Das Benutzerhandbuch ist auf Englisch und Bulgarisch verfügbar. Sie lesen die englische Fassung.
The interface: sidebar, top bar, switching
Auf dieser Seite
| Where | On every page after sign-in. Company scope: /projects?companyId={company} and /companies/{company}/…; project scope: /projects/{project}/…; administration scope: /companies/{company}/admin/… |
|---|---|
| Who can | Every signed-in user. Which entries are shown or locked depends on the project phase, your company's role in the project, your permissions and your company's plan. |
| Related | Permission reference, Subscription, plans and billing, The project page, BORO — AI assistant |
The parts of the screen
- Sidebar (left): navigation. It changes with the scope you are in: company, project or administration.
- Top bar (above the content): the sidebar toggle, the breadcrumb trail, and on the right BORO, the theme switch, the calendar, the notification bell and your avatar.
- Billing banner (under the top bar, only sometimes): appears for the Company owner of a paid plan when an invoice is unpaid or overdue.
- Content (center): the page you opened. It is the only part of the screen that scrolls.
- BORO panel (floating): the AI assistant, opened from the top bar.
The browser tab title follows the page you are on and the project name, so several BuildColab tabs are easy to tell apart.
The top bar
From left to right, the top bar contains:
| Element | What it does | When it is shown |
|---|---|---|
| Sidebar toggle (panel icon) | Collapses the sidebar to icons only, or expands it to icons with labels. BuildColab remembers your choice in this browser. On a new browser the sidebar starts collapsed. | Always, on screens 768 px wide or more. |
| Menu (burger) icon | Opens the sidebar as a drawer over the page. The drawer closes when you pick an entry. | Only on screens narrower than 768 px (phones). |
| Breadcrumb trail | Shows where you are: company › project › current page, for example "Administration › Roles" (Администрация › Роли). Earlier crumbs are links. | Hidden on phones. |
| BORO button | Opens the BORO assistant panel. While the panel is open the button is hidden. | When BORO is enabled and a company is selected. Not shown on the company selection screen. |
| Theme switch (moon in light mode, sun in dark mode) | Switches between the light and the dark theme. The choice is saved on your profile and follows you to other devices. | Always. |
| Calendar icon (Open calendar / Отвори календара) | Opens the company calendar of work tasks and meetings, /calendar. This is the only way into the calendar. | When a company is selected and work tasks or meetings are available in your environment. |
| Bell (Notifications / Известия) | Opens the notifications panel. The red counter is the number of items that need action from you, not the number of unread items. | When notifications are available and a company is selected. |
| Avatar (photo or initials) | Opens the user menu: your name and e-mail, My profile (Моят профил) and Sign out (Изход). | Always. |
If the page has unsaved changes, both My profile and Sign out ask before leaving. Press Esc or click outside the menu to close it.
- The sidebar toggle collapses or expands the sidebar.
- The breadcrumb trail shows the company, the project and the current page.
- The BORO button opens the AI assistant.
- The theme switch changes between light and dark mode.
- The calendar icon, Open calendar, opens the company calendar.
- The bell, Notifications, with the counter of items that need your action.
- The user menu with My profile and Sign out.
The sidebar and its three scopes
The sidebar picks its scope from the page you are on:
- Company scope: on the project list and on company pages such as Nomenclatures, Files, Requests or Partners.
- Project scope: on any page inside a project (
/projects/{project}/…). - Administration scope: on any page under Admin (
/companies/{company}/admin/…).
Entries are grouped, with a thin line between groups. Which entries you see depends on three things: the project phase, your company's role in the project (investor, or contractor/subcontractor) and your permissions. So two colleagues may see different sidebars on the same project.
Company scope entries
The company scope starts with the Organization (Организация) chip, which shows the selected company and opens the company switcher (see "How to switch company" below). Then come these entries, in this order:
| # | Entry (EN / BG) | What it opens | Hidden or locked when |
|---|---|---|---|
| 1 | Projects / Проекти | The company's project list, /projects?companyId={company}. | Never locked. |
| 2 | Work tasks / Работни задачи | The "All tasks" view of every task board you can access in the company and its projects, /companies/{company}/task-boards. | Never locked: there is no permission for it, each board is shared individually. Not shown if work tasks are not available in your environment. |
| 3 | Meetings / Срещи | The company's own meetings (those that belong to no project), /companies/{company}/meetings. | Never locked. Not shown if meetings are not available in your environment. |
| 4 | Nomenclatures / Номенклатури | The company library of task templates, materials, labour and machines, /companies/{company}/nomenclatures. | Locked without the Nomenclature (Номенклатура) permission or on a plan without it (for example Free). |
| 5 | Files / Файлове | The company file manager, /companies/{company}/files. | Locked without the File manager (Файлов мениджър) permission or on a plan without the company Files page. The Free plan includes it. |
| 6 | Requests / Запитвания | Offer requests your company has received from other companies, /companies/{company}/offer-requests. The page is titled "Received requests" (Получени запитвания). A badge shows how many are still unanswered. | Locked without the Received bid requests (Получени запитвания) permission. |
| 7 | Report Register / Регистър на отчети | The register of payment applications of all company projects, /companies/{company}/payment-applications/register. | Locked without the Reports (Отчети) permission or on a plan without it (for example Free). |
| 8 | Partners / Партньори | The company's partner directory, /companies/{company}/partners. | Locked without the Partners (Партньори) permission or on a plan without it (for example Free). |
| Pinned at the bottom | Admin / Админ | Company administration, starting at /companies/{company}/admin/organization. It stays visible at the bottom and does not scroll away. | Never locked; some of its sub-entries are. |
- The Organization chip with the selected company.
- The Projects entry.
- The Work tasks entry.
- The Requests entry. When received requests are still unanswered, a badge with their number appears here.
- The Admin entry, pinned at the bottom.
Administration scope entries
Click Admin to enter the administration scope. Its header reads Administration (Администрация) with a back arrow that returns to the project list.
| # | Entry (EN / BG) | What it opens | Locked when |
|---|---|---|---|
| 1 | Organization / Организация | The company profile and company-wide settings, /companies/{company}/admin/organization. | Never; every member sees it. |
| 2 | Employees / Служители | Company members, licences and invitations to send, /companies/{company}/admin/employees. | Without the Members (Членове) permission. |
| 3 | Roles / Роли | Roles and their permissions, /companies/{company}/admin/roles. | Without the Members permission. |
| 4 | Sent invitations / Изпратени покани | Invitations your company has sent, /companies/{company}/admin/sent-invitations. | Without the Members permission. |
| 5 | Subscription / Абонамент | The plan, invoices and credits, /companies/{company}/admin/billing. | Never; every member sees it. Seeing invoices and changing the plan need the Members permission. |
Project scope entries
Inside a project the sidebar shows, from the top: one Projects (Проекти) entry that returns to the project list; the Project (Проект) chip with the project's name and logo, which opens the project switcher; then three groups of entries separated by lines. The project phases mentioned below are: Budgeting (Бюджетиране), Offering (Офериране), Offer sent (Изпратена оферта), Update requested (Заявена актуализация), Contract proposal (Предложение за договор), CONTRACT DECLINED (ОТКАЗАН ДОГОВОР) and Execution (Изпълнение). An investor's project goes from Budgeting straight to Execution; the other phases belong to a contractor's offering track.
Main group (under the project chip):
| Entry (EN / BG) | What it opens | Shown when | Locked without |
|---|---|---|---|
| Home / Начало | The project page, /projects/{project}. | All phases. | Projects (Проекти) |
| Drafts / Чернови | The investor's budget drafts, /projects/{project}/drafts. | Your company is the investor, in Budgeting. In Execution only while a draft of the next budget is open (for example after a partial acceptance). | Budget preparation (Изготвяне на бюджет) |
| Offers / Оферти | Your company's offers to its client, /projects/{project}/offers. | Your company is a contractor or subcontractor, in every phase from Offering to Execution. | Offers (Оферти) |
| Financial dashboard / Финансово табло | Budget versus costs, commitments and margin, /projects/{project}/financial-dashboard. | Execution only. | Financial dashboard (Финансово табло) |
| Outgoing bid requests / Изходящи запитвания | Offer requests your company sends to subcontractors and suppliers, /projects/{project}/offer-requests. Always the last entry of the group. | All phases. | Outgoing bid requests (Изходящи запитвания) |
Execution group (shown only when at least one entry applies):
| Entry (EN / BG) | What it opens | Shown when | Locked without |
|---|---|---|---|
| Budget / Бюджет (investor) or Contract with client / Договор с възложител (contractor) | The accepted budget, or the signed contract with your client, /projects/{project}/budget. The label depends on your company's role in the project. | Execution only. | Execution (Изпълнение) |
| Contracts with contractors / Договори с изпълнители | Your contracts with subcontractors and suppliers, /projects/{project}/costs. | Execution only. | Execution (Изпълнение) |
| Contracting schedule / График на договаряне | The plan of when each package must be requested, offered, awarded and signed, /projects/{project}/contracting. | Only for the company that owns the project, and only from Offer sent onwards (hidden while the project is in Budgeting or Offering). Other companies on the project never see it, not even locked. | Contracting schedule (График на договаряне), or on a plan without it (for example the Free plan) |
| Report Register / Регистър на отчети | The project's payment applications, /projects/{project}/payment-applications/register. | Execution only. | Reports (Отчети) |
| Construction schedule / Строителен график | The Gantt schedule, /projects/{project}/schedule. | Execution only. | Schedule (График) |
Support group (always at the bottom, in all phases):
| Entry (EN / BG) | What it opens | Locked without |
|---|---|---|
| File manager / Файлов мениджър | The project's files, /projects/{project}/files. | File manager (Файлов мениджър) |
| Work tasks / Работни задачи | The project's task boards, /projects/{project}/task-boards. Not shown if work tasks are not available in your environment. | Never locked. |
| Meetings / Срещи | The project's meetings, /projects/{project}/meetings. Not shown if meetings are not available in your environment. | Never locked. |
| Project team / Проектен екип | The people and companies on the project and their access, /projects/{project}/company/{company}/project-team. | Projects (Проекти) |
Drafts and Budget belong to the investor; Offers and Contract with client belong to a contractor. The same person never sees both pairs on one project, because the label follows your company's role in that project.
- The Projects entry returns to the project list.
- The Project chip opens the project switcher.
- The main group: Home to Outgoing bid requests.
- The execution group: budget or contract with client, contracts, contracting schedule, Report Register and Construction schedule.
- The support group: File manager, Work tasks, Meetings and Project team.
How to switch company
- In company scope, click the Organization chip at the top of the sidebar. Inside a project, first open the company flyout: hover over the company name at the top of the sidebar for half a second, or click its arrow (on touch screens the arrow is the only way).
- Click the company you want. The list shows every company you belong to, with its logo or initials; the selected one has a check mark.
- BuildColab saves the choice on your profile and opens that company's project list.
The company menu also contains a settings (cog) icon next to each company, which opens Organization details, and two items at the bottom: INVITES (ПОКАНИ) for the invitations you received and Create a new organization (Създаване на нова организация). See Create or join a company. Before any company is selected, the chip reads "Choose company" (Избери компания); if you belong to none, it reads "You do not belong to any organization" (Нямате организация към която принадлежите).
The company flyout inside a project shows the full company sidebar, including Admin, on top of the project sidebar. It closes when you move the pointer away or pick an entry.
- The company name that opens the flyout on hover or click.
- The company entries, the same as in company scope.
- The Admin entry, which opens the administration entries inside the flyout.
How to switch project
- Inside a project, click the Project (Проект) chip under the Projects entry.
- Click another project in the list. The list shows your company's most recent projects; for the full list click Projects instead.
The project menu also has a settings (cog) icon next to each project, which opens the project edit dialog (you need permission to edit projects; otherwise a permission message appears), and Create new project (Създаване на нов проект) at the bottom. See Project list and creating a project.
How to change the language
- Click your avatar in the top bar and choose My profile (Моят профил).
- In the Preferences (Предпочитания) section, open Language (Език) and choose Български or English.
The whole interface switches immediately, without reloading, and the choice is saved on your profile, so it follows you to other devices. Bulgarian is the default. The sign-in pages use the language last used in that browser. E-mails to you also follow your profile language (Bulgarian or English). A few server messages appear only in English.
How to switch between light and dark theme
Click the moon icon in the top bar to switch to the dark theme; click the sun icon to return to the light theme. The choice is saved on your profile and applies on every device where you sign in. When you sign out, the browser forgets it until you sign in again.
Where BORO lives
The BORO button sits first in the right-hand group of the top bar. Click it to open the BORO panel next to the page you are working on. BORO is available only when a company is selected, because it works with that company's data and with your permissions in it. The panel header holds New conversation, History, Settings and Close; your company's credit balance is the chip under the message field. See BORO — AI assistant.
Locked entries and access pages
A padlock on an entry has one of two causes:
- Plan restriction: your company's plan does not include the module (for example Financial dashboard on the Free plan). The fix is a plan change, made on Admin → Subscription by someone with the Members permission.
- Missing permission: the plan includes the module but your role does not grant it. The fix is for an administrator to add the permission to your role (or to your project access).
- Report Register (Регистър на отчети) with a padlock: the Free plan does not include it. Nomenclatures and Partners are locked the same way.
- The access page Premium feature (Премиум функция) — "This feature is in a higher plan".
- Browse plans (Разгледай планове) opens Admin → Subscription; Back (Назад) returns.
Clicking a locked entry opens an access page that names the cause. If both apply, the page shows the plan restriction. The same pages appear when you open a link to something you cannot see.
| Page heading (EN / BG) | Meaning | Buttons |
|---|---|---|
| Restricted access — "You don't have access to this section" / Ограничен достъп — "Нямаш достъп до този раздел" | Your role lacks the permission for this section. | Back (Назад); Request access (Поискай достъп) is marked "Coming soon" and does nothing yet. Ask your administrator. |
| Premium feature — "This feature is in a higher plan" / Премиум функция — "Тази функция е в по-висок план" | The company's plan does not include this module. | Back; Browse plans (Разгледай планове) opens Admin → Subscription. |
| No invitation — "This project hasn't been shared with you" / Няма покана — "Този проект не е споделен с теб" | You are not a member of this project's team. | Back; Request invitation (Поискай покана) is "Coming soon". Ask your administrator to add you to the project team. |
| No access — "You do not have access to this company" / Няма достъп — "Нямаш достъп до тази фирма" | The link belongs to a company you are not a member of, or you are working in another company. | Select a company (Избери фирма). |
| No company selected — "Choose a company to continue" / Няма избрана фирма — "Избери фирма, за да продължиш" | The page needs a selected company. | Select a company opens the company selection screen. |
| Access denied — "This content is not available to you" / Отказан достъп — "Това съдържание не е достъпно за теб" | You cannot see this particular record. | None; contact your administrator if you think this is a mistake. |
| Error 404 — "Page not found" / Грешка 404 — "Страницата не е намерена" | The address is wrong or the page has moved. | Back. |
When you can open a page but not change it, a click on an action button opens a short permission message instead: "You do not have permission to access this feature. Contact an administrator." (Нямате права за достъп до тази функционалност. Свържете се с администратор.). For the Company owner the message can instead point to a billing problem ("Access to this feature is limited by a billing issue with your company's plan…", button View invoice / Виж фактурата) or to a paid plan that has ended ("Your paid plan has ended and your company is now on the Free plan…", button Reactivate plan / Активирайте план).
The billing banner
The Company owner of a company on a paid plan sees a banner under the top bar when the latest invoice is unpaid. Other members never see it, and it never appears on the Free plan.
- Warning (Предупреждение): "You have an unpaid invoice" (Имате неплатена фактура) with the invoice number and the payment deadline, which is five days after the start of the invoice period, plus the note that some advanced features may be limited until payment.
- Overdue payment (Просрочено плащане): "You have an overdue payment for the company's subscription plan." (Имате просрочено плащане за абонаментния план на компанията.)
Both have the button View invoice (Виж фактурата), which opens Admin → Subscription. See Subscription, plans and billing.
On a phone
On screens narrower than 768 px the sidebar is hidden. Tap the menu (burger) icon in the top bar to open it as a drawer; it closes when you pick an entry or when the page changes. The breadcrumb trail is hidden to make room. The company flyout inside a project opens only by tapping the arrow next to the company name.
Common questions
Why can't I see Drafts in my project?
Drafts (Чернови) is shown only to the investor, while the project is in Budgeting (and in Execution only while a draft of the next budget is open). If your company is a contractor on the project, you see Offers (Оферти) instead.
Why is "Contracting schedule" missing from my project?
It appears only for the company that owns the project, and only once the project has passed Budgeting and Offering. Subcontractors and partners on the project never see it. If you are in the owning company and it has a padlock, you lack the Contracting schedule permission or the company's plan does not include the contracting schedule (the Free plan does not).
What does the padlock next to an entry mean?
Your role or your company's plan does not include that module. Click the entry: the page that opens says which of the two it is. Ask your administrator for the permission, or a plan that includes it.
Where are Contracts, Report Register and Construction schedule before the project starts?
They belong to the execution group and appear only when the project reaches the Execution phase, that is after the budget is accepted or the contract is signed.
How do I get back to the company menu from inside a project?
Click Projects at the top of the sidebar to return to the project list, or hover over (or click the arrow of) the company name to open the company flyout with all company entries, including Admin.
The bell shows a number but I've read everything. Why?
The counter shows items that need action from you, not unread items. It goes down when the work is done (for example the payment application is approved), not when you read the notification. See Notifications and their settings.
I don't see the BORO button. Why?
BORO needs a selected company. On the company selection screen there is no BORO button; select a company first. If you still don't see it, BORO is not enabled in your environment.
Why does the sidebar start collapsed every time I use a new computer?
The collapsed or expanded state is remembered per browser, not on your profile. Expand it once with the toggle at the left of the top bar, and that browser remembers it.
Why does the Requests entry in the company menu differ from Outgoing bid requests in the project?
Requests (Запитвания) in the company menu lists offer requests your company received from clients. Outgoing bid requests (Изходящи запитвания) in a project lists the requests your company sent to subcontractors and suppliers on that project. They use different permissions.