All statuses explained

On this page
  1. How to read this page
  2. Project phases
  3. BoQ documents and versions
  4. Offer requests: the asking company
  5. Offer requests: the answering company
  6. Offers (the answering company's offer cards)
  7. Contracting schedule packages
  8. Contract proposals and contracts
  9. Change orders
  10. Payment applications
  11. Contract finance
  12. Property sales
  13. Schedules
  14. Task boards
  15. Meetings
  16. Files: 3D/CAD processing
  17. Company, members and subscription
  18. Notifications
  19. BORO
  20. Common questions
  21. Related
WhereStatuses appear as colored pills, chips, bands and badges on lists, cards and page headers all over the app, for example the project header (/projects/{project}), the offer request panel and the payment application header.
Who canEveryone who can open the screen sees its statuses. Moving a status needs the permission named on the module page.
RelatedEnd-to-end: from BoQ to payment, Glossary, Troubleshooting and FAQ

How to read this page

Most statuses move by themselves when someone acts: sending, accepting, approving, signing. You rarely set a status by hand. The "Who moves it" column tells you whose action changes it. The same word can mean different things in different modules: Sent on an offer request means you invited partners, Sent on an offer card means the offer went to the client. Always read the status together with the screen it is on. Where a state exists in the system but is not shown as a label, the table says so and names what you see instead.

Project phases

The phase is shown as the colored Status (Статус) pill in the project header and in the project list. It is kept separately for each company on the project. See The project page.

Phase (EN)Phase (BG)MeaningWhat you can do nextWho moves it
BudgetingБюджетиранеInvestor track: budget drafts are being prepared and priced.Prepare drafts, send offer requests, accept a budget.Set when the investor creates the project.
OfferingОфериранеContractor track: you price a client's request or your own offer.Price and send the offer.Creating a contractor project, or accepting a client's request.
Offer sentИзпратена офертаYour offer is with the client.Wait; answer update requests.Your company, by sending an offer or an update response.
Update requestedЗаявена актуализацияThe client asked for a revised offer.Start (Започни), correct, Send response (Изпрати отговор).The client.
Contract proposalПредложение за договорA contract proposal waits for your answer.Review the contract (Прегледай договора), then accept or decline.The client, by proposing a contract.
CONTRACT DECLINEDОТКАЗАН ДОГОВОРThe contract was declined, or every request on the project ended without a contract for you.Offers stay available for reference.Your decline, or the client's award to others.
ExecutionИзпълнениеWorks are contracted: budget or contract pages, payment applications, schedule, financial dashboard.Contract, bill, plan.Signing a contract (contractor) or accepting a budget (investor).

With several requests on one project, the project shows the most advanced phase. Once in Execution, later offer events do not pull the project back.

BoQ documents and versions

Every BoQ (offer, budget draft, budget, contract) goes through versions. The version status shows in the version history and on the offer card band. See Versions, comparing and locking.

Status (EN)Status (BG)MeaningWhat you can do nextWho moves it
ProcessingОбработва сеThe current version is open and being edited.Edit; lock it with Save version (Запази версията).Anyone with Offers or Budget preparation at Edit.
Bid request baseБаза на запитванеThe first locked version (the base). For an offer created from an accepted request, the untouched copy of what the client sent.Edit: the first change opens version 2 without a warning.Finish base (Завърши база), or accepting a request.
CompletedЗавършенаA later locked version.Edit: the change opens a new version after a warning.Save version.
SentИзпратенаThe version was submitted as an offer; sending locks it.Wait for the client.Send to client (Изпрати към възложител).
Update requestedЗаявена актуализацияThe client asked for a corrected offer.Edit and send a new version.The client.

BoQ imports

Status (EN)Status (BG)MeaningWhat you can do next
In progressВ процесThe import is being prepared and corrected.Continue or Delete.
Saving to the projectЗаписва се в проектаThe import is being written to the BoQ.Wait.
Saved to the projectЗаписан в проектаThe import is in the BoQ.View, or delete the import record.

See Importing a BoQ from Excel.

Resource analysis

DotStatus (EN / BG)MeaningWho moves it
GrayNot started / НезапочнатNew analysis with no price.-
OrangeIn progress / В процесThe position has a unit price, or a completed analysis was changed.Automatic.
GreenCompleted / ЗавършенMarked as finished.You, with Complete (Завърши).

See Resource analysis.

Offer requests: the asking company

The status chip of a request shows in the request panel and on the Outgoing bid requests (Изходящи запитвания) list. See Creating and sending an offer request and Revisions, withdrawing and closing.

Status (EN)Status (BG)MeaningWhat you can do nextWho moves it
DraftЧерноваCreated, nobody invited yet.Edit positions, deadline, note, files; send.You, by creating it.
SentИзпратеноAt least one partner invited.Invite more, edit, revise, withdraw, close, compare and award.You, with Send to partner (Изпрати към партньор).
RevisedРевизираноA sent request that is revision 2 or later.The same as Sent.You, with Revise the request (Ревизирай запитването).
Closed · awardedПриключено · възложеноEvery position awarded and every awarded offer has a signed contract.View the award only.Automatic.
Closed · withdrawnПриключено · оттегленоYou withdrew the request from everyone.View only.You.
Closed · expiredПриключено · изтекъл срокYou closed it after the deadline. Requests never expire by themselves.View only.You.
Closed · all declinedПриключено · всички отказахаYou closed it when no partner was still active.View only.You.
Closed · replacedПриключено · замененоA newer revision replaced it.Open the newer revision.Revising.

Partner status on a request

Each partner card in the request panel has its own status.

Status (EN)Status (BG)MeaningWho moves it
SentИзпратенаInvited, no answer yet.You, by sending.
ProcessingОбработва сеThe partner accepted and is preparing its offer or an update.The partner.
ReceivedПолученаThe partner sent at least one offer.The partner.
DeclinedОтказаноThe partner declined. You are not notified.The partner.
WithdrawnОттегленоYou withdrew the request from this partner or from everyone.You.
Awarded to someone elseВъзложено на другAll positions went to other offers. The partner is not notified.Your award.
Accepted contractПриет договорThe partner accepted your contract proposal.The partner.
Declined contractОтказан договорThe partner declined your contract proposal.The partner.

The request timeline in the panel has five steps: Created (Създадено) → Sent (Изпратено) → Offers (Оферти, "{count} of {total}") → Awarded (Възложено) → Signed (Подписано).

Offer requests: the answering company

On the Requests (Запитвания) list in the company sidebar each received request has a pill. See Incoming offer requests (subcontractor side).

Status (EN)Status (BG)MeaningWhat you can do nextWho moves it
ReceivedПолученоWaiting for your decision.Open it, then Accept (Приеми) or Decline (Откажи).The client, by sending.
PendingВ изчакванеYou accepted and are preparing the offer.Price and send the offer on Offers.You, by accepting.
AcceptedПриетоYou have sent at least one offer. Note the wording: "Accepted" here means the offer was sent.Wait; answer update requests.You, by sending the offer.
DeclinedОтказаноYou declined. Final.Nothing.You.
WithdrawnОттегленоThe client withdrew the request.Nothing.The client.
Awarded to someone elseВъзложено на другThe client gave all positions to other offers. You are not notified.Nothing.The client.

Inside the project, the Offers page shows the same request with the client's wording: Sent (Изпратена), Processing (Обработва се), Received (Получена), Declined, Withdrawn or Awarded to someone else. The project page's Incoming requests (Входящи запитвания) card shows Offering, Update requested, Offer sent, Contract proposal or Contract for each request.

Offers (the answering company's offer cards)

An offer card on the Offers (Оферти) page has a status band with the version status from the BoQ table above, and badges for the client's decisions. See Preparing and submitting an offer.

Badge (EN)Badge (BG)Meaning
ContractedДоговоренаA signed contract exists on this offer. Open the contract (Отвори договора) opens it.
Contract being preparedДоговор в подготовкаThe client opened a contract on this offer; it is not signed yet.
Contract (part of the offer)Договор (част от офертата)Only some positions of this offer were awarded to you and contracted.
Carried over from revision {n}Пренесена от ревизия {n}The client revised the request; this offer was copied from your previous one with the prices of unchanged positions.
WithdrawnОттегленаArchived: the client withdrew the request.
Superseded by a revisionЗаменена от ревизияArchived: a newer revision replaced the request.
Awarded to someone elseВъзложено на другArchived: the positions went to other bidders.

Update request on an offer

Status (EN)Status (BG)MeaningNext stepWho moves it
Update requestedЗаявена актуализацияThe client asked for an update.Click Start (Започни).The client, with Request update (Заяви актуализация).
ProcessingОбработва сеYou started revising.Correct the offer, then Send response (Изпрати отговор).You.
Update sentАктуализация изпратенаYou sent the revised version.Wait for the client.You.

Contracting schedule packages

See Contracting schedule and packages.

Status (EN)Status (BG)MeaningWhat you do nextWho moves it
In preparationВ подготовкаNo request from the package has been sent yet.Create and send a request before Send by.Automatic.
Out for offersВ запитванеA linked request was sent to at least one partner.Follow up before Offers by.Sending a linked request.
Offers inС офертиOffers have arrived.Compare and award before Choose by.Partners sending offers.
AwardedВъзложенA contract, even a draft, exists on one of the package's offers.Get it signed before Contract by.Opening a contract.
ContractedДоговоренThe contract is signed.Delivery and mobilisation follow.Signing.
ArchivedАрхивиранYou archived the package; its positions are free again.Restore it to work with it again.You.

A late step shows Overdue · {days} days (Просрочено · {days} дни). A contract replaced by a change order shows as Replaced (Заменен).

Contract proposals and contracts

A contract itself has three states in the system: draft, signed and deactivated. They are not shown as one status pill; you recognize them by where the contract appears and by the banners and pills below. See Contracts: signing, details and history and Contract proposals.

StateWhat you see (EN / BG)MeaningWhat happens nextWho moves it
Draft contractThe contract panel on an offer; the package shows Awarded (Възложен); the offer shows Contract being prepared (Договор в подготовка)Created as soon as a contract panel is opened, or when a change order starts. Terms can be edited while no proposal is pending. Nobody is notified; a draft contract can never be deleted.Send as a proposal, sign it directly (a self-contract, or on behalf of a self-managed subcontractor), or finalize it (change order).The client.
Proposal pendingContractor: phase Contract proposal (Предложение за договор) and the banner You have a contract proposal (Имате предложение за договор)Waiting for the contractor. A second proposal on the same contract version is refused.Contractor accepts or declines.The client sends; the contractor answers.
SignedThe contract under Contracts with contractors (Договори с изпълнители) and Contract with client (Договор с възложител); partner status Accepted contract (Приет договор); package Contracted (Договорен)Active and locked. Version 1 at signing.Payment applications and change orders.The contractor accepts, or one company signs for both sides.
DeactivatedPartner status Declined contract (Отказан договор); contractor phase CONTRACT DECLINEDThe proposal was declined, or a change draft was superseded.Kept for the record.The contractor declines, or another change is accepted first.

Pills on the contract lists

Pill (EN)Pill (BG)MeaningWhat you do
Change proposalПредложение за промянаA change proposal on the contract waits for an answer.Click it to open the proposal and accept or decline it if it is your turn.
Change draftЧернова на промянаA change-order draft is in progress.Click it to continue editing.

Change orders

See Change orders and extensions and Partial acceptance.

Status (EN)Status (BG)MeaningNextWho moves it
Contract change proposal (pending)Предложение за промяна по договорWaiting for the other side. The draft is read-only.The other side accepts or declines.The contractor, with Propose change (Предложи промяна).
Accepted contract changeПриета промяна по договорMerged; the contract version went up by 1.Work and bill on the new version.The client accepts.
Declined contract changeОтказана промяна по договорRejected; the draft is deactivated.Make a new change if needed.The client declines.
SupersededЗамененаAnother change on the same contract was accepted first.Start a new change on the current version.Automatic.

The client's update request (Request update / Заяви актуализация) moves through requested, in progress (the contractor clicked Make a change / Направи промяна), answered (the change was proposed) and closed (the change was accepted, declined or finalized). These steps appear in the Contract change history, not as a separate pill. While a change proposal is pending, a new update request is refused.

Commitments behind the budget

Status (EN)Status (BG)Meaning
ActiveАктивенCounts in Committed (Ангажимент).
SupersededЗамененReplaced by a later change order; no longer counts.
ReleasedОсвободенRemoved by a change order; no longer counts.

See Investment budget and Financial dashboard: committed, certified, margin.

Payment applications

The screens call a payment application Report (Отчет). See How a payment application works.

Status (EN)Status (BG)MeaningWhat can happen nextWho moves it
DraftЧерноваThe contractor is preparing it. Only the preparing company sees it.Edit, Submit for Approval (Изпрати за одобрение), Delete draft (Изтрий чернова). Self-managed: Finalize (Финализирай).The contractor (or the client for a self-managed subcontractor).
Submitted (sender) / Received (receiver)Изпратен / ПолученUnder review. One status, two labels depending on the side.The company with the turn: Approve (Одобри), Counter (Насрещно предложение), Reject (Отхвърли). The other: Withdraw (Оттегли).Both companies, in turns.
ApprovedОдобренFinal. The quantities count as executed to date and as certified cost.Nothing; only the latest recorded report of a self-managed subcontractor can be voided.The company with the turn.
RejectedОтхвърленDeclined with a mandatory reason, shown as Rejection reason: (Причина за отхвърляне:).The contractor can Revise (Ревизирай) it into a new draft, if it is the newest report and the contract has not changed.The company with the turn.
WithdrawnОттегленPulled back by the company that sent the current proposal. Final.Start a new report, also with New from a previous version.The company that sent the last proposal.

A submitted report shows whose turn it is ("Waiting on {company}"). Each submission or counter-proposal is a round in the report history. Invoices and payments are not tracked after approval.

Progress reports

Progress reports (Progress report / Работна карта) are internal to the contractor and never shown to the client. See Progress reports.

Status (EN)Status (BG)MeaningWhat can happen nextWho moves it
DraftЧерноваThe author is entering quantities.Submit (Подай).The author, or a person with Reports at Full access.
SubmittedПодаденаWaiting for the office. Locked.Accept (Приеми) or Return (Върни) with a comment. Cannot be withdrawn.A person with Reports at Full access.
AcceptedПриетаFinal. Counts in the schedule's progress sources and can be used once for a payment application.New report from progress reports… in the contract's Reports panel.A person with Reports at Full access.
ReturnedВърнатаSent back with a comment, shown as Reason for return (Причина за връщане).New draft (Нова чернова) starts a corrected copy.A person with Reports at Full access.

Contract finance

These statuses are your company's own, in its Contract finance (Финанси по договори) register; the other party never sees them. See Contract finance: certificates, invoices and payments.

ObjectStatus (EN)Status (BG)Meaning
Contract in financeNot includedНе е включенYour company does not track this contract in finance.
DraftЧерноваAn inclusion is being prepared; nothing is recorded yet.
ActiveАктивноApproved payment applications create certificates.
PausedНа паузаNo new certificates until it is resumed; they are created in approval order on resume.
Certificate of acceptance and paymentDraftЧерноваA certificate in preparation: approved payment applications are added and removed freely; no number and no figures until Send for reconciliation. Shown under Drafts on the Certificates tab.
For reconciliationЗа съгласуванеCreated on approval; waits for the finance check and confirmation.
ConfirmedУтвърденThe basis for the invoice.
Handed over to accountingПредаден на счетоводствотоHanded to the accountants to issue the invoice.
InvoicedФактуриранRegistered invoices cover its whole amount to invoice.
ReplacedЗамененA corrected version replaced it.
CancelledАнулиранIts external payment application was voided.
InvoiceRegisteredРегистриранаIn the register. Its matching is Not allocated, Matches the certificates, Difference or Difference accepted; a credit note that corrects an invoice shows Corrects invoice {number}.
CancelledАнулиранаCancelled for good; its allocations were reversed.
PaymentTo reviewЗа прегледRegistered with an amount not yet allocated to invoice parts, or without a contract yet.
AllocatedРазпределеноThe whole amount is allocated to invoice parts.
CancelledАнулираноCancelled for good; its allocations were reversed.
Warranty deductionHeldЗадържанаNot payable until released.
ReleasedОсвободенаDue on the same invoice; a release is final.
Submitted invoiceAwaiting acceptanceЧака приеманеWaits for the payer ("Awaiting your acceptance" on the payer's side).
AcceptedПриетаRegistered in the payer's invoice register.
ReturnedВърнатаReturned with a reason; the subcontractor can correct and submit again.
WithdrawnОттегленаWithdrawn by the subcontractor before an answer.

Property sales

The Property sales module has statuses of its own, shown on its own screens; buyers and other companies never see them. This table lists them so you can find the page that explains each one, with what it means and what you can do next. Most change by themselves when someone acts: a hold expires, an approval is decided, a contract is signed, a payment is confirmed. See Property sales.

ObjectStatuses (EN)Statuses (BG)Explained in
Property on the availability boardAvailable, On hold, Reserved, Blocked by contract, Unavailable, Not for sale; with the marks Decision required and Contract in preparationСвободен, Временно задържан, Резервиран, Блокиран по договор, Недостъпен, Не се продава; с отметките Изисква решение и Договор в подготовкаProperties: board, property card and price lists
Technical readiness of a propertyUnder construction, Ready for viewing, Ready for handoverВ строеж, Готов за оглед, Готов за предаванеConstruction events
Price listDraft, Awaiting approval, Published, Superseded, WithdrawnЧернова, Чака одобрение, Публикувана, Заменена, ОттегленаProperties: board, property card and price lists
Opportunity (stage and outcome)New inquiry, Contacted, Qualified interest, Viewing, Offer, Negotiation, Reservation, Contract; Open, Won, LostНово запитване, Контакт, Квалифициран интерес, Оглед, Оферта, Преговори, Резервация, Договор; Отворена, Спечелена, ЗагубенаClients, inquiries, opportunities and viewings
Sales offer (version)Draft, Awaiting approval, Approved, Not approved, Sent, Accepted, Declined by the client, Expired, Superseded, WithdrawnЧернова, Чака одобрение, Одобрена, Неодобрена, Изпратена, Приета, Отказана от клиента, Изтекла, Заменена, ОттегленаSales offers
Hold and reservationAwaiting conditions, Active, Decision required, Converted, Released, Expired, CancelledОчаква условия, Активно, Изисква решение, Преобразувано, Освободено, Изтекло, АнулираноHolds and reservations
DealDraft, Active, Completed, CancelledЧернова, Активна, Приключена, АнулиранаDeals: creating, contract and signing
Contract of a dealPreparation, For approval, Approved, awaiting signature, Approval out of date, SignedПодготовка, За одобрение, Одобрен, чака подпис, Одобрението е остаряло, ПодписанDeals: creating, contract and signing
Client check (KYC) of a dealNot started, In progress, Completed, Needs attentionНе е започната, В процес, Приключена, Изисква вниманиеDeals: creating, contract and signing
Title transferNot transferred, Being prepared, TransferredНепрехвърлен, Подготвя се, ПрехвърленDeals: creating, contract and signing
Payment state of a dealNo payment, Partial, Paid in full, OverpaidНяма плащане, Частично, Напълно, НадплатеноBuyer payments, receivables and reconciliation
InstallmentPaid, Partially paid, Overdue (with the number of days), and its due-date stateПлатена, Частично платена, Просрочена (с броя дни), и състоянието на падежа ѝPayment plans, due dates and notices
Construction eventDraft, Registered, Confirmed, Rejected, Corrected, RevokedЧернова, Регистрирано, Потвърдено, Отхвърлено, Коригирано, ОтмененоConstruction events
Approval requestAwaiting decision, Approved, Rejected, Withdrawn, Expired, Out of dateЧака решение, Одобрено, Отказано, Оттеглено, Изтекло, НеактуалноSales home: attention queue, funnel and approvals
ImportUploaded, Read, Checked, Saving, Saved, Failed, CancelledКачен, Прочетен, Проверен, Записва се, Записан, Неуспешен, ОтказанProperties: board, property card and price lists
Activation of the module for a projectActive, Suspended, EndedАктивно, Спряно, ПриключеноSales settings, legal entities and permissions

A temporary hold (Hold / Временно задържане) and a Reservation (Резервация) share the same statuses but are different things: a hold keeps properties for a client for a short time; a reservation is the next, longer step before the deal, usually with a deposit.

Annexes and terminations add the contract statuses In amendment (В изменение), Termination in progress (Прекратяване в процес) and Terminated (Прекратен), and the deal status Terminated (Прекратена). See Annexes, unit swaps and termination.

The handover of a property has the statuses Not scheduled (Ненасрочено), Scheduled (Насрочено), Done (Извършено), Done with remarks (Със забележки) and Remarks closed (Забележките са приключени). See Handover and warranty claims.

Schedules

See Versions, locking and comparing and Linking the BoQ: distribution and matching.

Status (EN)Status (BG)MeaningWhat you can do nextWho moves it
DraftЧерноваThe working version; dates, dependencies and structure can change.Edit, report progress, Lock (Заключи) or Publish (Публикувай).Anyone with Schedule at Edit.
FinalФиналнаA locked baseline; its plan never changes.Report progress; make a change and confirm Create draft (Създай чернова) to start a new draft.Lock or Publish.

In the history panel the version you are looking at carries the tag Viewing (Преглеждате). A subcontractor's slice carries the badge Slice of master schedule — Version {version} (Срез от майсторски график — Версия {version}). See Publishing to subcontractors (slices).

BoQ coverage in the schedule

State (EN)State (BG)ColorMeaning
FullПълноGreenThe whole quantity is distributed.
PartialЧастичноAmberPart of the quantity is distributed.
No coverageБез покритиеRedNot in the schedule, or placed with quantity 0.
Manual onlyСамо ръчниGrayPlaced only in rows with Manual distribution.

Task boards

Every board uses the same four statuses; you cannot add your own. See Tasks: details, subtasks, comments, activity.

Status (EN)Status (BG)MeaningWhat you can do nextWho moves it
To doЗа правенеRecorded, not started.Drag to In progress, or click Start progress (Започни работа) in the task panel.Anyone with edit access to the board.
In progressВ процесSomeone is working on it.Move to In review (Send to review / Изпрати за преглед in the task panel) or Done.Same.
In reviewЗа прегледDone by the assignee, waiting for checking.Move to Done (Mark done / Маркирай като завършена in the task panel) or back.Same.
DoneЗавършеноFinished; no overdue coloring.Archive it, or move it back (Reopen / Отвори отново in the task panel returns it to To do).Same; also a meeting suggestion "Task done".

Priorities: Urgent (Спешен, red), High (Висок, orange), Medium (Среден, blue, the default) and Low (Нисък). An overdue due date shows in red with "overdue" (просрочена). An assignee who lost access shows "No longer has access".

Meetings

See Meetings and Recording, transcript and AI insights.

Status (EN)Status (BG)MeaningWhat you can do nextWho moves it
DraftЧерноваCreated, no recording yet.Record or upload on the Recording (Запис) tab.You, by creating it.
UploadedКаченоThe audio waits for transcription.Wait.Uploading.
TranscribingТранскрибиранеSpeech is turned into text and speakers are separated.Wait; you can leave the page.Automatic.
AnalyzingАнализThe AI extracts summary, decisions and task suggestions.Wait.Automatic.
ReadyГотоваTranscript, meeting report and suggestions are available.Review speakers and suggestions, create tasks.Automatic.
FailedНеуспешнаProcessing stopped; the page shows the reason, for example insufficient_credits.Fix the cause, click Try again (Опитай отново).Automatic.

Speaker matching and suggestions

State (EN)State (BG)Meaning
guessedпредположениеThe AI matched a voice to an attendee; check it.
confirmedпотвърденA person set or confirmed the match.
Not matchedНе е свързанThe voice is not linked; lines show "Speaker {number}".
To reviewЗа прегледSuggestion not decided yet: Accept, Edit or Dismiss.
AcceptedПриетаWill be applied with the next Create {count} tasks.
Applying…Прилага се…Being created now.
CreatedСъздаденаApplied; shows "Created as #{number}".
DismissedОтказанаRejected; Restore (Върни) to reconsider.
FailedНеуспешнаCould not be applied; the suggestion shows why.
SupersededЗамененаReplaced by a newer extraction.

Files: 3D/CAD processing

See 3D/BIM models and processing credits.

Status (EN)Status (BG)MeaningWhat you can do next
Not processedНе е обработенStored, not sent for processing.Click it or choose Process (Обработи) to see the price and start.
Pending processingИзчаква обработкаRequested, waiting to start.Wait.
ProcessingОбработва сеBeing converted.Wait; you get a notification.
Ready for viewingГотов за прегледOpens in the 3D viewer.Click it.
Processing errorГрешка при обработкаConversion failed; nothing was charged.Retry (Опитай отново).

Items in the Trash show Restorable until a date 30 days after deletion. See Trash and restoring.

Company, members and subscription

Invitations

Status (EN)Status (BG)MeaningWhat you can do
SentИзпратенаWaiting for the person.Resend the e-mail.
AcceptedПриетаThe person joined the company.Manage the member on Employees (Служители).
DeclinedОтказанаThe person declined.Invite the e-mail again.

The Licence (Лиценз) column on Employees shows Active (Активен) or No licence (Без лиценз). A member with no license works with Free-plan features. See Members, invitations and licences.

Plan and invoices

Status (EN)Status (BG)Meaning
ActiveАктивенThe plan is in force.
Trial periodПробен периодA trial granted by BuildColab; full access for every member.
Past dueИзтичащ периодThe invoice is unpaid more than 5 days after the period start, or the paid period ended and the 5-day grace is running.
CancelledОтмененYou switched to Free; the paid plan runs until its end date.
Invoice UnpaidНеплатенаIssued, waiting for your bank transfer.
Invoice PaidПлатенаBuildColab recorded the payment.
Invoice FailedОтказанаThe payment failed; treated as unpaid.

See Subscription, plans and billing.

Credits

The credit chip in the File manager action bar shows these states. The chip itself shows the number followed by "credits" (кредита); the texts in the table are its hover tooltip. Screen readers and assistants read the chip as "Credit balance: {balance}" (Баланс кредити: {balance}). The credit chip under the message field of the BORO panel shows the lightning icon and the balance, turns orange below 50 credits and red at 0.

StateWhat you see (EN / BG)Meaning
NormalAmber lightning; "Balance: {balance} credits" / „Баланс: {balance} кредита“50 credits or more.
LowOrange triangle; "Your credits are running low" / „Кредитите ви са на привършване“Below 50.
EmptyRed triangle; "Credits exhausted" / „Кредитите са изчерпани“0 or less; BORO, meeting processing and 3D/CAD processing stop until you top up.

See Credits (BORO, file processing).

Notifications

Status (EN)Status (BG)Meaning
Unread / ReadНепрочетено / ПрочетеноWhether you opened the notification.
DoneИзвършеноThe work behind a Needs action (Изисква действие) item is done; it leaves the tab after 24 hours.
Not doneНеизвършеноThe action is still open.
OverdueПросроченоThe deadline of the action passed; also "Overdue by N days" (Просрочен с N дни).

The bell counter counts open action items, not unread ones. See Notifications and their settings.

BORO

A change BORO proposes waits on an approval card Requires approval (Изисква одобрение) until you click Approve (Одобри) or Decline (Откажи). Long work runs as a background task with these statuses:

Status (EN)Status (BG)Meaning
QueuedИзчакваWaiting to start.
RunningИзпълнява сеBORO is working on it.
Awaiting approvalЧака одобрениеA proposed change waits for your approval.
Awaiting inputОчаква отговорBORO asked you a question.
CompletedЗавършенаFinished; the result is shown.
FailedНеуспешнаStopped with an error.
CancelledПрекратенаYou canceled it.

See Approvals and background tasks.

Common questions

Why does my received request say "Accepted" when I have not accepted anything new?

On the Requests list, Accepted (Прието) means you sent an offer. Pending (В изчакване) means you accepted the request but have not sent an offer yet.

Why does the same payment application say "Submitted" for me and "Received" for my client?

It is one status seen from two sides: the sender sees Submitted (Изпратен), the receiver Received (Получен).

The project status changed by itself. Is that normal?

Yes. The phase follows offers, contracts and budgets. Sending an offer sets Offer sent, a contract proposal sets Contract proposal, signing or accepting a budget sets Execution.

My package says "Awarded" but nobody has signed. Why?

A package counts as awarded as soon as a contract exists on one of its offers, even a draft. It becomes Contracted when the contract is signed.

My offer request passed its deadline. Is it closed?

No. Requests never expire on their own. Closed · expired appears only when you close the request after the deadline.

Can I set a status by hand?

Only on task boards, by dragging a card. Everywhere else the status follows actions.

Can I add my own task status, such as "Waiting for the investor"?

No. Use a label or the In review status.