Create or join a company
On this page
| Where | Company selection /companies; received invitations /companies/invites; company switcher: the Organization (Организация) chip at the top of the sidebar; company e-mail confirmation result /companies/verify; taking over a self-managed company you were invited to /claim-company |
|---|---|
| Who can | Any signed-in user can create a company or answer invitations addressed to their confirmed e-mail. Only the Company owner can edit the company's name, UIC, phone and logo. Every member except the Company owner can leave a company. Only a Company owner can merge an invited self-managed company into their company. |
| Related | Members, invitations and licences, Organization profile, Roles, Subscription, plans and billing |
The company selection screen
The company selection screen (/companies) opens after sign-in when you have no selected company, after you leave a company, and whenever you open a page that needs a company while none is selected. It has two states:
| Your situation | What the screen says | Buttons |
|---|---|---|
| You belong to no company yet | "There is no organization you belong to. Please create a new one or accept an invite" (Няма налична организация към която принадлежите, моля създайте нова или приемете от покани) | Create company (Създай компания) opens the create dialog. Invites (Покани) opens your received invitations. |
| You belong to one or more companies | "Choose an organization to continue" (Изберете организация, за да продължите), followed by the list of your companies with their logos. A company where you are an external participant is listed as "External participant at <company>" (Външен участник в <company>). | One per company. Click a company to select it and open its project list, the same as choosing it from the Organization chip at the top of the sidebar. |
Your selected company is saved on your profile, so BuildColab opens the same company the next time you sign in, on any device. Some pages work without a selected company: your profile, the invitations page and the legal acceptance page.
How to create a company
- On the company selection screen click Create company (Създай компания). If you already belong to a company, click the Organization chip at the top of the sidebar and choose Create a new organization (Създаване на нова организация) at the bottom of the menu.
- In the Create a new organization dialog fill in the fields below.
- Click Save (Запази). Cancel (Отказ) closes the dialog without creating anything.
- A Confirmation (Потвърждение) dialog says "The verification email has been sent. Please check your inbox." (Имейлът за потвърждение беше изпратен. Моля, проверете своята поща.). Click Closing (Затваряне).
- BuildColab selects the new company and opens its (empty) project list.
| Field (EN / BG) | Required | Rules |
|---|---|---|
| Organization name / Име на организация | Yes | 2–50 characters after trimming spaces. It must not contain script, text in angle brackets, --, ; or ..; otherwise you see "The name contains malicious content" (Името съдържа зловреден текст). |
| uic / еик | No | The company's registration number (ЕИК). You can add it later. |
| email / имейл | Yes | The company's contact e-mail. It must be a valid address. It cannot be changed in the app after the company is created, so use a shared mailbox such as office@ rather than a personal one. |
| Phone / Телефон | No | Formatted automatically as a Bulgarian number, +359 XXX XXX XXX. |
There is no logo upload in the create dialog. Add the logo afterwards in the Organization details dialog or on Admin → Organization.
What BuildColab sets up when you click Save:
- The company starts on the Free plan (BASIC - free). You can choose a paid plan later in Admin → Subscription (Абонамент).
- You become an employee with the Company owner (Собственик на компанията) role, which has every permission and a seat.
- The company gets a copy of the default roles: Manager (Мениджър), Technical supervisor (Технически ръководител), Project supervisor (Ръководител проект) and Offeror (Оферент). You can edit them or add your own; see Roles.
- The company's file storage is created, ready for the file manager.
- A confirmation e-mail goes to the company e-mail address (see the next section).
- The Organization name field (required, 2–50 characters).
- The UIC field for the company's registration number (optional).
- The Email field for the company's contact e-mail (required, cannot be changed later in the app).
- The Phone field (optional, Bulgarian format).
- The Save button that creates the company and sends the confirmation e-mail.
Confirming the company e-mail
When you create a company, BuildColab sends an e-mail with the subject "Confirm your organization's email for BuildColab" (or "Потвърдете имейла на организацията си в BuildColab", in the language of the person who triggered it) to the company e-mail address. It contains the button Confirm the organization's email (Потвърди имейла на организацията). The link is valid for 48 hours and does not require signing in.
- Opening the link shows "Verification successful!" (Успешно потвърждаване!) or "Verification failed" (Неуспешно потвърждаване) and a Continue (Продължи) button that opens the company's projects. Opening it again on an already confirmed company still shows success.
- You can use the company straight away; you do not have to wait for the confirmation.
- Until the e-mail is confirmed, Admin → Organization shows the warning "The organization's email is not verified" (Имейлът на организацията не е потвърден) with a Resend email (Изпрати отново имейл) button, and the company cannot activate a paid plan: checkout asks you to "Confirm your email first" (Първо потвърдете имейла си).
This confirms the company's contact address. It is separate from confirming your personal login e-mail.
How to join a company by invitation
A company administrator invites you by e-mail address and chooses the role you will have (see Members, invitations and licences). You receive an e-mail with the subject "Invitation to join {company} on BuildColab" (Покана да се присъедините към {company} в BuildColab). It is in the language saved in your BuildColab profile if you already have an account, otherwise in the inviter's language. It links to the sign-in page and explains what to do: if you have an account, sign in and open the invitations; if not, register with exactly this e-mail address and the invitation will be waiting. When you sign in from its button, or register and confirm your e-mail from there, BuildColab opens the Invites from organizations (Покани от организации) page for you. The e-mail states that the invitation is valid for 7 days, so answer it promptly.
- Sign in (or register and confirm your e-mail first). Invitations are matched to your confirmed e-mail address; an unconfirmed account sees no invitations.
- If you did not come from the e-mail's button, open the Invites from organizations (Покани от организации) page in one of these ways: the Invites button on the company selection screen; the Organization chip in the sidebar → INVITES (ПОКАНИ); or the avatar menu → My profile → View invites (Разгледай поканите).
- Find the invitation with the status Pending (В изчакване) and click Accept invite (Приеми поканата).
- The Confirm acceptance (Потвърдете приемане) dialog asks whether you want to join the company with the named role. Click Confirm acceptance (Потвърди приемане). Keep invite (Запази покана) closes the dialog and leaves the invitation pending.
- The invitation becomes Accepted (Приета) and the company becomes your selected company.
When you accept, you become an employee of the company with the invited role, and BuildColab tries to give you a licence seat: a free purchased seat first, otherwise one of the plan's included seats. If the company has no free seat, you still join, but without a licence; until an administrator assigns you a seat you can use only the features of the Free plan. See Members, invitations and licences.
Some invitations come together with an offer request: a contractor invited your e-mail to answer a request and BuildColab created the company invitation for you. Accepting such an invitation also records the two companies as partners and takes you straight to the offer request, so you can answer it. See Incoming offer requests (subcontractor side).
How to decline an invitation
- On the Invites from organizations page click Decline (Откажи) on the pending invitation.
- The Confirm decline (Потвърдете отказ) dialog warns that the sender will need to send a new invitation if you want to join later. Click Confirm decline (Потвърди отказ), or Keep invite to cancel.
An invitation can be answered once. After it has been accepted or declined it can no longer be changed; ask for a new invitation. If the invitation was already answered, for example in another browser tab, the confirmation dialog closes with the message "This invitation was already answered and can no longer be accepted or declined." and the invitations page shows its current status.
The invitations page
| Column (EN / BG) | What it shows |
|---|---|
| Date / Дата | When the invitation was sent (DD/MM/YYYY). The newest invitations are at the top. Sortable. |
| Company / Компания | The inviting company. Sortable. |
| Role / Роля | The role you will have; it decides your permissions in that company. Sortable. |
| Status / Статус | Pending (В изчакване) — waiting for your answer; Accepted (Приета); Declined (Отказана). |
| Actions / Действия | Decline and Accept invite; both are disabled once the invitation is no longer pending. |
- The Company column shows who invited you.
- The Role column shows the role you will receive.
- The Status column shows Pending, Accepted or Declined.
- The Actions column holds the Decline and Accept invite buttons of a pending invitation.
How to take over a company profile you were invited to
A company on BuildColab can keep a self-managed company for a partner that is not on BuildColab yet: it records that partner's offers, contracts and payment applications on its behalf. When it invites you to take that company over, you receive an e-mail with a link to the Take over your company profile (Поемане на фирмения профил) page, /claim-company. Sign in, or create an account, with the e-mail address the invitation was sent to. The page shows who invited you, the company you are invited to take over, the invited address (partly hidden) and the date until which the invitation is valid (Valid until, Валидна до).
When you are the Company owner of at least one other company on BuildColab, the takeover page asks How do you want to take it over? (Как искате да я поемете?) and offers two choices. Without such a company you see only the first one.
| Choice | What happens | Who can choose it |
|---|---|---|
| As its own company (Като отделна фирма) | The self-managed company becomes a separate company on BuildColab with all its projects and documents, and you become its Company owner. You may enter or correct its Company UIC (ЕИК на фирмата) and click Take over the profile (Поеми профила). | Anyone signed in with the invited e-mail address. |
| Merge it into one of my companies (Обедини я с една от моите фирми) | Everything the self-managed company has moves into a company you already run, and the self-managed company stops existing as a separate company. | Only a Company owner of the company you merge into. Account permissions alone are not enough, because a merge hands over contracts and money records. |
How to merge a self-managed company into one of your companies
- Open the link from the invitation e-mail and sign in with the invited address.
- Under How do you want to take it over? choose Merge it into one of my companies (Обедини я с една от моите фирми).
- In Company to merge into (Фирма, с която да се обедини) pick one of your companies. Only companies where you are the Company owner are listed. If you also own the company that invited you and pick it, the check refuses it.
- BuildColab checks the merge and shows What moves into "{company}" (Какво преминава към „{фирма}“): a count of each kind of item that moves, for example projects, bills of quantities (BoQs), resource analyses, offer requests, offers, awards, contracts, contract proposals, schedules, files, the partnership with the inviting company and project collaborations. Payment applications, change orders and the history of each document move together with them.
- Under Already in "{company}" (Вече са в „{фирма}“) the check lists what your company already shares with the self-managed one: projects both take part in (the two participations become one, keeping the more advanced phase), an existing partnership with the inviting company (the two partner records become one) and an existing collaboration with it (the two collaborations become one).
- If the invitation offered seats from the inviting company's plan, the check says whether they will be used: the inviting company starts managing your company's plan, or the seats are not used because your company has its own plan or is already managed. If managing other companies' plans has been switched off on BuildColab since the invitation was sent, the check says "The seats the invitation offered can't be used right now; the merge goes ahead without them." and the merge proceeds without the seats.
- Read the warning and click Merge — this can't be undone (Обедини — не може да се отмени). BuildColab merges the companies, shows ""{self-managed company}" was merged into "{company}"" and opens your company's project list.
No approval is needed from the inviting company. It receives a notification that the self-managed company was merged into your company; see Notifications and their settings. Merge checks count toward a daily limit of the inviting company, shared by all of its invitations. A check that is refused before it runs (for example, you are not the Company owner of the chosen company, the invitation is no longer valid, or you picked the inviting company) does not count. While the page stays open, picking a company you checked in the last two minutes shows that check again without counting it; after two minutes, or after you reload the page, the company is checked again and that check counts. If a check is more than two minutes old when you click Merge — this can't be undone, BuildColab runs it again first and you confirm the new result.
When a merge is refused
The check and the merge itself refuse the cases below. Nothing is moved when a merge is refused; you can choose another company or take the company over as its own company.
| Message | Why | What you can do |
|---|---|---|
| Only a Company owner of the chosen company can merge into it. | You are not the Company owner of that company. | Choose another company, or ask its owner to accept the invitation. |
| Both companies have an investment budget on the same project, so they can't be merged. | A project can have only one investment budget per company. | Choose another company, or take it over as its own company. |
| Both companies priced the same item of the same bill of quantities, so they can't be merged. | There is no rule for which of the two resource analyses would win. | Choose another company, or take it over as its own company. |
| This company holds data that can't be merged yet. | The self-managed company has data a merge does not move yet. | Take it over as its own company, or contact support. |
| You can't merge it into the company that invited you. | The inviting company cannot take over its own self-managed company. | Choose another company. |
| The chosen company's plan changed in the meantime. | Your company's plan or management changed between the check and the confirmation. | Click Try again (Опитай отново), read the new check and confirm. |
| Someone is editing this company's documents right now. Nothing was moved. | The inviting company was saving a document of the self-managed company at the same moment. | Wait a moment and click Try again (Опитай отново). |
| The company that invited you has used up today's merge checks. | The inviting company reached its daily limit of merge checks, shared by all of its invitations. | Try again the next day, or take it over as its own company. |
| Merging into an existing company isn't available yet. You can take it over as its own company. | Merging is switched off on BuildColab. | Take it over as its own company. The merge choice disappears from the page. |
The invitation itself can also be the problem: when you are signed in with another address, when it has expired, was cancelled or replaced, or the company was already taken over, the page says so for both choices.
How to switch between companies
- Click the Organization (Организация) chip at the top of the sidebar. It shows the selected company's logo or initials and name.
- In the list, click the company you want. The selected one has a check mark.
- BuildColab saves the choice on your profile and opens that company's project list.
If the current page has unsaved changes, BuildColab asks before switching. Notifications, the calendar, BORO and the project list always show the selected company only. Inside a project, the company list is in the flyout that opens when you hover over or click the company name at the top of the sidebar; see The interface: sidebar, top bar, switching. You can also switch from My profile → Organizations (Организации): each card shows the company and up to five of its projects, and clicking it selects the company.
- The Organization chip with the selected company.
- The list of your companies; the selected one is highlighted.
- The settings (cog) icon next to a company opens its Organization details.
- INVITES (ПОКАНИ) opens your received invitations.
- Create a new organization opens the create dialog.
The Organization details dialog
Click the cog next to a company in the Organization menu to open Organization details (Данни за организацията).
| Element | Who can change it | Notes |
|---|---|---|
| Logo | Company owner | PNG or JPG, at most 2 MB. |
| Organization name, uic, Phone | Company owner | Read-only for everyone else. |
| Nobody | Always read-only after creation. | |
| Update (Обнови) | Company owner | Saves the changes; disabled for other members. |
| Leave company (Напусни компанията) | Every member except the Company owner | Removes you from the company at once. |
The same company data, plus more settings, is on Admin → Organization; see Organization profile.
How to leave a company
- Click the Organization chip and the cog next to the company.
- In Organization details click Leave company (Напусни компанията).
The Company owner cannot leave: the attempt shows "The company owner cannot leave" (Собственикът на компанията не може да напусне). The owner must first hand the company to another member with Transfer role on Admin → Employees; see Members, invitations and licences.
Common questions
I was told I was invited, but my invitations page is empty. Why?
Invitations are matched to your confirmed login e-mail. Check that the invitation was sent to exactly the address you registered with and that you confirmed that address. If the company used another address, ask them to invite your login e-mail, or register a separate account with the invited address.
Who becomes the owner of a company I create?
You do. The person who creates a company gets the Company owner role with all permissions. Ownership can later be transferred to another member on Admin → Employees.
Why can't I edit the company name in Organization details?
Only the Company owner can edit the name, UIC, phone and logo. For other members the fields and the Update button are disabled. The company e-mail cannot be changed by anyone in the app.
Why does "Leave company" give "The company owner cannot leave"?
A company must always have an owner. Transfer the ownership to another member first, then leave.
I accepted an invitation but most menu entries have a padlock. Why?
Either your role does not include those modules, or the company had no free licence seat when you joined, so you work with Free-plan features until an administrator assigns you a seat. Ask your administrator to check your role and licence on Admin → Employees.
Do I have to confirm the company e-mail before I can work?
No. You can create projects and invite colleagues straight away. The confirmation is needed before the company can activate a paid plan.
The company confirmation link fails. What now?
The link is valid for 48 hours and only for the company e-mail it was sent to. Open Admin → Organization and click Resend email (Изпрати отново имейл) to get a new link.
I declined an invitation by mistake. Can I undo it?
No. Ask the company to send you a new invitation; the declined one cannot be reopened.
Why does answering an invitation give "This invitation was already answered and can no longer be accepted or declined."?
An invitation can be answered once. It was already accepted or declined, for example in another browser tab or on another device, so it can no longer be changed. The Invites from organizations (Покани от организации) page shows its current status. If it was declined and you still want to join, ask the company to send you a new invitation.
Can I belong to more than one company?
Yes. Each company appears in the Organization menu and on your profile under Organizations. Your role and permissions can be different in each company.
I already have a company on BuildColab. Do I have to take over the invited company as a second company?
No. If you are the Company owner of your company, choose Merge it into one of my companies (Обедини я с една от моите фирми) on the Take over your company profile page and pick your company. Everything the self-managed company has moves into your company, and you do not get a second company. A merge cannot be undone.
Why don't I see "Merge it into one of my companies"?
The choice appears only when you are the Company owner of at least one company on BuildColab. It also disappears when merging is not available on BuildColab; you then see "Merging into an existing company isn't available yet. You can take it over as its own company."
Can I undo a merge?
No. A merge cannot be reversed from the app: the self-managed company no longer exists as a separate company and its documents belong to the company you chose. Contact support if a merge was made by mistake.
Why does saving give "This company was merged into another company. Reload the page to continue."?
You were working on documents of a self-managed company, for example a BoQ or a payment application kept on its behalf, and the company was merged into another company in the meantime. Your change was not saved. Reload the page: it now shows the company it was merged into, and your company can no longer edit its documents on its behalf.