Skills
| Where | BORO panel → Settings (gear) → Skills (Умения). Also BORO panel → Add (+) in the message field → Skills. |
|---|---|
| Who can | Every member of the company sees the list, and BORO uses the switched-on skills for everyone. Creating, editing, switching on or off and deleting your company's own skills needs the company permission BORO Skills (author) (BORO умения (автор)) at Edit; the system roles Company owner and Manager have it. Which built-in skills are available depends on your plan. |
| Related | What BORO can do, Memory, Roles, Permission reference |
What a skill does
When your message matches a skill's topic, BORO loads the skill's instructions together with the tools the skill needs, and follows the procedure. You see this in the conversation as a quiet row "Using skill: {name}" (Използвам умение: {name}). A skill makes BORO more reliable on procedures with many steps, and it lets your company fix "the way we do it here": which markup to use, how to name categories, what to check before submitting an offer.
- Your request.
- The quiet row "Using skill: Pricing check".
- The tool calls and the answer that follow the skill's steps: each price compared with the last two projects, in a table.
A skill is different from a memory. A memory is one short fact ("our standard profit on labor is 15%"); a skill is a procedure of several steps. See Memory.
Built-in skills
Built-in skills carry the badge Built-in (Вградено). They are always on and cannot be edited or deleted. BuildColab maintains them; the list in your BORO Settings can differ by plan. At the time of writing they are:
| Skill (as shown) | What it covers |
|---|---|
| Структура на оферта (Offer structure) | Building an offer BoQ from scratch: categories by part of the building and type of work, positions with quantities and units. |
| Ценообразуване на оферта (Offer pricing) | Pricing positions with template history or from scratch, resource analyses and profit, asking you where a decision is needed. |
| КСС конвенции (BoQ conventions) | Naming and structure conventions for BoQs in the company: versions, BoQ types, currencies. |
| Изчистване на дублирани шаблони (Clean up duplicate templates) | Finding and merging duplicate task templates without losing price history. |
| Абонамент и кредити (Subscription and credits) | Questions about the plan, BORO credits and invoices. |
| Файлов мениджър (File manager) | Finding, reading, creating and editing files, uploading and migrating whole folders, comments, sharing, copying. |
| Строителен график (Construction schedule) | Reviewing the Gantt, dependencies and coverage, reporting progress, changing dates. |
| Обвързване на КСС с график (Linking the BoQ to the schedule) | Matching BoQ positions to the activities of an imported schedule: review by confidence, apply, handle leftovers. |
| Изграждане на график (Building a schedule) | Creating a schedule and its categories, groups, milestones and dependencies. |
| Договори (Contracts) | Contracts of a project: review, drafts, proposals, signing, change orders and history. |
| Актове за плащане (Payment applications) | Reviewing payment applications on the project's contracts: status, amounts, periods. |
| Попълване на акт по документ (Fill a payment application from a document) | Filling the quantities of a draft payment application from a protocol, Excel, PDF or photo you attach. The result is always a draft for you to check. |
| Изходящи запитвания за оферти (Outgoing offer requests) | Creating and sending offer requests, comparing and awarding offers, and the contracting schedule. |
| Входящи запитвания за оферти (Incoming offer requests) | Handling a received offer request end to end: review, accept or decline, price, submit. |
| Бюджет и финанси (Budget and finance) | Budget against executed work, cost breakdown, approved payments. |
| Работен календар (Work calendar) | Working days and holidays of a project. |
| Създаване на умения (Creating skills) | Turning work you repeat into a new skill (as a draft). |
Built-in skill names are shown in Bulgarian. You do not need to call a skill by name; describe the work and BORO picks the skill.
Your company's own skills
Write your own skill when your company does a job in a specific way that BORO should follow every time, for example: "How we prepare an offer for a residential building", "Checks before we approve a subcontractor's payment application", "How we name BoQ categories". Own skills appear in the same list without the Built-in badge, with the buttons Disable/Enable (Изключи/Включи), Edit (Редактирай) and a bin to delete. You see these buttons and Add skill (Добави умение) only if your company role has BORO Skills (author) (BORO умения (автор)) at Edit.
How to add a skill
- Open the BORO panel, click Settings (gear), then Skills (Умения). The page says "Procedural knowledge BORO loads on demand — how your company works."
- Click Add skill (Добави умение).
- Fill in Name (Име), Short description — when it is used (Кратко описание — кога се използва) and Instructions (Инструкции).
- Click Save (Запази). The skill is created switched on, and BORO can use it from the next message.
| Field | Required | Rules |
|---|---|---|
| Name | Yes | 2 to 120 characters. Must differ from every built-in skill and from your other skills. |
| Short description — when it is used | Yes | 5 to 300 characters. Say when BORO should use the skill; BORO matches your requests against it. |
| Instructions | Yes | 10 to 20,000 characters. Short, ordered steps in the imperative. |
| Number of skills | At most 50 own skills per company. |
- Skills in the left menu of BORO Settings.
- A built-in skill with the badge Built-in.
- A company skill (here "Pricing check") with Disable, Edit and the bin.
- Add skill opens the form with Name, Short description — when it is used and Instructions.
How to edit, switch off or delete a skill
- Edit (Редактирай) opens the same form with the current text; change it and click Save.
- Disable (Изключи) keeps the skill but BORO stops using it; Enable (Включи) turns it back on.
- The bin deletes the skill at once, without a further question. It cannot be restored.
- You can also ask BORO, for example "Switch on the skill Pricing check", "Rewrite step 3 of Pricing check" or "Delete the skill Old offer checks". BORO shows an approval card first and changes nothing until you click Approve (Одобри). Built-in skills cannot be changed this way either.
Editing, Disable/Enable and the bin need BORO Skills (author) (BORO умения (автор)) at Edit, just like adding a skill. If saving or switching fails, the page shows the reason under the list, for example "A skill named "…" already exists." or the length rule that was broken, or Failed to save skill (Неуспешно запазване на умението). If deleting fails, it shows the reason or Failed to delete skill (Неуспешно изтриване на умението). If your permission was removed while the page was open, the page shows "Your company role needs «BORO Skills (author)» (Edit). Ask your administrator to add it to the role." and nothing is changed.
The list on the Skills page updates by itself when a skill is added, changed, switched on or off, or deleted by BORO, by a connected AI tool or by a colleague. You do not need to reload the page.
How to let BORO write a skill for you
- After BORO has done a job well, ask: "Save this as a skill" or "Turn this procedure into a skill".
- BORO proposes the name, description and instructions and shows an approval card. Approve it.
- The skill is created switched off as a draft. Open BORO Settings → Skills, check it, edit it if needed, and click Enable. You can also ask BORO to switch it on; it shows an approval card first.
BORO can create a skill only for someone with the permission BORO Skills (author); otherwise it tells you that the permission is missing.
Common questions
Why does saving a new skill fail?
If a field shows "Too short: at least {min} characters" (Твърде кратко: поне {min} знака), lengthen that field: the name needs 2 to 120 characters, the short description 5 to 300 and the instructions 10 to 20,000. If you see Failed to save skill (Неуспешно запазване на умението), the name may already be used by a built-in skill or another of your skills, or your company already has 50 skills. If the page says "Your company role needs «BORO Skills (author)» (Edit). Ask your administrator to add it to the role.", you lack the permission: creating skills needs BORO Skills (author) at Edit in your company role. Company owners and Managers have it by default. Ask your administrator; see Roles.
Why can't I see Add skill, Edit, Disable or the bin on the Skills page?
Your company role does not have the permission BORO Skills (author) (BORO умения (автор)) at Edit. It is needed to add, edit, switch on or off and delete your company's own skills, and the Skills page of BORO Settings then shows the list read-only with the line "Your company role needs «BORO Skills (author)» (Edit). Ask your administrator to add it to the role." You can still see every skill, and BORO still uses the switched-on ones when you chat. Company owners and Managers have the permission by default; an administrator can add it to your role on the Roles page.
Can I change a built-in skill?
No. Built-in skills cannot be edited, switched off or deleted. Write your own skill for your company's variant; BORO then follows your instructions where they apply.
How do I know BORO used my skill?
A row "Using skill: {name}" appears in the conversation. If BORO does not pick it up, make the Short description more specific to the requests you type, or ask BORO directly to use the skill by name.
Who sees our company's skills?
Everyone in your company, and BORO uses the switched-on ones for everyone in the company. Only members with BORO Skills (author) at Edit can change them. Other companies never see them.
BORO created a skill but it does nothing.
Skills that BORO writes are created switched off. Open BORO Settings → Skills and click Enable, or ask BORO to switch it on and approve the card. Switching a skill on needs BORO Skills (author) at Edit; without it the skill shows Disabled (Изключено) and no Enable button, so ask someone who has the permission.
Can Claude, ChatGPT or another connected AI tool use our skills?
Yes. An AI tool connected to BuildColab through MCP sees the same skills BORO does, the built-in skills available on your plan and your company's switched-on skills. It loads the matching skill before doing that kind of work, and this works with read-only access too. Switched-off skills are not offered to it. If your company has MCP write access and you have BORO Skills (author) at Edit, the tool can also create, edit, switch on or off and delete your company's skills, at once and without an approval card; before deleting a skill (delete_skill) the tool is told to ask you first. See Connecting Claude, ChatGPT and others (MCP).
Why do I see fewer built-in skills than a colleague in another company?
The set of built-in skills depends on the plan. See Subscription, plans and billing.