Contracts: signing, details and history
On this page
| Where | List: project sidebar Contracts with contractors (Договори с изпълнители), /projects/{project}/costs. Contract page: /projects/{project}/costs/evaluatedTaskList/{contract}/contract. Your own contract with your client: sidebar Contract with client (Договор с възложител), /projects/{project}/budget. A past version: /projects/{project}/contracts/{list}/contract-proposal-preview. |
|---|---|
| Who can | Project permission Execution (Изпълнение) to see contracts; Contract changes (Промени по договор) to open the change history; Reports (Отчети) to open payment applications. Paid plan or trial. |
| Related | Contract proposals, Change orders and extensions, Payment applications, Financial dashboard: committed, certified, margin |
How a contract gets signed
A contract in BuildColab is signed in exactly one of these ways. All of them are binding at once and cannot be undone.
| Way | Who clicks | Button | Notifications |
|---|---|---|---|
| Accepting a contract proposal | The contractor | Accept (Приеми) on Contract preview | The client gets an in-app notification and an e-mail. |
| Self-contract with a client outside BuildColab | Your company, for both sides | Turn into contract (Превърни в договор) → Create contract (Създай договор) | None. |
| On behalf of a self-managed subcontractor | The client, for both sides | Create contract on their behalf (Създай договор от негово име), or the Contract with a contractor (Сключи договор с изпълнител) dialog | None; the contractor has no login. |
See Contract proposals for the first way and Self-managed subcontractors and self-contracts for the other two.
What signing changes
- The contract becomes Signed, version 1.
- The contractor's offer becomes a contract and the contractor's project moves to the Execution (Изпълнение) phase.
- The contract appears in the client's Contracts with contractors list, except for a self-contract, which is never shown as a cost.
- Each contract position becomes a commitment against the matching line of the client's budget. Positions BuildColab cannot match are listed as unlinked, and the client links them by hand with Link lines (Свържи позиции). See Financial dashboard: committed, certified, margin.
- If the contracting schedule is used, the contract is linked to its package automatically when it came from that package's request or when all its positions lie in one package. See Contracting schedule and packages.
- The offer request closes as Closed · awarded once every position is awarded and every awarded offer has a signed contract.
- The contract's Financial terms (Финансови условия) are locked with the signature. The signed version shows its signing date and the advance fixed at signing.
- Payment applications can now be created against the contract. See How a payment application works.
Signed contracts are locked
A signed contract cannot be edited directly, so both sides always work from the same numbers. If someone tries to edit a signed contract's BoQ, BuildColab refuses with "A signed contract's quantity list cannot be edited directly — change it through a change order." To change quantities, prices, positions, the deadline or other terms, make a change order. See Change orders and extensions.
A contract with a general contractor carries the switch General contractor (with a management markup) (Главен изпълнител (с надбавка за управление)) in its terms. A contract drafted from an offer to a request for general contractors has it on, still without a markup (the request carries none); the client can change the switch while the contract is a draft, and sets the markup % on the draft until the proposal is sent. While the proposal waits for an answer the markup is fixed; after a decline it can be changed again. Contract with a contractor (Сключи договор с изпълнител) takes the switch and the % in the same dialog.
The GC markup (Надбавка), which the client sets in the contract terms, is locked with the signature, together with the switch: its GC markup panel is read-only, and the markup changes only through a change order. See Change orders and extensions.
The Financial terms (Финансови условия) section of the contract panel holds the terms that contract finance uses for the certificates of acceptance and payment: how the advance is deducted, the warranty deductions cap and release stages, and the payment term. The company that drafts the contract sets them with Edit (Редактирай) while the contract is a draft without a pending proposal; the other party sees them in the proposal and accepts them with it. After signing they show "The contract is signed, so its financial terms are locked. They change only with a change order or an update request." and only View (Преглед) is offered. See Contract finance: certificates, invoices and payments.
The Contracts with contractors list
The project page Contracts with contractors (Договори с изпълнители) lists every contract on which your company is the client: contracts with subcontractors on BuildColab and with self-managed subcontractors. It appears in the sidebar once your project is in the Execution phase.
| Column | What it shows |
|---|---|
| Company (Компания) | The contractor. |
| Contract subject (Предмет на договора) | The contract name and Version {n} (Версия {n}). This number is the contract's own version: 1 when signed, plus 1 for every accepted or finalized change order. It is not the version of the BoQ behind the contract, which can be higher (a subcontractor's offer may have gone through several BoQ versions before signing). Every version is listed in Contract changes → Contract change history. The pill Change proposal (Предложение за промяна) means a change proposal is waiting for an answer; click it to open the proposal. The pill Change draft (Чернова на промяна) means a change-order draft is in progress; click it to continue editing. |
| Reports (Отчети) | A progress bar of approved payment applications: "Reported {amount} · {percent}%". |
| Total value (Обща стойност) | The current contract value. For a contract with a general contractor, the total with the GC markup (Надбавка), and the subject shows the badge General contractor (Главен изпълнител); hover over the amount to see the net value and the markup. The header shows the total of all contracts, counted the same way, with the net total and the markup on hover. |
Click a row to open the contract page. With no contracts the list says "No contracts yet." (Все още няма договори.).
The contract page
The contract page is titled "Contract - {name}" (Договор - {name}) and shows the contract BoQ read-only, fully expanded. The action bar groups its buttons as on the BoQ: View (Изглед) holds View details and, on a contract with a general contractor, GC markup; Related (Свързани) holds Reports, Contract changes and, with the Contract finance permission, Finance; Exchange (Обмен) holds Export. On a narrow screen the groups fold into menus.
| Button | What it does |
|---|---|
| Export (Експорт) | Exports the contract BoQ through the export wizard into the File manager. See Exporting. |
| View details (Виж детайли) | Opens the panel Contract preview (Преглед на договор) with the BoQ total, Contract type, Payment method, Deadline, Advance payment and Warranty retention. |
| GC markup (Надбавка ГИ) | Only on a contract with a general contractor. Opens the markup panel in its locked state ("Panel · locked" (Панел · заключено)): the markup per %, the total with markup, the markup earned to date, and Propose a change with an annex (Предложи промяна с анекс), which opens the contract changes. The panel's view options show the % GC (% ГИ) and With markup (С надбавка) columns in the BoQ. Nothing can be edited here. See Profit, additional costs and totals. |
| Reports (Отчети) | Opens the payment applications of this contract. Needs Reports (Отчети) View. See Payment applications. |
| Finance (Финанси) | In Related. Opens the contract's finance panel: your company's certificates, invoices, payments, advance and warranty deductions for this contract, or Include in finance when the contract is not tracked yet. Needs the company permission Contract finance (Финанси по договори). See Contract finance: certificates, invoices and payments. |
| Contract changes (Промени по договор) | Opens the change history and the change actions. Needs Contract changes (Промени по договор) View. See below and Change orders and extensions. |
The open panel is remembered in the address, so the back button returns you to the same panel.
OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.
Figure: A signed contract with its terms open.
- The title "Contract - {name}" (Договор - {name}).
- Export (Експорт) exports the contract BoQ.
- View details (Виж детайли) opens the terms.
- Reports (Отчети) opens the payment applications.
- Contract changes (Промени по договор) opens the change history.
- The Contract preview (Преглед на договор) panel with the five terms and the total.
- The contract BoQ, read-only.
The contractor's view
The contractor opens its contract from Contract with client (Договор с възложител). The page shows the contract BoQ read-only. Its action bar groups the actions: View (Изглед) holds View details and Categories (Категории); Related (Свързани) holds Reports (Отчети) and Contract changes (Промени по договор), plus Outgoing bid requests, the schedule and Finance (Финанси); Exchange (Обмен) holds the export. An investor sees its accepted budget here under Budget (Бюджет), and the change panel is called Budget changes (Промени по бюджет).
Contract history and versions
Every contract has a version number. It starts at 1 when the contract is signed and goes up by 1 each time a change order is accepted or finalized, including each partial finalization. Before a new version is written, BuildColab keeps a snapshot of the previous one, so every earlier version can be opened with the terms and the BoQ that applied then.
The history lives in the panel Contract changes (Промени по договор), section Contract change history (История на промените по договор), newest first. Every entry shows its date and time. A version entry shows Contract - Version {n} and the Total value (Обща стойност). A proposal or answer entry shows its title, Version {n}, the Total value and the two companies, the one that made the proposal first and the one it was sent to second (proposer → recipient). An update request shows its Description (Описание) and no company.
| Entry | Meaning |
|---|---|
| Contract - Version {n} (Договор - Версия {n}) | A signed version of the contract. Review (Разгледай) opens it. |
| Contract proposal (Предложение за договор) | The original proposal was sent. |
| Accepted contract (Приет договор) / Declined contract (Отказан договор) | The contractor's answer to the original proposal. |
| Contract change proposal (Предложение за промяна по договор) | A change order was proposed. Review opens it with the changes marked. |
| Accepted contract change (Приета промяна по договор) / Declined contract change (Отказана промяна по договор) | The answer to a change proposal. |
| Update request (Заявка за актуализация) | The client asked for a change, with its Description (Описание). |
| Superseded (Заменена) | Not a history entry: a label on the page of a change proposal (opened with Review) that closed because another change was accepted first. |
For an investor's budget the entries read Budget - Version {n} (Бюджет - Версия {n}) and the section is Budget change history (История на промените по бюджет).
How to review an earlier version
- Open the contract page and click Contract changes (Промени по договор).
- In Contract change history find the version or change and click Review (Разгледай).
- The page Contract preview (Преглед на договор) opens on that version. For a change, click Show changes (Покажи промени) to mark added, changed and removed positions against the previous version; Hide changes (Скрий промени) turns the marks off.
- Click View details (Виж детайли) to see the terms that applied in that version.
OUTDATED SCREENSHOT This screenshot is out of date; the text on this page describes the current screen.
Figure: The change history of a contract.
- The panel title Contract changes (Промени по договор).
- The main action: Request update (Заяви актуализация) for the client, Make a change (Направи промяна) for the contractor.
- A version entry "Contract - Version {n}" with Review (Разгледай).
- A change entry (here Accepted contract change, Приета промяна по договор) with its version, total value and the two companies, the proposer first (proposer → recipient).
Statuses
| Contract status | Meaning | What happens next |
|---|---|---|
| Draft | Created when a contract panel opened, or a change order in progress. Terms can be edited while no proposal is pending. | Send it as a proposal, or sign it (self-contract, or on behalf of a self-managed subcontractor), or finalize it (change order). |
| Signed | Accepted by the contractor or signed for both sides. Active and locked. Its package in the contracting schedule becomes Contracted (Договорен). | Payment applications; change orders. |
| Deactivated | The proposal was declined, or a change draft was superseded by another change. The contracting schedule shows a replaced contract as Replaced (Заменен). | Nothing; kept for the record. |
The contractor's project phases around a contract
| Phase | When |
|---|---|
| Contract proposal (Предложение за договор) | A contract proposal was received and waits for an answer. |
| Execution (Изпълнение) | The contract was accepted or signed. Payment applications and change orders are possible. |
| CONTRACT DECLINED (ОТКАЗАН ДОГОВОР) | The contractor declined, or every position was awarded to someone else. |
The phase is kept separately for each company on the project. Change orders do not change the phase.
Draft contracts
A draft contract is created when you click Send to partner (Изпрати към партньор) or Create contract (Създай договор) in a contract panel, not when the panel opens. Until then the terms you enter stay in the panel only. At the same time the offer's priced positions are awarded to it if nobody else holds them. Asking BORO to draft a contract also creates one.
- A draft blocks Revise the request, Undo choice on that offer and moving its positions on the award screen.
- On the bidder's Offers page the offer carries the badge Contract being prepared (Договор в подготовка); after signing it shows Contracted (Договорена).
- A new contract's Financial terms start from your company's default financial terms, if it has any. Change them in the contract panel before you click Send to partner or Create contract: click Edit, change the terms and click Use these terms. They are saved on the contract when the draft is created, before it is sent or signed. Once the contract is signed, they change only with a change order or an update request.
- There is no button to delete a draft contract. Click Send to partner or Create contract only when you are ready to contract.
E-mails and notifications
| Event | Who is told | In-app | |
|---|---|---|---|
| Contract proposal sent | The contractor | "{partnerName} sent you a contract proposal for {contractName}" | No |
| Proposal accepted | The client | "{partnerName} accepted the contract proposal for {contractName}" | "{company} accepted the contract proposal" |
| Proposal declined | The client | "{partnerName} declined the contract proposal for {contractName}" | "{company} declined the contract proposal" |
| Change proposal sent | The other party | "A change order was submitted for {contractName} ({amountDelta})" | "{company} sent a contract change proposal" |
| Change accepted / declined | The party that proposed it | "{partnerName} accepted the change order for {contractName}" / "…declined…" | "{company} accepted the contract change proposal" / "…declined…" |
| Change superseded | The party whose proposal was replaced | "{partnerName} replaced the change order for {contractName} with a newer one" | "Your contract change request was superseded" |
| Update request | The contractor | Banner You have a contract update request on the project page | No |
| Self-contract, signing on behalf of a self-managed subcontractor, finalizing a change | Nobody | No | No |
In-app notifications about contracts are in the category Contracts (Договори). See Notifications and their settings.
Permissions and plan
| Action | Needs |
|---|---|
| See Contracts with contractors and open a contract | Execution (Изпълнение) View, project level |
| Turn into contract | Execution (Изпълнение) Edit; without it the button is gray with "You do not have permission to create contracts on this project." |
| Open Contract changes | Contract changes (Промени по договор) View |
| Open Reports | Reports (Отчети) View |
These permissions are not in the Free plan. See Permission reference and Subscription, plans and billing.
Common questions
Where do I find a contract after it was signed?
As the client: Contracts with contractors (Договори с изпълнители). As the contractor: Contract with client (Договор с възложител).
Why can't I edit the signed contract?
A signed contract is locked so both companies keep the same numbers. Make a change order instead. See Change orders and extensions.
I get "A signed contract's quantity list cannot be edited directly — change it through a change order." What does it mean?
You tried to change the BoQ of a signed contract. Open Contract changes and use Make a change (contractor) or Request update (client).
How do I see what the contract looked like before a change?
Open Contract changes, find the earlier version in Contract change history and click Review.
Why doesn't my self-contract appear under Contracts with contractors?
A self-contract is your own contract with your client. It is shown under Contract with client, never as a cost.
What is the "Change proposal" pill in the list?
A change proposal on that contract is waiting for an answer, usually yours. Click the pill to open it; if you are the side that must answer, accept or decline it there. See Change orders and extensions.