Company library (nomenclatures)
On this page
| Where | Company sidebar → Nomenclatures (Номенклатури): /companies/{company}/nomenclatures. Also used from the template picker and the resource search in the BoQ and the resource analysis. |
|---|---|
| Who can | Nomenclature (Номенклатура) at View to browse; at Edit to create, edit, delete and merge. Paid plans only. |
| Related | Resource analysis, Task templates and price history, Working in the BoQ editor |
What the company library is for
A nomenclature is a saved item you use again and again. Keeping them in one library gives you:
- Faster pricing. In a resource analysis you pick ready items instead of typing them. For a work item (task template), you can reuse an earlier analysis of the same work and see its price history across projects.
- Consistent names. Everyone in the company uses the same name and unit for the same item, which makes BoQs comparable.
- Easier search and comparison. Items are found by name and by meaning, in the library, in the BoQ and by BORO.
| Tab | Bulgarian | What it holds | Unit |
|---|---|---|---|
| Work items | СМР | Task templates: types of construction and installation work. Each template collects the price history of every BoQ position it is assigned to. | Chosen by you |
| Materials | Материали | Materials used in resource analyses. A material in an analysis must come from the library. | Chosen by you |
| Labour | Труд | Labour categories (trades). | Always man-hours, m.h. (ч.ч.) |
| Machinery | Механизация | Machines and equipment. | Always machine-days, m.d. (м.д.) |
Services are entered directly in each resource analysis and are not part of the library.
The Nomenclatures page
Open Nomenclatures (Номенклатури) in the company sidebar. The header shows the title and the badge BuildColab Official. The toolbar has the tabs, the search field, Clear duplicates (on the Work items tab) and Create.
OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.
Figure: The Nomenclatures page, Work items tab.
- The tabs Work items, Materials, Labour and Machinery switch the list.
- The search field filters the active tab by name.
- Clear duplicates finds and merges near-identical task templates.
- Create adds an item to the active tab.
- The pencil in the Actions column opens the item for editing.
| Column | Bulgarian label | Content |
|---|---|---|
| Name | Име | The item name. |
| Unit of measure | Мерна единица | The unit's full name in your language, or your own unit text. Labour always shows m.h. and machinery m.d. |
| Created on | Създадена на | Date and time the item was created. |
| Actions | Действия | Pencil Edit (Редактирай), which opens the edit panel. |
The newest items are at the top. The list loads 100 items at a time as you scroll. The search "Search by nomenclature name" (Търси по име на номенклатура) applies to the active tab, and the text stays when you switch tabs; the cross clears it. When nothing matches, the page says "No nomenclatures found" (Няма намерени номенклатури). There is no import, export or bulk selection on this page.
How to create an item
- Select the tab for the kind of item: Work items, Materials, Labour or Machinery.
- Click Create (Създай). The dialog Create nomenclature (Създай номенклатура) opens.
- Type the name in Nomenclature name (Номенклатура име).
- For work items and materials, choose the Unit of measure (Мерна единица): click the field, type to search, and pick a unit. For labour and machinery the unit is fixed and cannot be changed.
- Click Create. A toast confirms it, for example "The task template was created successfully" or "Material created successfully".
- Nomenclature name is required.
- The unit search box searches standard units and your company's own units.
- + Add "{text}" as a new unit of measure creates your own unit from the typed text. Once the required fields are filled, Create at the bottom of the dialog saves the item.
You can also create library items without leaving the BoQ: when you search for a template, material, labour or machine in a resource analysis and it does not exist, choose to create it. The same dialog opens with the name you typed, and the new item is selected in the analysis afterwards. This also needs Nomenclature at Edit.
How to edit an item
- Click the pencil in the item's row. The panel Edit (Редакция) opens on the right; the list stays visible next to it.
- Change Nomenclature name and, for work items and materials, Unit of measure. Created on is read-only; labour and machinery units cannot be changed.
- Click Save (Запази). A toast confirms it, for example "Resource edited successfully". Cancel (Отказ) closes without saving.
Resource analyses refer to the library item, so a renamed material, labour or machinery item shows its new name in every analysis that uses it.
- Nomenclature name can be changed.
- Unit of measure can be changed for work items and materials.
- Save stores the changes.
- Remove nomenclature deletes the item after a confirmation.
How to delete an item
- Open the item with the pencil and click Remove nomenclature (Премахни номенклатура).
- Read the confirmation "Are you sure you want to remove "{name}"? This action is irreversible and will remove the item from the system."
- Click Remove nomenclature to confirm, or Cancel.
| Kind | What deleting does |
|---|---|
| Material | The material disappears from the library and the pickers. Resource analyses that already use it keep it. |
| Work item (task template) | The template is deleted permanently together with its price history. |
| Labour | Deleted permanently. |
| Machinery | Deleted permanently. |
How to clear duplicate task templates
Over time the same work often ends up in the library under slightly different names. Clear duplicates (Изчисти дубликати) finds templates that mean almost the same thing and merges them, moving their price history into the one you keep.
- On the Work items tab, click Clear duplicates. The dialog Duplicate task templates (Дублирани шаблони на задачи) opens with groups of near-identical templates. Each group shows "{percent}% match".
- In a group, choose with the radio button which template stays. Each template shows "Used {count} times"; the chosen one is marked "· kept". The first template is chosen by default.
- Click Merge into selected (Слей в избрания). The other templates in the group are merged into the kept one together with their history, then deleted. The toast "Templates merged successfully" confirms it.
- Repeat for other groups, then click Close (Затвори).
How to check that it is the right item
Similar names are easy to mix up, for example "Concrete C25/30" and "Concrete C25/30 B3". Every library item therefore shows its track record wherever it appears: on this page, in the resource analysis and in the search lists.
- On this page, the columns Last price and Used in show each item's latest price in a resource analysis and how many analyses and projects use it.
- Materials, labour, machinery and task templates are shown as a chip: an icon for the kind, the name, the unit and, for labour and machinery, the code.
- Hover over a chip to see its Last price and where it is Used in (analyses, projects and templates).
- Click the (i) button on the chip to open its details. On this page they open in a panel on the right, next to the list. Everywhere else (the resource analysis, the search lists, the BoQ) they open in a dialog over the page. In a resource analysis a click on the name still opens the row for editing, as before; only the (i) button opens the details.
- In the search lists of the resource analysis and of Add work item, each result shows a line such as "Last 118.00 € · 14 Sep 2026 · used 38× in 7 projects", or "Not used in an analysis yet". The (i) button next to a result opens its details without choosing it.
The details panel shows:
- The kind, the unit and code, who added it and when, and when it was last edited. A deleted item that older analyses still use is marked Archived.
- Last price, Median, 12 months, Range, 12 months and Used in.
- Price over time: a chart of the item's prices by date, with the price scale, the first and last dates and the latest price. Hover over the chart to see the date, price, project and BoQ of the nearest price. Only prices in the latest price's currency are drawn.
- Price history: every resource analysis that priced the item, newest first, with the project, BoQ, version and task. Type in "Search project, BoQ or task" to find a price. Load more shows older prices.
- Where used: the projects and BoQs that use it, and for materials, labour and machinery the task templates whose analyses contain it.
You can follow the chain from one item to the next:
- Project and BoQ names are links: click one to go to that project or BoQ. The details close.
- Open analysis under a price shows that resource analysis, read-only, in the same place. Its materials, labour and machinery are chips too, so their (i) button opens their own details.
- A task template under Where used opens that template's details when you click its (i) button.
- Back at the top returns to the previous step.
Prices are those entered in resource analyses (the unit price for a material, the hourly rate for labour, the daily rate for machinery, the unit price of the work for a task template). One entry is shown per analysis, from its latest BoQ version.
Access and plans
| Situation | What you see |
|---|---|
| Your company's plan does not include nomenclatures (Free plan, or no license) | "This feature is in a higher plan" with Browse plans. The template picker and template suggestions in the BoQ are also unavailable. |
| Your role lacks Nomenclature | "You don't have access to this section". Ask an administrator for the permission. |
| You have Nomenclature at View only | You can browse; Create, the pencil and Clear duplicates show "Your company role needs «Nomenclature» (Edit). Ask your administrator to add it to the role." |
| You opened a link to another company's library | "Access denied". Each company sees only its own library. |
The pickers in the BoQ and the resource analysis show the same reason as the page instead of an empty list. Changes made by colleagues or by BORO appear on the open page automatically. BORO can search, create, update and delete library items and find and merge duplicate templates for you. In the BORO panel each of these actions waits for your approval on an approval card by default.
Common questions
Why can't I change the unit for labour or machinery?
Labour is always counted in man-hours (m.h. / ч.ч.) and machinery in machine-days (m.d. / м.д.), so their unit is fixed.
Creating an item shows "This name already exists in the company". What now?
An item of the same kind with the same name already exists. Search for it and use it, or choose a more specific name.
The unit I need is not in the list. How do I add it?
Type it in the unit search box and click + Add "{text}" as a new unit of measure. It is created and selected at once (up to 50 characters).
If I rename a material, do my existing analyses change?
Yes. Analyses refer to the library item, so they show the new name.
What happens to analyses when I delete a material?
Analyses that already use it keep it; it simply can no longer be picked for new analyses.
Where are the prices of materials and labour?
Prices are entered in each resource analysis; the library item keeps no price of its own. To see the prices an item has had, open its details with the (i) button: Price history lists every analysis that priced it, and the page shows Last price for every item. A task template also shows its history inside the resource analysis. See Task templates and price history.
Why is the Clear duplicates button missing?
It is shown only on the Work items tab. Duplicates are found for task templates only.