Permission reference

On this page
  1. Permissions, levels and scopes
  2. How company role and project access work together
  3. How missing access shows in the app
  4. Default roles at a glance
  5. Every permission in detail
  6. Features without a permission
  7. Common questions
  8. Related
WhereCompany level: Admin (Админ) → Roles (Роли), /companies/{company}/admin/roles. Project level: project sidebar → Project participants (Участници в проекта) → member → Access level (Достъпност), /projects/{project}/company/{company}/project-team
Who canChanging roles: Members (Членове) at Edit. Changing project access: Projects (Проекти) at Edit. Reading this page: anyone.
RelatedRoles, Project team and access, Subscription, plans and billing

Permissions, levels and scopes

A permission answers the question "can this person open this part of BuildColab, and may they only look or also change things?". Each permission has two levels; Reports (Отчети) has a third one, Full access:

LevelBulgarianWhat it allows
ViewПрегледOpen the section and read its data, export and download where offered. Buttons that change data either are disabled or show a message naming the permission you lack, for example "Your company role needs «Nomenclature» (Edit). Ask your administrator to add it to the role."
EditРедакцияEverything in View, plus create, change and delete in that section.
Full accessПълен достъпOnly on the Reports (Отчети) row. Everything in Edit, plus managing payment applications and progress reports for the whole company: set folder responsibles on the main BoQ, create and edit reports regardless of the folder responsibles, change a report's assignee, and accept or return progress reports. See the Reports entry below.
No accessНяма достъпThe sidebar entry stays visible with a padlock; opening it shows "You don't have access to this section".

Permissions exist at two scopes, using the same list of permissions:

  • Company level is the member's role, set on the Roles screen. It applies across the whole company: company pages such as Nomenclatures, Partners, Requests, Report Register and Admin, and what the server lets the person save anywhere in the company.
  • Project level is the member's access in one project, set in that project's Project participants → Access level (Достъпност). It decides which project sidebar entries, screens and buttons the person sees in that project. Each project can be different.

Above both sits the company's plan. A permission the plan does not include does not work for anyone, whatever the role or project access says. A member without an active licence on a paid plan falls back to the Free plan's set. See Subscription, plans and billing.

The document permissions Budget preparation (Изготвяне на бюджет), Offers (Оферти), Outgoing bid requests (Изходящи запитвания), Execution (Изпълнение), Contract changes (Промени по договор) and Reports (Отчети) also decide what you can open and change in a bill of quantities (BoQ), including through BORO and the API, not only which tabs you see. Each document needs its own permission: a budget and a budget draft need Budget preparation, an offer Offers, the BoQ of an offer request Outgoing bid requests, a signed contract (a contractor's Contract with client (Договор с възложител) included) Execution, a change order Contract changes and the working copy of a payment application Reports. Opening a BoQ or copying positions from it needs View; changing it, importing into it, creating it and deleting it need Edit. Accepting a budget draft needs Budget preparation and Execution, and creating a budget draft on the Drafts (Чернови) page also needs Offers at Edit. The Financial dashboard (Финансово табло) reads the budget, so it also needs Budget preparation, and setting a unit price through BORO needs Resource analysis (Ресурсен анализ) as well as the document's permission. BORO's answers about costs, contracts, change orders, payment applications, offers and the schedule's money follow the same permissions in the project; see What BORO can do. The permissions are checked on your access in the project, and a permission your plan does not include is not available. A member of the company that created the project who is not on the project's team holds none of them there; opening such a document can show "You are not on this project's team. Ask your administrator to add you." (Не си в екипа на този проект. Помоли администратора си да те добави.). Lists of documents leave out the ones you have no permission for. Without the permission a BoQ opens on "You don't have access to this type of document" (Нямаш достъп до този вид документ).

How company role and project access work together

These rules decide what a member can actually do inside a project:

  1. Project access is copied from the role when the member is added to the project. At that moment BuildColab copies each permission and level of the member's role into their access for that project.
  2. The copy is updated only when you choose to. When you save a role edit with Also apply these changes on their projects (Приложи промените и в проектите им) ticked, which is the default, the permissions you changed in that edit are applied on every project of the people who hold the role; their other project permissions keep their levels. When you give a member a different role with Reset their project permissions to the new role (Върни правата в проектите към новата роля) ticked, also the default, their access in every project is replaced with the new role's. Reset project permissions to role (Върни правата в проектите към ролята) in the member's Projects (Проекти) dialog on Employees does the same at any time. With the checkboxes unticked, existing projects keep the old copy. Projects people join afterwards always get a copy of their current role. Memberships through a participating organization follow the role that organization was given, not your company role. See Roles and Members, invitations and licences.
  3. The person who creates a project gets every permission at Edit in that project, regardless of their role.
  4. Project access can be changed per member and per project in Project participants → Access level, without touching the role or other projects. The company owner's project access cannot be edited; the owner always has full access, and a member who becomes owner by transfer gets Edit on all company projects.
  5. In practice you need the permission at both levels, and the lower level wins. The project access decides what you see in the project; the company role decides what the server accepts when you save. If your project access says Edit but your role says View, you see the edit buttons but saving is refused with an access error. If your role says Edit but your project access says No access, the entry is locked in that project.
  6. Project access can only narrow what the company role allows; it never adds to it. Giving a member a higher level in Project participants than their company role has does nothing. This matters most for Reports (Отчети), Progress reports (Работни карти), Contract finance (Финанси по договори), Confirm certificates (contract finance) (Утвърждаване на сертификати (финанси по договори)), Execution (Изпълнение) and Contract changes (Промени по договор): the server decides them on the company role, so a member needs them in the role. In the member's Access level (Достъпност) panel, a row set higher than the role says so under it: "The company role grants no more than "View", so the higher level here has no effect." or, when the role does not have the permission at all, "The company role doesn't grant this permission, so it has no effect here." To make the level count, raise the permission in the role on Roles (Роли).
  7. Company-only permissions (Members, Received bid requests, Partners, BORO Skills (author)) act only through the role. The project access panel may list them, but setting them there changes nothing.
  8. The Property sales permissions (Property sales and the others listed under "Every permission in detail") are company-only as well: they act only through the role, and a member's access in a project neither grants nor limits them. The module's project pages also need the member to be on that project's team, unless their role has Property sales: management, Payments register or Property sales: legal (at least View), which open every project of the company.
The Access level panel of a project member with a View, Edit or No access pill per feature

OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.

Figure: A member's access in one project (here the company owner, who always has Edit; e-mail blurred).

  1. The panel title Access level and the member's read-only name, e-mail and Role.
  2. The Features column lists each permission.
  3. The Access column shows Edit, View or No access for this project. For any member other than the company owner, an Edit button at the bottom of the panel switches it to edit mode.

How to change a member's access in one project

  1. Open the project and click Project participants (Участници в проекта) in the project sidebar.
  2. Click the member. The Access level (Достъпност) panel opens.
  3. Click Edit (Редактирай) at the bottom of the panel. Each row turns into a switch with None (Няма), View (Преглед) and Edit (Редакция). The Reports (Отчети) row has a fourth option, Full access (Пълен достъп), when your plan includes it.
  4. Set the levels you need and click Done (Готово) to save. At least one permission must stay above None ("Give access to at least one feature.").

Changing project access needs the Projects (Проекти) permission at Edit, both in your role and in your access for that project. More about the project team is in Project team and access.

Permissions of a participating organization's people

The permissions the host gives an organization are the most its people can have on the project. The organization's managers set each person's permissions within them. If the host removes a permission, everyone in the organization loses it at once. People the host shared the project with directly are managed by the host.

How a participating organization sets its people's permissions on a shared project:

  1. On your company's Projects page, choose the Shared with us (Споделени с нас) filter and open the shared project's card.
  2. Choose the Permissions (Права) tab. It lists your colleagues on the project, each with their permissions. Only permissions the host gave your organization are listed. A permission the host's plan does not include shows "Not on the host's plan" (Не е в плана на домакина) and cannot be given.
  3. Click Edit (Редактирай) next to a colleague. Each row turns into a switch with None (Няма), View (Преглед) and, where the host gave Edit, Edit (Редакция).
  4. Click Save (Запази), or Cancel (Отказ) to leave the permissions as they were.

The tab is for your company's members with Projects (Проекти) at Edit, including those who work on that project themselves. On an archived project the permissions cannot be changed. Everyone on the project keeps viewing it; that cannot be removed. A colleague the host shared the project with directly shows "Managed by {host}" and cannot be edited here. Saving a permission the host has just removed is refused with "Not available to your organization on this project: …". See Sharing a project with external participants and organizations.

How missing access shows in the app

SituationWhat you see (EN)What you see (BG)What to do
Your role or project access lacks the permissionPadlock on the sidebar entry; page "Restricted access — You don't have access to this section" with Back„Ограничен достъп — Нямаш достъп до този раздел" с НазадAsk an administrator for the permission.
The plan does not include the permission (shown first when both apply)Padlock; page "Premium feature — This feature is in a higher plan" with Browse plans„Премиум функция — Тази функция е в по-висок план" с Разгледай плановеChoose a paid plan, get a licence, or pay the overdue invoice.
You clicked a button that needs Edit while you have ViewPop-up naming the permission and level, for example "You need «Projects» (Edit) in this project. Ask your administrator."„Трябва ти достъп до «Проекти» (Редакция) в този проект. Обърни се към администратора си."Ask for Edit.
A page, list or panel cannot load because your company role lacks the permission (for example the payment application register, the contract finance card or the certificates list)A notice "You don't have access to this section" that names the permission and level, for example "Your company role needs «Reports» (View). Ask your administrator to add it to the role." When your plan does not include the permission: "Your plan doesn't include «Contract finance»." with Browse plans„Нямаш достъп до този раздел" с изречение, което назовава правото и нивото, например „Ролята ви в компанията трябва да дава «Отчети» (Преглед). Помолете администратора да го добави към ролята." Когато планът не включва правото: „Планът ти не включва «Финанси по договори»." с Разгледай плановеAsk an administrator to add the permission to your company role. Giving it to you only in Project participants does not help. For the plan, choose a paid plan.
Company owner, paid plan restricted by an unpaid invoice"Access to this feature is limited by a billing issue with your company's plan…" with View invoice„Достъпът до тази функционалност е ограничен поради проблем с плащането на плана на компанията…" с Виж фактуратаPay the invoice.
Company owner, paid plan ended in the last 30 days"Your paid plan has ended and your company is now on the Free plan…" with Reactivate plan„Платеният ви план приключи и компанията ви вече е на безплатния план…" с Активирайте планChoose a plan again.
You are not in the project's team"No invitation — This project hasn't been shared with you"„Няма покана — Този проект не е споделен с теб"Ask to be added to the project team.

The Request access (Поискай достъп) button on these pages is marked "Coming soon" and does nothing yet; contact your administrator directly.

Default roles at a glance

F = Full access, E = Edit, V = View, — = not included. "Free plan" shows whether the permission works on the Free plan. Each company has its own copy of these roles, so check your actual roles on the Roles screen.

Permission (EN / BG)Company ownerManagerProject supervisorTechnical supervisorOfferorAccountantFree plan
Members / ЧленовеEEVVVVYes
Outgoing bid requests / Изходящи запитванияEEEVE—No
Received bid requests / Получени запитванияEEE—E—Yes
Offers / ОфертиEEEVE—Yes
Nomenclature / НоменклатураEEEVE—No
Resource analysis / Ресурсен анализEEEVE—No
File manager / Файлов мениджърEEEEEEV (read-only)
Projects / ПроектиEEEVEVYes
Partners / ПартньориEEEVEVNo
Execution / ИзпълнениеEEEE—VNo
Contract changes / Промени по договорEEEVV—No
Budget preparation / Изготвяне на бюджетEEEVV—No
Reports / ОтчетиFFFE—VNo
Progress reports / Работни картиEEEE——No
Financial dashboard / Финансово таблоEEE———No
Schedule / ГрафикEEEEV—No
Contracting schedule / График на договарянеEE————No
BORO Skills (author) / BORO умения (автор)EE————Yes
Project sharing outside the organization / Споделяне на проекта извън организациятаEEE———No
Contract finance / Финанси по договориEEE——ENo
Confirm certificates (contract finance) / Утвърждаване на сертификати (финанси по договори)EEE———No

Property sales permissions in the default roles. The permissions of the Property sales module are not in the table above. The role editor offers them only when your company uses the module, that is when BuildColab has activated it for at least one of your projects. Every paid plan includes them; the Free plan does not. Companies that existed before the module got the same grants on the roles that still carry their default names.

Permission (EN / BG)Company ownerManagerProject supervisorTechnical supervisorOfferorFree plan
Property sales / Продажби на имотиEEVV—No
Property sales: management / Продажби на имоти: управлениеEE———No
Property sales: setup / Продажби на имоти: настройкаEE———No
Property sales: legal / Продажби на имоти: правниEE———No
Payments register / Регистър на плащаниятаEE———No
Construction events / Строителни събитияEEEE—No
Property sales: export / Продажби на имоти: експортEE———No

Every other default role has none of them, and none of them can be given to external participants. When BuildColab activates the module it can also create, on your request, six suggested sales roles with Bulgarian names: «Търговец» (sales agent), «Директор продажби» (sales director), «Администрация продажби» (sales administration), «Юрист (продажби)» (sales lawyer), «Финанси (продажби)» (sales finance) and «Строителни събития» (construction events). See Roles and Sales settings, legal entities and permissions.

Property sales: handover and warranty (Продажби на имоти: предаване и гаранции) is held at Edit by the Company owner, Manager, Project supervisor and Technical supervisor roles, and by no other default role. The Free plan does not include it.

Schedule in companies created before the default roles were updated in September 2026. The default roles of these companies used to have Schedule (График) only for the Company owner, so other people could not open Construction schedule (Строителен график). They now have it as in the table: Edit for Manager, Technical supervisor and Project supervisor, View for Offeror. The people who hold these roles get the same level in the projects they already belong to. A role that already had Schedule at some level keeps that level. A role without Schedule gets it, even if an administrator had left it out on purpose: if you do not want a role to have it, lower or remove Schedule on the Roles screen.

The Roles screen showing the Features and access list of the Technical supervisor role

OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.

Figure: The permissions of a role on the Roles screen.

  1. The selected role in the role list.
  2. Features and access lists only the permissions the role has, each with an Edit or View pill.

Every permission in detail

Each entry below names the permission exactly as in the role editor, in English and Bulgarian.

Members (Членове)

Applies atCompany only
View allowsOpen Admin → Employees, Roles and Sent invitations; see the members list and the Subscription and payments card on Organization; see the invoice list and the company invoice details (name, VAT and registration number, billing address) on Subscription. View also lets BuildColab load the person's own permissions, so every role should keep it.
Edit allowsInvite members, resend invitations, change a member's role, remove members, create, edit and delete roles (and apply a role edit on the holders' projects), open a member's Projects (Проекти) dialog, buy and assign licences, enter or change the company invoice details, change the plan and place an order at checkout, buy credit packs and storage add-ons.
Without itEmployees, Roles and Sent invitations are locked; the Members card on Organization is empty. Top up credits, Buy credits and Expand storage show "Your company role needs «Members» (Edit). Ask your administrator to add it to the role." instead of the purchase dialog. Without even View, the person's permissions cannot load and most of the app appears locked.
Default rolesCompany owner E, Manager E, Project supervisor V, Technical supervisor V, Offeror V
Free planIncluded

Buying credits and extra storage requires the Members permission with Edit access. Editing the company profile and transferring ownership are reserved for the company owner, whatever the role says. See Members, invitations and licences.

Project sharing outside the organization (Споделяне на проекта извън организацията)

LevelCompany only
Edit allowsSharing a project with external participants and participating organizations, changing their roles and permissions, resending and cancelling shares, and removing their access. The project permission Projects at Edit is needed too.
Without itThe lists on Project participants are visible, but the "Share project with…" and "Remove…" buttons are not shown.
Default rolesOwner E, Manager E, Project supervisor E
Free planNot included (sharing needs a paid plan or a trial)

External participants and participating organizations never get this permission, so they cannot share the project further. See Sharing a project with external participants and organizations.

Outgoing bid requests (Изходящи запитвания)

Applies atProject (screens and buttons) and company (server check)
View allowsOpen Outgoing bid requests in the project sidebar, see the offer requests the company sent, the offers received, the offer comparison and the award view.
Edit allowsCreate an offer request from the bill of quantities (BoQ) and send it to partners; change its name, note or deadline after sending; revise, withdraw and close it; choose offers and save the award. Launching an offer request from a contracting-schedule package also needs this permission at Edit.
Without itThe Outgoing bid requests entry is locked in the project and the BoQ's offer-request button shows the missing-permission message.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor V, Offeror E
Free planNot available on the Free plan, nor to a member without a seat (license) in a paid company outside a trial: the Free plan's limit disables it at company and project level, whatever the role grants. Free companies can still receive and answer offer requests (Received bid requests) and read the contracts, change orders and payment applications their general contractor shares with them.

See Creating and sending an offer request.

Received bid requests (Получени запитвания)

Applies atCompany only
View allowsOpen Requests (Запитвания) in the company sidebar (the page is titled Received requests) and read the offer requests other companies sent you. The sidebar badge counts requests still waiting for an answer.
Edit allowsRespond to a received request: prepare and submit your offer, or decline the request.
Without itThe Requests entry is locked; responding shows the missing-permission message.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor —, Offeror E
Free planIncluded

See Incoming offer requests (subcontractor side).

Offers (Оферти)

Applies atProject
View allowsOpen Offers in the project sidebar (projects where your company is the contractor), and read every offer and its BoQ.
Edit allowsCreate, rename and duplicate offers; edit the BoQ (add and remove positions and categories, change quantities and prices); import a BoQ from Excel; lock versions. Turning an offer or draft into a contract also needs Execution at Edit.
Without itThe Offers entry is locked; with View only, BoQ editing actions show the missing-permission message.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor V, Offeror E
Free planIncluded

See Working in the BoQ editor.

Nomenclature (Номенклатура)

Applies atCompany (the company library)
View allowsOpen Nomenclatures in the company sidebar and browse task templates, materials, labour and machinery; use the template picker and the material, labour and machinery search in the BoQ and the resource analysis.
Edit allowsCreate, rename and delete nomenclature items, change units, run Clear duplicates on task templates, and create a new library item directly from a resource-analysis picker.
Without itNomenclatures is locked, and the template and resource pickers in the BoQ show the reason instead of results.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor V, Offeror E
Free planNot included (the BoQ's template picker and suggestions are also unavailable on Free)

See Company library (nomenclatures).

Resource analysis (Ресурсен анализ)

Applies atProject and company
View allowsSee the resource analysis of BoQ positions in the BoQ panel and in payment applications, and the resource summary.
Edit allowsBuild and change resource analyses (materials, labour, machinery, services, additional costs, profit), assign templates, copy and paste analyses, and import prices split by resource.
Without itThe resource-analysis panel and page are not available; actions show the missing-permission message.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor V, Offeror E
Free planNot included

See Resource analysis.

File manager (Файлов мениджър)

Applies atCompany (the company Files page) and project (each project's File manager)
View allowsBrowse folders, search, open and download files, see versions, read and post comments. Upload and folder buttons are visible but show the missing-permission message.
Edit allowsUpload, create folders and documents, rename, copy, move and delete, upload new versions and restore old ones, share with others, restore from trash or empty it, start 3D/CAD processing, manage company templates, and switch on automatic 3D/CAD processing on the Organization screen.
Without itThe Files entry (company) and File manager entry (project) are locked. The file picker in BoQ and payment-application imports is not available.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor E, Offeror E
Free planView only, on the company Files page and in each project's File manager: browse, open, preview and download. Uploading, new folders, renaming, moving, deleting and sharing need a paid plan.

See Folders, uploading and navigation.

Projects (Проекти)

Applies atCompany (project list) and project (project home and team)
View allowsSee the company's project list; open a project's Home (Начало) and Project participants (Участници в проекта).
Edit allowsCreate projects (Create project), edit project details, change the phase, archive projects and restore archived ones, add and remove project team members and change their project access. Together with Members at Edit: add a member to several projects at once and reset their project permissions to their role in the Projects dialog on Employees.
Without itNot possible: the permission is required for every role and for every member on their projects. In the role editor the Projects row is always there and cannot be deleted, and a member's project access offers no None (Няма) for Projects — only View or Edit. A role created without it gets View.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor V, Offeror E. For an external participant it is always View and not shown.
Free planIncluded

See Project list and creating a project.

Partners (Партньори)

Applies atCompany only
View allowsOpen Partners in the company sidebar, browse and search partners, and pick partners and self-managed subcontractors when you subcontract part of a BoQ.
Edit allowsAdd and edit partners, and create a self-managed (external) subcontractor from the offer-request or subcontract dialog.
Without itPartners is locked; opening a partner or adding one shows the missing-permission message.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor V, Offeror E
Free planNot included

See Partners.

Execution (Изпълнение)

Applies atProject and company
View allowsOpen Contract with client (Договор с възложител) and Contracts with contractors (Договори с изпълнители) in the project sidebar during execution, and read contracts, their versions and history.
Edit allowsTurn an offer or draft into a contract, accept a budget in whole or in part (together with Budget preparation at Edit), subcontract parts of a BoQ, edit contracts and sign self-contracts.
Without itThe contract entries are locked; the Turn into contract and accept actions are disabled with an explanation.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor E, Offeror —
Free planNot included

See Contracts: signing, details and history.

Contract changes (Промени по договор)

Applies atProject and company
View allowsOpen the change-order panel and change history from a contract's details and from the BoQ toolbar, and see what changed between contract versions.
Edit allowsCreate a change-order draft and finalize a change order for a self-managed contract (the server checks Edit when you save).
Without itThe change-order button shows the missing-permission message.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor V, Offeror V
Free planNot included

See Change orders and extensions.

Budget preparation (Изготвяне на бюджет)

Applies atCompany (creating investor projects) and project (drafts)
View allowsOpen Drafts (Чернови) in the project sidebar of an investor project in the budgeting phase and the budget drafts in it, Budget (Бюджет) during execution, and the budget cards on the project home.
Edit allowsAt company level: choose your company's role (for example Investor) when creating a project. Without it, the role step is skipped and new projects are created as contractor (offering) projects. At project level: work on the budget drafts. Accepting a budget into the investment budget needs this permission at Edit together with Execution at Edit.
Without itThe Drafts entry, and an investor's Budget entry, are locked.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor V, Offeror V
Free planNot included

See Investment budget.

Reports (Отчети) — payment applications

Applies atCompany (Report Register across all projects) and project (the project's register and each contract's payment applications)
View allowsOpen Report Register (Регистър на отчети) in the company and project sidebars, read payment applications and their history, download attachments and export registers and summaries.
Edit allowsCreate, fill in and submit payment applications; approve, counter or reject them; record external payment applications; attach files; import from Excel; add positions outside the contract. Once a folder of your company's main BoQ has a responsible (Отговорник на папка), Edit creates reports only for your own folders and edits only reports assigned to you.
Full access allowsEverything in Edit, plus: set and clear folder responsibles on the main BoQ; create reports for the whole contract or for chosen folders (New report for selected folders…) and edit any report, whoever is responsible; change a report's assignee; accept and return progress reports (Работни карти). In the role editor and in the project access panel it is the fourth option of the Reports row. Elsewhere it may be listed as Reports (full access) (Отчети (пълен достъп)).
Without itBoth Report Register entries are locked and payment-application actions in the BoQ and contract details show the missing-permission message. Without Full access, folder-responsible chips are read-only.
Default rolesCompany owner F, Manager F, Project supervisor F, Technical supervisor E, Offeror —. When Full access was introduced, existing roles still named Company owner, Manager or Project supervisor received it, both in the company and in their projects.
Free planNot included

Until a folder of the main BoQ gets a responsible, Edit and Full access behave the same. See How a payment application works and Creating and submitting.

Progress reports (Работни карти)

Applies atProject (the Progress reports entry) and company (server check)
View allowsOpen Progress reports (Работни карти) in the project sidebar during execution and read every progress report of the project.
Edit allowsCreate, fill in and submit progress reports, import their quantities from Excel, and start a new draft from a returned one. Folder responsibles limit it the same way as Reports at Edit. Accepting and returning progress reports needs Reports at Full access.
Without itThe Progress reports entry is locked.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor E, Offeror —. When it was introduced, existing roles still named Company owner, Manager, Project supervisor or Technical supervisor received it, both in the company and in their projects.
Free planNot included

It is separate from Reports so site staff can file progress reports without access to payment applications. See Progress reports.

Financial dashboard (Финансово табло)

Applies atProject
View allowsOpen Financial dashboard in the project sidebar during execution and see committed, certified and margin figures. The dashboard is read-only, so View is enough.
Edit allowsNothing beyond View.
Without itThe Financial dashboard entry is locked.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor —, Offeror —
Free planNot included

See Financial dashboard: committed, certified, margin.

Schedule (График)

Applies atProject (the Construction schedule entry, the schedule button in the BoQ, the working calendar, and a server check) and company (server check)
Per projectConstruction schedule access is also checked per project. A member whose project access sets Schedule to No access cannot open or edit that project's schedule, categorizations or working calendar, even if their role allows it. View on the project allows opening only; Edit allows changes. The company owner always keeps access. Without a project-level setting (a project the person is not a team member of), the role decides.
View allowsOpen Construction schedule (Строителен график) in the project sidebar during execution; see the Gantt chart, versions, reports and exports; open the schedule from the BoQ toolbar.
Edit allowsCreate a schedule, edit its structure, dates and dependencies, link it to the BoQ, report progress, lock and publish versions, and change the working calendar.
Without itThe Construction schedule entry is locked, the BoQ's schedule button shows the missing-permission message, and opening the schedule or the working calendar by link shows "You don't have access to this section".
External participantsAn external participant with Schedule always opens the schedule. Without the permission for the schedule's list (Budget preparation for the budget, Offers for an offer, Execution for a contract) it shows no prices, and the pricing and unified reports and their export are not available. The permissions matrix notes "Without the permission for the schedule's list («Budget preparation» for a budget, «Offers» for an offer, «Execution» for a contract), «Schedule» opens without prices, and its pricing reports are not available."
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor E, Offeror V. This also applies in companies created before the default roles were updated in September 2026; see "Default roles at a glance".
Free planNot included

See Schedule.

Contracting schedule (График на договаряне)

Applies atProject (the Contracting schedule entry, only in projects your company owns) and company (default lead times on Organization)
View allowsSee the contracting plan, packages, deadlines and warnings, the default lead times, and download the Excel export.
Edit allowsCreate, generate from a category, change, archive, restore and delete packages; change the person responsible; attach and detach offer requests and contracts; apply or ignore changes coming from the schedule; save default lead times. Launching an offer request from a package also needs Outgoing bid requests at Edit.
Without itThe Contracting schedule entry is locked, its card on the project home is not shown, and the lead-times section on Organization is hidden. In projects where your company is a subcontractor or partner the module is not shown at all.
Default rolesCompany owner E, Manager E, Project supervisor —, Technical supervisor —, Offeror —
Free planNot included

See Contracting schedule and packages.

BORO Skills (author) (BORO умения (автор))

Applies atCompany only
View allowsThis permission is used at Edit level. Viewing the list of skills, and BORO using the switched-on skills, is open to every member without it.
Edit allowsCreate your company's own BORO skills, in BORO Settings → Skills (Умения) → Add skill (Добави умение) or by asking BORO to create one (BORO proposes it as an approval card and creates it switched off). Edit them (Edit, Редактирай), switch them off or on (Disable/Enable, Изключи/Включи) and delete them (the bin), on that page or by asking BORO (each change shows an approval card first).
Without itThe Skills page of BORO Settings is read-only: every skill is listed, a switched-off company skill shows Disabled (Изключено), and there is no Add skill, Edit, Disable/Enable or bin. The page says "Your company role needs «BORO Skills (author)» (Edit). Ask your administrator to add it to the role." Creating, editing, switching on or off and deleting a skill are refused, and BORO tells you the permission is missing if you ask it to create, change or delete a skill. You can still see and use every switched-on skill.
Default rolesCompany owner E, Manager E, Project supervisor —, Technical supervisor —, Offeror —
Free planIncluded

See Skills.

Contract finance (Финанси по договори)

Applies atCompany only. Contract finance works across every project of the company, so a member's access in a single project neither grants nor limits it.
View allowsOpen Contract finance in the company sidebar and the Finance (Финанси) panel of a contract; see the certificates, invoices, submitted invoices, payments, warranty deductions, reports and settings; download certificates and reports; see the Contract finance blocks of the financial dashboard (owed to us by the client, and owed to subcontractors). It also shows the numbers and approved totals of the payment applications the register certifies, without Reports (Отчети) in the project.
Edit allowsPrepare the inclusion of a contract; mark a difference, hand over a certificate to accounting and provide it to the subcontractor; register, allocate, edit and cancel invoices and payments; apply credit; confirm an advance payment; submit, withdraw, accept and return submitted invoices; set the financial terms of a draft contract.
Without itThe Contract finance entry is locked. The Finance button of a contract shows the missing-permission message, and the finance panel says "You do not have access to contract finance. Ask for the «Contract finance» permission." The Financial terms section of a draft contract is view only.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor —, Offeror —, Accountant E
Free planNot included (the same plans as the Financial dashboard)

Confirm certificates (contract finance) (Утвърждаване на сертификати (финанси по договори))

Applies atCompany only
LevelsEdit only: there is no View level. A role either has it or not.
Edit allowsConfirm certificates of acceptance and payment, one by one or in bulk; replace a certificate; approve the inclusion of a contract; pause and resume finance on a contract; accept an invoice difference; release a warranty deduction; record corrections, contract-ledger adjustments and an advance settlement certificate; change the finance settings and the default financial terms; void an external payment application whose certificate was handed over or provided.
Without itThese buttons are not shown, and the finance settings are view only. With the four-eyes principle on, even a holder cannot confirm a certificate they created or approve an inclusion they prepared.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor —, Offeror —, Accountant —
Free planNot included

See Contract finance: certificates, invoices and payments.

Property sales permissions: what they have in common

The seven permissions below belong to the Property sales module, which sells the apartments, shops and parking spaces of a project. The role editor offers them only when your company uses the module, that is when BuildColab has activated it for at least one project. All seven are company-only: they act through the role, a member's access in a single project neither grants nor limits them, and external participants cannot be given them. On a project's sales pages a member must also be on the project team ("You are not on the project team"), unless the role has Property sales: management, Payments register or Property sales: legal. A section of Sales (Продажби) that none of your permissions opens is hidden, not locked. Every paid plan includes them; the Free plan does not. Discount limits and the right to decide each kind of approval are set per role in the sales settings, not here; see Sales settings, legal entities and permissions.

Property sales (Продажби на имоти)

Applies atCompany only
View allowsOpen Sales (Продажби) in the company and project sidebars and the Property sales card on the project page; see the availability board, the property cards and the current list prices; see your own clients, opportunities, offers and deals (those you are responsible for or on whose deal team you are) and the client check (KYC) status of your deals. A hold of another sales agent shows its client hidden ("Another sales agent's client").
Edit allowsWork your own clients, opportunities, activities and viewings; place temporary holds; create a reservation and activate it as its owner; prepare offers with a discount up to your role's limit; prepare deals.
Without itThe Sales entries are locked and the project card is hidden. With Payments register, the company entry still opens on the buyer payments.
Default rolesCompany owner E, Manager E, Project supervisor V, Technical supervisor V, Offeror —
Free planNot included

Property sales: management (Продажби на имоти: управление)

Applies atCompany only. Opens every project of the company, without being on its team.
View allowsSee all clients, opportunities, offers and deals of the company, the management dashboards and the receivables. Read the sales settings.
Edit allowsChange the person responsible for a client or opportunity; decide approvals, when the role also has the approval authority for that kind of request; mark a property unavailable and return it to sale; publish price lists; decide what happens to an expired reservation; installment exceptions.
Without itYou see only your own records; approvals wait for someone who holds it.
Default rolesCompany owner E, Manager E, Project supervisor —, Technical supervisor —, Offeror —
Free planNot included

Property sales: setup (Продажби на имоти: настройка)

Applies atCompany only
View allowsNothing on its own: reading the module goes through Property sales.
Edit allowsThe property register (Register / Регистър), areas, links and files of properties; draft price lists; the inventory import (Import / Импорт); the sales settings and policies, the calendar and the branding of the PDF documents.
Without itThe Register and Import pages are hidden, and the sales settings are read-only or hidden.
Default rolesCompany owner E, Manager E, Project supervisor —, Technical supervisor —, Offeror —
Free planNot included
Applies atCompany only. Opens every project of the company, without being on its team.
View allowsThe documents, the terms register, the client check (KYC) and the consents of the deals on which you are the lawyer of the deal team (of every deal, together with Property sales: management at View); the list of deals that have no lawyer yet.
Edit allowsPrepare contracts, upload signed contracts, check the terms and approve contracts; client checks (KYC/AML), privacy (GDPR) requests and the title transfer; payment plans and due dates (also open to Payments register at Edit).
Without itContract work on a deal is not available to you.
Default rolesCompany owner E, Manager E, Project supervisor —, Technical supervisor —, Offeror —
Free planNot included

Payments register (Регистър на плащанията)

Applies atCompany only. Opens every project of the company, without being on its team.
View allowsThe register of buyer payments (Payments / Плащания) and the financial view of every deal. Without Property sales, the company Sales entry opens straight on the payments.
Edit allowsRecord, allocate and reverse buyer payments, record historical payments, and confirm payments (with the Payment confirmation authority; with the Four eyes setting on, the default, not a payment you recorded yourself); legal entities and bank accounts; payment plans and due dates; activate a reservation.
Without itThe Payments pages are hidden.
Default rolesCompany owner E, Manager E, Project supervisor —, Technical supervisor —, Offeror —
Free planNot included

Construction events (Строителни събития)

Applies atCompany only. Unlike the three permissions above, it does not open projects you are not on the team of.
View allowsThe register of construction events of the project (Construction events / Строителни събития).
Edit allowsRegister the evidence of an event (for example Act form 14 (Акт обр. 14) or Use permit (Разрешение за ползване)), confirm and correct events, and set the technical readiness of properties. No prices and no contracts. With the Four eyes (Четири очи) setting on (the default), the person who registered an event cannot confirm it.
Without itThe construction events are read-only or hidden.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor E, Offeror —
Free planNot included

Property sales: export (Продажби на имоти: експорт)

Applies atCompany only
View allowsExport to Excel and PDF, with the same rows you can see on screen. Every export is recorded in the history. The full export in the sales settings also needs Property sales: management.
Edit allowsNothing more than View.
Without itThe export buttons are not available.
Default rolesCompany owner E, Manager E, Project supervisor —, Technical supervisor —, Offeror —
Free planNot included

See Property sales.

Annexes, unit swaps, terminations and corrections. Property sales: legal at Edit also prepares annexes, unit swaps and terminations of deals. Payments register also opens the Reconciliation (Сверка) and Corrections (Корекции) pages, and at Edit records payment corrections and refunds, which another person approves. See Annexes, unit swaps and termination.

Property sales: handover and warranty (Продажби на имоти: предаване и гаранции)

Applies atCompany only
View allowsThe handovers of properties to buyers, on every sale of a project (without the client), and every warranty claim. On its own it opens a project's Sales (Продажби) on Handovers (Предаване). Property sales at View shows the handovers and warranty claims of the deals you can see.
Edit allowsRun the handover appointments and protocols, the remarks found at handover, and the warranty claims with the buyers' photos.
Default rolesCompany owner E, Manager E, Project supervisor E, Technical supervisor E, Offeror —
Free planNot included

See Handover and warranty claims.

Features without a permission

Some parts of BuildColab are not controlled by any permission in the role:

  • Work tasks (Работни задачи): access follows each board's sharing; there is no plan lock.
  • Meetings (Срещи): project meetings are open to the project team; company meetings to the company's members. There is no plan lock either; the menu entries are missing only where the module is not switched on in your environment.
  • Admin → Organization and Subscription: open to every member (individual cards and actions have their own rules).
  • BORO chat and the calendar: open to every member. BORO can only do what your own permissions allow; credits are shared by the company.

Editing the company profile and transferring ownership are reserved for the company owner and cannot be given to a role.

Common questions

I gave a colleague Reports in Project participants, but they still cannot open payment applications. Why?

Project access only narrows the company role; it never adds to it. Reports, Progress reports, Contract finance, Confirm certificates (contract finance), Execution and Contract changes are decided on the company role, so a level set only in Project participants has no effect. The page says which permission and level the role is missing, for example "Your company role needs «Reports» (View). Ask your administrator to add it to the role.", and the Access level panel marks the row with "The company role grants no more than …". Add the permission to their role on Admin → Roles.

My colleagues could not open the Construction schedule, and now they can. Why?

In companies created before the default roles were updated in September 2026 the default roles had Schedule (График) only for the Company owner. They now get it as in the table: Edit for Manager, Technical supervisor and Project supervisor, View for Offeror, also in the projects these people already belong to. A role that already had Schedule at some level kept that level. A role without it got it, even if an administrator had left it out on purpose. If you do not want a role to have it, lower or remove Schedule on the Roles screen.

I changed a colleague's role, but nothing changed in the projects. Why?

Project access is a copy of the role, taken when the person is added to a project. A new role reaches their existing projects only if Reset their project permissions to the new role (Върни правата в проектите към новата роля) was ticked when you saved it; a change to the role itself reaches them only with Also apply these changes on their projects (Приложи промените и в проектите им) ticked. Otherwise the new role applies at once to company pages and to projects the person joins from now on. To align their existing projects now, use Reset project permissions to role in their Projects (Проекти) dialog on Admin → Employees, or change one project in its Project participants → Access level.

A colleague sees an edit button in a project but gets an access error when saving. Why?

Their project access is Edit, but their company role has only View (or nothing) for that permission. The server checks the role when saving. Raise the permission in their role, or lower their project access so the button is not shown.

Why is a section locked for me in one project but not in another?

Your access is set per project. In the project where it is locked, your project access lacks that permission. Ask someone with Projects at Edit to raise it in that project's Project participants.

Why does everything say "This feature is in a higher plan" even though my role has the permissions?

The plan wins over the role. Your company is on Free, you have no licence on a paid plan, or the plan invoice is more than 5 days overdue. Check the Licence column on Employees and the status on Subscription.

My role has Schedule at Edit. Why can't I open the schedule in one project?

The schedule is also checked against your access in that project. If your Schedule there is No access, the schedule, its categorizations and the working calendar of that project are closed to you, and BORO cannot work with them either. With View you can open them but not change them. Ask an administrator to change your access in the project's Project participants → Access level.

We moved to a smaller plan (or our trial ended). Are our roles and project access lost?

No. Moving the company to a smaller plan, the end of a trial and the end of an unpaid paid period remove nothing from the roles on the Roles (Роли) screen or from anyone's project Access level (Достъпност). Features the new plan lacks are locked while you are on it ("This feature is in a higher plan"). When you upgrade, they come back for the same people with the same levels; nobody has to grant them again.

A permission disappeared from our roles and project access, but our plan did not change. Why?

BuildColab removed that feature from your plan. When that happens, the feature is also removed from every role and every project member of the companies on that plan, so the roles on the Roles (Роли) screen and the project Access level (Достъпност) show it as no longer granted, or at a lower level if the plan only lowered it. If your plan includes the feature again later, an administrator with Members (Членове) at Edit has to grant it again in the roles and projects.

What is the difference between View and Edit?

View lets you open and read; Edit also lets you create, change and delete. Edit always includes View.

Which permission do I need to buy credits or extra storage?

Members (Членове) at Edit in your role. Buying credits and extra storage requires the Members permission with Edit access; everyone else sees "Your company role needs «Members» (Edit). Ask your administrator to add it to the role." when they click Top up credits or Expand storage. All members can still see the balance and the storage use.

Which permission do I need to send offer requests?

Outgoing bid requests at Edit, both in your role and in your access for that project. To answer requests other companies send you, you need Received bid requests at Edit in your role.

My role has Outgoing bid requests at Edit, but the section is still locked. Why?

Your company is on the Free plan, or it is on a paid plan and you have no seat (license). The Free plan does not include Outgoing bid requests (Изходящи запитвания): it is off at company and project level for every role, including the company owner, and a member without a seat in a paid company outside a trial works within the same limits. Check the Licence column on Employees. You can still receive and answer offer requests with Received bid requests. Sending offer requests needs a paid plan.

Which permission do I need to confirm a certificate of acceptance and payment?

Confirm certificates (contract finance) (Утвърждаване на сертификати (финанси по договори)). By default the Company owner, the Manager and the Project supervisor (the project lead) have it; the Accountant role does not. Contract finance at Edit is enough to register invoices and payments, hand over and provide certificates. Both are company permissions on the Roles screen. See Contract finance: certificates, invoices and payments.

Why does a sales agent see only some of the clients and deals?

Property sales (Продажби на имоти) shows only your own records: the clients, opportunities, offers and deals you are responsible for or whose deal team you are on. Property sales: management (Продажби на имоти: управление) at View shows all of them. Payments register (Регистър на плащанията) shows the financial side of every deal, and Property sales: legal (Продажби на имоти: правни) the deals where you are the lawyer. See Sales settings, legal entities and permissions.

Which permission do I need to record a buyer's payment?

Payments register (Регистър на плащанията) at Edit. Confirming a payment also needs the Payment confirmation (Потвърждаване на плащане) authority in the sales settings, and, with the Four eyes (Четири очи) setting on (the default), the person who recorded a payment cannot confirm it. See Buyer payments, receivables and reconciliation.

Which permission is needed for payment applications?

Reports (Отчети). View lets you read registers and payment applications; Edit lets you create, submit, approve, counter and reject them; Full access (Пълен достъп) also lets you set folder responsibles and work on any report when folders have responsibles. Progress reports (Работни карти) have their own permission, Progress reports.

What is the difference between Edit and Full access on Reports?

They differ only once a folder of your main BoQ has a responsible. Then Edit creates and edits only the reports for your own folders, while Full access works on every report, sets folder responsibles, changes a report's assignee and accepts or returns progress reports.

Why don't I see Full access in the role editor?

Full access is offered only on the Reports row, and only when your plan includes it.

Can I give someone the right to edit the company profile?

No. Only the company owner can edit the company name, UIC, phone and logo. If someone else should do it, transfer ownership to them.

Why can't I give my colleague a permission on a project another company shared with us?

On a shared project, the host decides the most your organization's people can have. Only the permissions the host gave your organization appear in the Permissions (Права) tab, each up to the level the host gave. Ask the host to add the permission; your organization is notified when it does.

Why can't I edit the company owner's access in a project?

The owner always has full access to every company project; their project access cannot be changed.