Das Benutzerhandbuch ist auf Englisch und Bulgarisch verfügbar. Sie lesen die englische Fassung.

Viewing and editing documents

Auf dieser Seite
  1. Which files open where
  2. Quick preview
  3. The editor page
  4. How to edit and save a document
  5. When two people edit the same document
  6. When the editor opens read-only
  7. Limits and messages in the editor
  8. Text, Markdown and CSV files
  9. Company letterheads (Letterheads tab)
  10. Project BoQ documents (BoQ documents tab)
  11. Common questions
  12. Related
WhereClick a file in the file manager. The editor opens at /companies/{company}/files/file/{file}/edit or /projects/{project}/files/file/{file}/edit. Letterheads: company Files → tab Letterheads (Шапки). BoQ documents: project File manager → tab BoQ documents (КСС документи).
Who canAnyone who can see the file can open it. Saving changes needs Edit (Редакция) access to the file. Managing letterheads needs File manager Edit at company level.
RelatedVersions, Sharing, comments and mentions, Exporting, Importing a BoQ from Excel

Which files open where

File typeOpens inWhat you can do
Word (.docx)Document editorEdit text, formatting, tables and images like in a word processor; save as a new version.
Excel (.xlsx, .xls)Spreadsheet editorEdit cells, formulas and sheets; save as a new version. A legacy .xls file is saved with .xlsx content.
PDF (.pdf)PDF viewerView, annotate and fill in form fields; save the result as a new version. The PDF text itself cannot be rewritten.
Markdown (.md)Text editor with Edit (Редакция) and Preview (Преглед) modesWrite formatted notes; the preview renders headings, lists, tables and Mermaid diagrams.
Text (.txt), CSV (.csv)Text editorEdit the text directly.
HTML artifact (.html)Protected page viewerView an interactive page created by BORO. See AI features: search, artifacts, diagrams.
Processed 3D/CAD model3D viewerSee 3D/BIM models and processing credits.
Images and other previewable filesQuick preview (Бърз преглед)View in a window; download.
Other types—Download and open on your computer: This file type is not supported for preview. Please download it to open it.

Quick preview

Quick preview shows a file in a window over the file manager, so you do not lose your place in the folder. Click an image to open it in quick preview, or right-click any previewable file and choose Quick preview (Бърз преглед). If the file is damaged you see This file cannot be opened. It may be corrupted.

The editor page

When you click a Word, Excel, PDF, Markdown, text or CSV file in the file manager, the editor opens on its own page.

Word document open in the BuildColab editor
Figure: A Word document open in the editor.
  1. The Files (Файлове) button returns to the folder the file is in.
  2. The file name and the number of the version you are looking at.
  3. The panel tabs Comments (Коментари), History (История) and Details (Детайли) open a side panel with the discussion, the versions and the file information.
  4. Discard changes (Отхвърли промените) throws away your unsaved edits.
  5. Save (Запази) stores your edits as a new version; it is active only when there is something to save.
  6. The document area where you edit.

How to edit and save a document

  1. In the file manager, click the file. The editor opens.
  2. Make your changes.
  3. Click Save (Запази). The message The document has been saved as a new version. confirms it. The previous content stays in the version history.
  4. Click Files (Файлове) to go back to the folder.

Everyone with access to the file gets a notification about the new version. If you leave the page with unsaved edits, the dialog Unsaved changes (Незапазени промени) asks You have unsaved changes. Are you sure you want to leave? Click Stay (Остани) to keep editing or Leave without saving (Напусни без запазване) to drop them.

When two people edit the same document

BuildColab does not lock a document while someone edits it. If a colleague saves a newer version while you still have the document open, the editor shows the banner A newer version (v{n}) was saved by {name}. You have two choices:

  • Reload (Презареди) loads the colleague's version. If you have unsaved edits, the button reads Reload (discard my changes) (Презареди (без моите промени)) and your edits are lost.
  • Save mine as newest anyway (Запази моята като най-нова) asks Save your version as the newest? with the explanation The other version (v{n}) stays in the version history, and yours becomes the newest one. Click Save as newest (Запази като най-нова) to confirm.

Nothing is ever lost: whichever you choose, both versions remain in the version history. The plain Save button is disabled while the banner is shown, so you never save over a newer version by accident.

When the editor opens read-only

The editor opens in read-only mode, with the note You are viewing the document in read-only mode. (Преглеждате документа в режим само за четене.), in these cases:

  • You have Read (Четене) or Comment (Коментиране) access to the file, but not Edit (Редакция).
  • You are viewing an older version from the History panel. To edit it, restore it as current first; see Versions.
  • The text file's character encoding could not be recognized: The file's text encoding couldn't be recognised, so it opens read-only to keep it intact.

Limits and messages in the editor

SituationWhat you see and what to do
The file is larger than 25 MBFile is too large — This document exceeds the maximum size for in-browser editing. You can download the original file. Use Download original file (Изтегли оригиналния файл) and edit it on your computer, then upload it as a new version.
The document cannot be loadedFailed to load the document. You can download the original file.
Saving failsFailed to save the document. Please try again. Your edits are still on the screen; try Save again.
The company storage is fullStorage is full. Free up space or upgrade your plan to upload a new version. Free up space, then save again.
The editor service is not availableThe document editor is not configured. You can download the original file.

Text, Markdown and CSV files

Markdown (.md), text (.txt) and CSV (.csv) files open in the BuildColab text editor. A Markdown file has two modes, switched by Editor mode (Режим на редактора): Edit (Редакция) for the source text and Preview (Преглед) for the formatted result, including Mermaid diagrams. An empty file shows Nothing to preview yet. in preview.

The editor shows the file's character encoding as Encoding: {name} (Кодиране: {name}). Old Bulgarian files are often in Windows-1251. If you type characters that Windows-1251 cannot hold, the editor lists them (These characters can't be saved in Windows-1251: {chars}) and offers Save as UTF-8 instead (Запиши като UTF-8). Until you choose it, saving is refused with Not saved: some characters can't be written in Windows-1251. Choose "Save as UTF-8" in the editor.

Company letterheads (Letterheads tab)

The Letterheads (Шапки) tab exists only in the company file area. Its title is Company letterheads (Фирмени шапки). A letterhead is an Excel (.xlsx) header template with your company's logo, details and layout. When you export a bill of quantities (BoQ), the export wizard puts the BoQ under the chosen letterhead, and the default letterhead is preselected. See Exporting.

How to add a letterhead

  1. Open company sidebar → Files (Файлове) → tab Letterheads (Шапки).
  2. Click Upload template (Качи шаблон) and choose an .xlsx file, or click Create blank (Създай празен) to start from an empty template named "New template" (Нов шаблон).
  3. Click the template to open it in the spreadsheet editor. The Placeholder tokens (Заместващи полета) tab lists the fields you can place in the header, such as project or BoQ details, which the export fills in.
  4. Click Save (Запази).
  5. In the template's menu choose Set as default (Задай по подразбиране). The template gets the badge Default (По подразбиране).

The template menu also has Open (Отвори), Download (Изтегли), Rename (Преименувай) and Delete (Изтрий), which asks Are you sure you want to delete this template? Only .xlsx files are accepted (Only .xlsx templates are supported.), and two templates cannot share a name (A template with this name already exists.). Managing letterheads needs File manager Edit (Редакция) at company level; with View you can open and download them only.

Project BoQ documents (BoQ documents tab)

The BoQ documents (КСС документи) tab exists only in a project's file manager. It collects the files that belong to the project's bills of quantities, which do not appear in the ordinary folder tree:

  • the panel BoQ lists (КСС листове) on the left, where you pick a BoQ;
  • Bid sources (Първоизточници): the original Excel workbook a BoQ was imported from (see Importing a BoQ from Excel);
  • Exports (Експорти): every export generated from that BoQ, newest first (see Exporting);
  • Other files (Други файлове) that belong to the BoQ.

Each document has Open (Отвори) for editable types and Download (Изтегли). The document's owner also has Share (Споделяне) and Delete (Изтрий); delete asks Are you sure you want to delete this document? When the tab is empty it says Imported bid workbooks and the exports generated from them will appear here.

BoQ documents tab of a project file manager
Figure: The BoQ documents tab of a project whose BoQ was imported from Excel.
  1. The BoQ documents (КСС документи) tab.
  2. The BoQ lists (КСС листове) panel, where you choose a BoQ.
  3. The Bid sources (Първоизточници) section with the imported workbook.

Common questions

Do I need Word or Excel installed to edit documents?

No. The BuildColab file manager opens .docx, .xlsx, .xls and .pdf files in editors inside the browser. Click the file, edit, and click Save (Запази).

Does saving overwrite the old document?

No. Every Save in the editor creates a new version. The previous content stays in the version history and can be viewed, downloaded or restored. See Versions.

Why does the editor say "You are viewing the document in read-only mode."?

You have Read or Comment access to the file but not Edit, or you are looking at an older version. Ask the file's owner to share it with you at Edit (Редакция), or restore the old version as current.

Can I edit the text of a PDF?

No. The PDF viewer lets you view, annotate and fill in form fields, and save the result as a new version. To change the text, edit the source document (for example the Word file) and export a new PDF.

The editor says "File is too large". What can I do?

Editing in the browser is limited to 25 MB. Click Download original file (Изтегли оригиналния файл), edit the file on your computer, then upload it as a new version from Version History → Upload New Version.

A colleague saved while I was editing. Did I lose my work?

No. The banner A newer version (v{n}) was saved by {name}. appears. Choose Save mine as newest anyway to keep your edits as the newest version, or Reload to continue from your colleague's version. Both versions stay in the history.

Cyrillic text in an old .txt file looks wrong or the file opened read-only. Why?

The file uses an encoding the editor could not recognize, so it opens read-only to protect it. Download it, convert it to UTF-8 on your computer and upload it as a new version. Files in Windows-1251 are recognized; if you add characters Windows-1251 cannot hold, use Save as UTF-8 instead.

Why can't I change the letterheads?

Managing letterheads in the Letterheads (Шапки) tab needs File manager Edit (Редакция) at company level. With View you can only open and download them. Ask your company administrator.

Where are my BoQ exports saved?

Every BoQ export is saved in the project's file manager, tab BoQ documents (КСС документи), section Exports (Експорти), under the BoQ it was made from.