, renaming, moving, deleting and sharing need a paid plan. Saving changes to a document also needs a paid plan. |
| Related | Versions, Sharing, comments and mentions, Exporting, Importing a BoQ from Excel |
Which files open where
| File type | Opens in | What you can do |
|---|---|---|
| Word (.docx) | Document editor | Edit text, formatting, tables and images like in a word processor; save as a new version. |
| Excel (.xlsx, .xls) | Spreadsheet editor | Edit cells, formulas and sheets; save as a new version. A legacy .xls file is saved with .xlsx content. |
| PDF (.pdf) | PDF viewer | View, annotate and fill in form fields; save the result as a new version. The PDF text itself cannot be rewritten. On a phone the PDF opens read-only (see below). |
| Markdown (.md) | Text editor with Edit (Редакция) and Preview (Преглед) modes | Write formatted notes; the preview renders headings, lists, tables and Mermaid diagrams. |
| Text (.txt), CSV (.csv) | Text editor | Edit the text directly. |
| HTML artifact (.html) | Protected page viewer | View an interactive page created by BORO. See AI features: search, artifacts, diagrams. |
| Processed 3D/CAD model | 3D viewer | See 3D/BIM models and processing credits. |
| Images and other previewable files | Quick preview (Бърз преглед) | View in a window; download. |
| Other types | — | Download and open on your computer: This file type is not supported for preview. Please download it to open it. |
Quick preview
Quick preview shows a file in a window over the file manager, so you do not lose your place in the folder. Click an image to open it in quick preview, or right-click any previewable file and choose Quick preview (Бърз преглед). If the file is damaged you see This file cannot be opened. It may be corrupted.
PDF files on a phone
On a phone, in the BuildColab mobile app or in a phone's browser, a PDF opens in a simpler viewer made for small screens. It is for reading only.
- Each page fills the width of the screen. Scroll down to move through the pages.
- Zoom with two fingers, or with − and + in the bar at the bottom. Tap the percentage to go back to Fit to width (По ширината).
- The bar also shows which page you are on, for example 3 / 12.
To annotate a PDF or fill in its form fields, open it on a computer.
The editor page
When you click a Word, Excel, PDF, Markdown, text or CSV file in the file manager, the editor opens on its own page.
- The Files (Файлове) button returns to the folder the file is in.
- The file name and the number of the version you are looking at.
- The panel tabs Comments (Коментари), History (История) and Details (Детайли) open a side panel with the discussion, the versions and the file information.
- Discard changes (Отхвърли промените) throws away your unsaved edits.
- Save (Запази) stores your edits as a new version and takes you back to the folder the file is in; it is active only when there is something to save.
- The document area where you edit.
How to edit and save a document
- In the file manager, click the file. The editor opens.
- Make your changes.
- Click Save (Запази). The message The document has been saved as a new version. confirms it, and the editor closes and returns you to the folder the file is in. The previous content stays in the version history.
- To keep editing, click the file again; the editor opens on the version you just saved.
Everyone with access to the file gets a notification about the new version. If you leave the page with unsaved edits, the dialog Unsaved changes (Незапазени промени) asks You have unsaved changes. Are you sure you want to leave? Click Stay (Остани) to keep editing or Leave without saving (Напусни без запазване) to drop them.
When two people edit the same document
BuildColab does not lock a document while someone edits it. If a colleague saves a newer version while you still have the document open, the editor shows the banner A newer version (v{n}) was saved by {name}. You have two choices:
- Reload (Презареди) loads the colleague's version. If you have unsaved edits, the button reads Reload (discard my changes) (Презареди (без моите промени)) and your edits are lost.
- Save mine as newest anyway (Запази моята като най-нова) asks Save your version as the newest? with the explanation The other version (v{n}) stays in the version history, and yours becomes the newest one. Click Save as newest (Запази като най-нова) to confirm. As with Save, the editor then returns you to the folder.
Nothing is ever lost: whichever you choose, both versions remain in the version history. The plain Save button is disabled while the banner is shown, so you never save over a newer version by accident.
When the editor opens read-only
The editor opens in read-only mode, with the note You are viewing the document in read-only mode. (Преглеждате документа в режим само за четене.), in these cases:
- You have Read (Четене) or Comment (Коментиране) access to the file, but not Edit (Редакция).
- You are viewing an older version from the History panel. To edit it, restore it as current first; see Versions.
- The text file's character encoding could not be recognized: The file's text encoding couldn't be recognised, so it opens read-only to keep it intact.
Limits and messages in the editor
| Situation | What you see and what to do |
|---|---|
| The file is larger than 25 MB | File is too large — This document exceeds the maximum size for in-browser editing. You can download the original file. Use Download original file (Изтегли оригиналния файл) and edit it on your computer, then upload it as a new version. |
| The document cannot be loaded | Failed to load the document. You can download the original file. |
| Saving fails | Failed to save the document. Please try again. Your edits are still on the screen; try Save again. |
| The company storage is full | Storage is full. Free up space or upgrade your plan to upload a new version. Free up space, then save again. |
| The editor service is not available | The document editor is not configured. You can download the original file. |
Text, Markdown and CSV files
Markdown (.md), text (.txt) and CSV (.csv) files open in the BuildColab text editor. A Markdown file has two modes, switched by Editor mode (Режим на редактора): Edit (Редакция) for the source text and Preview (Преглед) for the formatted result, including Mermaid diagrams. An empty file shows Nothing to preview yet. in preview.
The editor shows the file's character encoding as Encoding: {name} (Кодиране: {name}). Old Bulgarian files are often in Windows-1251. If you type characters that Windows-1251 cannot hold, the editor lists them (These characters can't be saved in Windows-1251: {chars}) and offers Save as UTF-8 instead (Запиши като UTF-8). Until you choose it, saving is refused with Not saved: some characters can't be written in Windows-1251. Choose "Save as UTF-8" in the editor.
Company letterheads (Letterheads tab)
The Letterheads (Шапки) tab exists only in the company file area. Its title is Company letterheads (Фирмени шапки). A letterhead is an Excel (.xlsx) header template with your company's logo, details and layout. When you export a bill of quantities (BoQ), the export wizard puts the BoQ under the chosen letterhead, and the default letterhead is preselected. See Exporting.
How to add a letterhead
- Open company sidebar → Files (Файлове) → tab Letterheads (Шапки).
- Click Upload template (Качи шаблон) and choose an .xlsx file, or click Create blank (Създай празен) to start from an empty template named "New template" (Нов шаблон).
- Click the template to open it in the spreadsheet editor. The Placeholder tokens (Заместващи полета) tab lists the fields you can place in the header, such as project or BoQ details, which the export fills in.
- Click Save (Запази).
- In the template's menu choose Set as default (Задай по подразбиране). The template gets the badge Default (По подразбиране).
The template menu also has Open (Отвори), Download (Изтегли), Rename (Преименувай) and Delete (Изтрий), which asks Are you sure you want to delete this template? Only .xlsx files are accepted (Only .xlsx templates are supported.), and two templates cannot share a name (A template with this name already exists.). Managing letterheads needs File manager Edit (Редакция) at company level; with View you can open and download them only.
Project BoQ documents (BoQ documents tab)
The BoQ documents (КСС документи) tab exists only in a project's file manager. It collects the files that belong to the project's bills of quantities, which do not appear in the ordinary folder tree:
- the panel BoQ lists (КСС листове) on the left, where you pick a BoQ;
- Bid sources (Първоизточници): the original Excel workbook a BoQ was imported from (see Importing a BoQ from Excel);
- Exports (Експорти): every export generated from that BoQ, newest first (see Exporting);
- Other files (Други файлове) that belong to the BoQ.
Each document has Open (Отвори) for editable types and Download (Изтегли). The document's owner also has Share (Споделяне) and Delete (Изтрий); delete asks Are you sure you want to delete this document? When the tab is empty it says Imported bid workbooks and the exports generated from them will appear here.
- The BoQ documents (КСС документи) tab.
- The BoQ lists (КСС листове) panel, where you choose a BoQ.
- The Bid sources (Първоизточници) section with the imported workbook.
Common questions
Do I need Word or Excel installed to edit documents?
No. The BuildColab file manager opens .docx, .xlsx, .xls and .pdf files in editors inside the browser. Click the file, edit, and click Save (Запази).
Does saving overwrite the old document?
No. Every Save in the editor creates a new version. The previous content stays in the version history and can be viewed, downloaded or restored. See Versions.
Why does the editor say "You are viewing the document in read-only mode."?
You have Read or Comment access to the file but not Edit, or you are looking at an older version. Ask the file's owner to share it with you at Edit (Редакция), or restore the old version as current.
Can I edit the text of a PDF?
No. The PDF viewer lets you view, annotate and fill in form fields, and save the result as a new version. To change the text, edit the source document (for example the Word file) and export a new PDF.
Why can't I annotate a PDF on my phone?
On a phone, PDFs open in a viewer for reading. It fits the pages to the screen and zooms with two fingers, but it has no annotation or form tools. Open the file on a computer to annotate it or fill it in.
The editor says "File is too large". What can I do?
Editing in the browser is limited to 25 MB. Click Download original file (Изтегли оригиналния файл), edit the file on your computer, then upload it as a new version from Version History → Upload New Version.
A colleague saved while I was editing. Did I lose my work?
No. The banner A newer version (v{n}) was saved by {name}. appears. Choose Save mine as newest anyway to keep your edits as the newest version, or Reload to continue from your colleague's version. Both versions stay in the history.
Cyrillic text in an old .txt file looks wrong or the file opened read-only. Why?
The file uses an encoding the editor could not recognize, so it opens read-only to protect it. Download it, convert it to UTF-8 on your computer and upload it as a new version. Files in Windows-1251 are recognized; if you add characters Windows-1251 cannot hold, use Save as UTF-8 instead.