Sharing, comments and mentions
On this page
- Who sees which files
- Access levels
- How to share a file or folder with colleagues
- How to share project files with a partner company
- Sharing with a role
- How to share a file or folder with a role
- How to remove a role's access
- How to remove someone's access
- Comments
- How to add a comment
- How to mention someone
- How to resolve, edit or delete a comment
- File notifications
- Common questions
- Related
| Where | File manager → right-click a file or folder → Share (Споделяне). Comments: open the file and click the Comments (Коментари) tab in the editor or 3D viewer. |
|---|---|
| Who can | Sharing: the item's owner, anyone with Edit (Редакция) access to it, and the company owner. Sharing with a role: the same people, as members of the company; external participants (guests) cannot. Commenting: Comment (Коментиране) or Edit (Редакция) access to the file. Reading comments: any access. The company owner always has full access to every file. On the Free plan the File Manager is read-only: you can browse, open, preview and download files, including files attached to offer requests you receive. Uploading, creating folders, renaming, moving, deleting and sharing need a paid plan. |
| Related | Project team and access, Partners, Notifications and their settings, Viewing and editing documents |
Who sees which files
File visibility in BuildColab is personal. Belonging to a company or being on a project team does not by itself show you its files. In the file manager you see a file or folder only when one of these is true:
- You are its owner. The owner is the person who created the folder, uploaded the file or created the document.
- It was shared with you at Read (Четене), Comment (Коментиране) or Edit (Редакция) level, directly or through a shared parent folder.
- It was shared with a role you hold in your company, and, for a project file, you are on that project's team.
- You are the company owner. The company owner has full access to every file of the company and of all its projects. This access cannot be removed.
As a result, two members of the same project can see different files in the same folder. If one file deep in a folder structure is shared with you, you also see the parent folders on the way to it, but not their other, unshared content.
Your role still has to allow the file manager: the File manager (Файлов мениджър) permission with View (Преглед) or Edit (Редакция). Sharing gives access to specific items; the role permission decides whether you can use the file manager at all. See Roles.
How sharing spreads to new items
- Sharing a folder covers everything inside it, including subfolders, at the moment you share.
- New items inherit the folder's sharing. A file uploaded or a folder created inside a shared folder is visible at once to everyone the folder is shared with, at the same level. The folder's owner also gets Edit access to new files put into their folder by others.
- The top level is private. A folder or file created at the top level of the file area is visible only to its owner (and the company owner) until it is shared.
- Copies take the destination's sharing, not the original's.
Access levels
| Level | What the person can do |
|---|---|
| Read (Четене) | See the item, open it read-only, preview, download, see the version history and download old versions, read comments. |
| Comment (Коментиране) | Everything in Read, plus write comments and replies, place pins on 3D models, and mention people. |
| Edit (Редакция) | Everything in Comment, plus edit and save documents in the browser, upload new versions, restore versions, rename, change the description, move, delete, restore from the Trash, add files and folders inside a shared folder, process 3D/CAD models, and change who the item is shared with (people, partner companies and roles). |
| Owner (Собственик) | Everything in Edit, plus delete it forever from the Trash. |
| Company owner (Собственик на компанията) | Full access to every item of the company and its projects, including deleting forever from the Trash. |
Even with Edit access, actions that add or change content also need the Edit level of the File manager permission in your role.
The file manager offers only what your access allows. With Read or Comment access, a file's menu shows Quick preview (Бърз преглед), Open (Отвори), Download (Изтегли), Copy to… (Копирай в…), Version History (История на версиите) and Details (Детайли); the version history has no buttons for a new version or for restoring one. Edit details (Редактирай детайли), Move (Премести), Share (Споделяне) and Delete (Изтрий) appear only with Edit access. When several ticked files include one you cannot change, Move and Delete are not offered for the selection. With only View of the File manager permission (or on the Free plan), Copy to… is hidden too, and Upload file (Качи файл) and New folder (Нова папка) stay visible but show the missing-permission message. Inside a folder shared with you as Read or Comment, New (Нов), Upload folder (Качи папка) and Upload file are disabled, with the tooltip You can only view or comment in this folder. Ask its owner for «Edit» access to add files or folders here.
How to share a file or folder with colleagues
- In the file manager, right-click the file or folder and choose Share (Споделяне). The dialog Share "{name}" (Споделяне на „{name}“) opens.
- In a project, make sure the Team (Екип) tab is selected. In the company file area there is only the team list.
- Type a name or e-mail in Search members (Търсене на членове). Only members of the company (for company files) or of the project team (for project files) can be found.
- Click Add (Добави) next to the person. They are added with Read (Четене).
- Change the level in the person's dropdown to Comment (Коментиране) or Edit (Редакция) if needed. The note Changes pending confirmation (Промени чакащи потвърждение) reminds you that nothing is saved yet.
- Click Save (Запази). The message Shared users saved successfully confirms it.
Each person who gained or changed access gets the notification {name} shared "{file}" with you. Sharing again with the same person updates their level. The list People with access (Хора с достъп) shows everyone who already has access; the owner and the company owner appear with a fixed label and cannot be changed or removed, and you cannot change your own row.
OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.
Figure: The Share dialog of a project folder, Team tab.
- The search field Search members (Търсене на членове) finds colleagues to add.
- The tabs Team (Екип) and Organizations (Организации) with the number of people and companies that have access.
- The list People with access (Хора с достъп); owners carry a fixed label.
- Save (Запази) applies the added people and changed levels.
How to share project files with a partner company
In a project's file manager you can share a file or folder with a whole partner company, for example a subcontractor, instead of choosing its people one by one.
- Right-click the item and choose Share (Споделяне).
- Click the Organizations (Организации) tab.
- Type at least 2 characters of the company's name or e-mail in Search organizations (Търсене на организации) and click Add (Добави) next to the company. External companies managed outside BuildColab carry a badge.
- Click Save (Запази). The message Shared partners saved successfully confirms it.
Partner companies get Read (Четене) access. BuildColab gives that access to each of the partner's employees who are on this project's team at that moment, and each of them is notified. If the partner has nobody on the project yet, the save succeeds but nothing is shared; add their people to the project team first (see Project team and access) and share again. The Organizations tab exists only for project files.
OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.
Figure: The Organizations tab of the Share dialog.
- The Organizations (Организации) tab.
- The search field Search organizations (Търсене на организации).
- The list Organizations with access (Организации с достъп).
Sharing with a role
In the BuildColab file manager you can share a file or folder with a role of your company, for example "Site manager", instead of choosing people one by one. Everyone in your company who holds that role gets access: for a project file, those of them who are on the project team; for a company file, all of them. Access follows the role over time:
- New people get access automatically. A colleague who is added to the project team, joins the company or is given the role can open the item at once, without anyone sharing it with them.
- Access ends automatically. A person who leaves the project team or the company, or whose role changes, loses the access the role gave them.
- A folder covers everything inside it, including files and subfolders added later. A role shared on a folder is shown on every item inside it as coming from that folder.
- Only member roles are offered. External participants (guests) never get access through a role, even when their own role has the same name, and they cannot share with a role. The Company Owner role is not offered either: the company owner already has full access to every file.
- A role with Edit access makes its holders editors of the item: they can also change its sharing.
How to share a file or folder with a role
- In the file manager, right-click the file or folder and choose Share (Споделяне).
- Click the Roles (Роли) tab. It shows Roles with access (Роли с достъп) and Roles you can add (Роли, които можете да добавите), each with the number of people who hold the role on this project (or in the company).
- Click Add (Добави) next to the role. The role gets Read (Четене) access at once; the message Shared with the role "{name}" confirms it. There is no Save on this tab: every change applies immediately.
- To give the role more, open its level and choose Comment (Коментиране) or Edit (Редакция). The message The role's access was updated confirms it.
Everyone who holds the role and whose access rose gets the notification {name} shared "{file}" with you. People who get access later (they join the project or the company, or get the role) receive one summary notification instead: You can now open {count} files and folders shared with the "{role}" role in "{project}".
In People with access (Хора с достъп) on the Team (Екип) tab, a person who has access through a role carries the label via role {name} (чрез роля {name}). You can still give such a person a higher level by changing it there and clicking Save; that adds their own access next to the role's.
How to remove a role's access
- Right-click the item, choose Share (Споделяне) and click the Roles (Роли) tab.
- Click the × button Remove (Премахни) next to the role.
- Confirm Remove access to "{item}" for everyone with the role "{role}"? People who also have their own access keep it. with Remove (Премахни). The message The role share was removed appears.
Everyone who had access only through that role loses it at once, on the item and, for a folder, on everything inside it. People who were also given access personally keep their own access.
How to remove someone's access
- Right-click the item and choose Share (Споделяне).
- In People with access (Хора с достъп), click the × button Remove (Премахни) next to the person's level.
- Confirm the question Are you sure you want to remove {email}'s access to {item}? with Remove (Премахни). The message Access removed successfully appears.
Removing access from a folder also removes it from everything inside that folder. Removing takes effect at once, without clicking Save.
A person who has access only through a role (label via role {name}) has no × button: remove the role on the Roles tab, or change the person's role. If you remove the own access of someone who also has access through a role, the message Their own access was removed, but they still have access through a role. appears and the person stays in the list with the role's level.
Comments
Comments let the team discuss a document where it lives, instead of in e-mail. They are available in the editor (Word, Excel, PDF, Markdown, text, CSV) and in the 3D viewer. Open the file and click the Comments (Коментари) tab in the top right; Close comments closes the panel.
- Tabs. Active (Активни) shows open threads, Resolved (Разрешени) the closed ones, All (Всички) both.
- Plain and anchored comments. A comment can be plain text, or anchored to a place: a cell in Excel (shown as Cell {ref}), a passage in a document (Go to location in document), a pin on a 3D model (Go to pin) or a saved camera view (Go to viewpoint). Click the link to jump there.
- Threads. Every comment can have replies. View {count} replies and Load more replies show them; Hide replies folds them.
- Versions. Each comment belongs to the version it was written on. Comments on older versions appear under a separator Version {n}, or Deleted version if that version is gone.
- The Comments (Коментари) tab opens the panel.
- The filter tabs Active, Resolved and All.
- The field Write a comment… (Напишете коментар…) with the button Post (Публикувай).
How to add a comment
- Open the file from the file manager and click Comments (Коментари).
- To anchor the comment, first select the place: a cell in Excel or a passage in Word. On a 3D model, use Drop pin (see 3D/BIM models and processing credits).
- Type in Write a comment… (Напишете коментар…).
- Click Post (Публикувай) or press Ctrl+Enter (⌘+Enter on a Mac).
The file's owner is notified with {name} left 1 comment on "{file}". To reply, click Reply (Отговори) under a comment, type in Write a reply… and post; the owner and everyone already in the thread are notified. You need Comment or Edit access; with Read access the panel shows You do not have permission to comment on this file.
How to mention someone
- In the comment field, type @.
- The list People you can mention (Хора, които можете да споменете) appears. It shows only people who can open the file: its owner, the people it is shared with and the company owner.
- Pick the person; their name appears as a chip in the text. Finish the comment and post it.
The mentioned person gets {name} mentioned you in a comment on "{file}" instead of the ordinary comment notification. To involve someone who cannot open the file, share the file with them first; a mention never reveals a file to a person without access. If you edit a comment and add a new mention, only the newly mentioned person is notified.
How to resolve, edit or delete a comment
| Action | How | Who can |
|---|---|---|
| Resolve a thread | Click Resolve (Разреши). The thread moves to Resolved and shows the badge Resolved (Разрешен). If someone else resolves your comment, you are notified: {name} resolved your comment on "{file}". | The comment's author or the file's owner |
| Reopen a thread | In Resolved, click Reopen (Възобнови). Nobody is notified. | The comment's author or the file's owner |
| Edit a comment | Choose Edit (Редактирай) on your comment, change the text, click Save (Запази). | Only the author |
| Delete a comment | Choose delete on the comment and confirm. Deleting the first comment of a thread deletes its replies too. This cannot be undone. | The comment's author or the file's owner |
File notifications
File events appear in the BuildColab notification center under the module File manager (Файлов мениджър), category Files (Файлове). Each notification has the button Open file (Отвори файла) and a line explaining why you got it, for example you have access to the file or you were mentioned. You are only told about files you can open. You can turn the module down or off in your notification settings; see Notifications and their settings.
| Event | Example text | Who is notified |
|---|---|---|
| Files uploaded | {name} uploaded 8 files to "{folder}" | People the folder is shared with. Uploads at the top level notify nobody. Grouped per folder and day. |
| New version | {name} uploaded 1 new version of "{file}" | The owner and everyone the file is shared with. Grouped per file and day. |
| Version restored | {name} restored an earlier version of "{file}" | The owner and everyone the file is shared with. |
| Shared with you | {name} shared "{file}" with you | Each person whose access was granted or changed, including the holders of a role the item was shared with. |
| Access through a role | You can now open 12 files and folders shared with the "Site manager" role in "{project}" | A person who gained items through role shares because they joined the project or the company, or their role changed. One notification per role and project; the button Open files (Отвори файловете) opens that file manager. |
| Comment | {name} left 1 comment on "{file}" | The file's owner. |
| Reply | {name} posted 1 reply in a discussion on "{file}" | The file's owner and everyone already in the thread. |
| Mention | {name} mentioned you in a comment on "{file}" | The mentioned person, if they can open the file. |
| Comment resolved | {name} resolved your comment on "{file}" | The comment's author, when someone else resolved it. |
| Deleted | {name} deleted "{file}" | The owner and everyone the item was shared with. |
| 3D/CAD processing done | The model "{file}" is ready to view / could not be processed | The person who uploaded that version. |
The company owner can open every file but is notified only about files on which they are the owner, a sharing recipient, a thread participant or mentioned, so their notification center is not flooded by every upload in every project.
Common questions
Why can't I find a company on the Organizations tab of the Share dialog?
The Organizations (Организации) tab finds only companies tied to the project by an offer request: partners invited to an offer request in this project, or the company that invited you to one. A collaborator company that the project is shared with, or a partner with no offer request in this project, does not appear. Type at least 2 characters of the company's name or e-mail, and check that your role has the Partners (Партньори) permission at View.
I shared a folder with a colleague. Will they see files I add to it later?
Yes. A file or folder created inside a shared folder inherits that folder's sharing at once, at the same level, and the colleague gets an upload notification.
Why can't my colleague see the file I uploaded?
You probably uploaded it at the top level of the file area, where new items are private, or into a folder that is not shared with them. Share the file with them, or move it into a folder they can see.
Why can't I change who a file is shared with?
Only the file's owner, someone with Edit (Редакция) access to it, or the company owner can change its sharing. Otherwise the Share dialog is read-only. Ask the owner, shown as Author (Автор) in the file's Details (Детайли), or an editor.
How do I make sure every new site manager sees the drawings folder?
Share the folder with the role instead of with people: Share → Roles (Роли) → Add next to the role. Everyone who holds the role on the project now, and everyone added to the project with that role later, can open the folder and everything in it.
Why can't I remove a person who has the label "via role"?
That person has access only because of their role. Remove the role on the Roles (Роли) tab (this removes everyone who has access only through it), or change the person's role in the company. Sharing with a role has no exceptions for single people.
A colleague with the right role still cannot see a project file shared with the role. Why?
For a project file, the role gives access only to people who are on the project team. Add the colleague to the project team; the access appears at once and they get a summary notification. External participants (guests) never get access through a role.
Why can't I remove a role on a file inside a folder?
The role is shared on the folder above, so the row reads From the folder "{name}" — change or remove it there. Open the Share dialog of that folder and remove the role there.
Why can't I find a person in the Share dialog?
Company files can be shared only with members of your company, project files only with members of the project team. Add the person to the company or the project team first; see Project team and access.
I shared a folder with a subcontractor company but nobody there can see it. Why?
Sharing with a partner company gives Read access to the partner's employees who are on the project team at that moment. If none were on the team, nothing was shared. Add their people to the project team, then share the folder again.
Why can't I comment on this file?
You have Read access only, which shows You do not have permission to comment on this file., or you are viewing an older version, which shows You cannot comment on a previous version of this file. Ask the owner for Comment access, or go back to the latest version.
Why isn't my colleague in the @ list?
The list People you can mention shows only people who can open the file. Share the file with your colleague first, then mention them.
Can the company owner see all files?
Yes. The company owner has full access to every file in the company file area and in all of the company's projects, even files that were never shared with them. This access cannot be removed.
Do file notifications come by e-mail?
File events are delivered to the notification center in BuildColab. Check your notification settings for the File manager module; see Notifications and their settings.